Displaying Engineering Bills of Material

This chapter discusses how to:

Note. All references to BOMs in PeopleSoft Engineering refer to EBOMs, unless there is a specific reference to manufacturing BOMs (MBOMs).

Click to jump to parent topicDisplaying Engineering BOM Structures

This section lists common elements and discusses how to:

See Also

Maintaining Engineering Bills of Material

Click to jump to top of pageClick to jump to parent topicCommon Elements Used in This Section

BOM State

Displays Engineering by default. You can also view manufacturing BOMs by selecting Manufacturing on the selection criteria page.

BOM Type

Select a BOM type. Values are:

  • Production: This is the default EBOM type.

    Manufacturing production BOMs can be used for standard manufacturing processes.

  • Rework: Create rework EBOMs when you have a standard kit of components used in rework or repair.

View

View summary data with these options:

  • Indented with Dates

  • Indented with Revs (indented with revisions)

  • Non-Indented with Dates

  • Non-Indented with Revs

The indented options provide an indented (tree) EBOM structure for the selected depth.

All Dates/Revs

Select this check box to search all effective dates and revisions for the item's EBOM.

Eff Date (effective date) and Obs Date (obsolete date)

Displays the beginning and ending dates for the EBOM.

Click to jump to top of pageClick to jump to parent topicPages Used to Display Engineering BOM Structures

Page Name

Definition Name

Navigation

Usage

Review EBOM Information - Summary

EN_BOM_INQUIRY

Engineering, BOMs and Revisions, Review EBOM Information, Engineering BOMs, Summary

View EBOM component structure at a summary level, including the indented EBOM structure.

Review EBOM Information - Output List

EN_BOM_LIST_OUT_SP

Click the Outputs link on the Attributes tab of the Review EBOM Information - Summary page.

View lower-level items for the selected EBOM.

Review EBOM Information - Component Substitutes

EN_BOM_INQ_SUB

Click the Substitutes link on the Attributes tab of the Review EBOM Information - Summary page.

Display EBOM component substitute items.

Review EBOM Information - Header: Assembly Text

EN_BOM_INQ_HEADER

Engineering, BOMs and Revisions, Review EBOM Information, Engineering BOMs, Header, Assembly Text

Display EBOM assembly text.

Review EBOM Information - Header: Assembly Attachments

EN_BOM_INQ_ATT

Engineering, BOMs and Revisions, Review EBOM Information, Engineering BOMs, Header, Assembly Attachments

Display EBOM assembly attachments.

Review EBOM Information - Header: Assembly Documents

EN_BOM_INQ_DC

Engineering, BOMs and Revisions, Review EBOM Information, Engineering BOMs, Header, Assembly Documents

Display engineering assembly documents in the embedded document management system.

By using the Documentum Component Options page in the Set Up Financials/Supply Chain navigation, you control the document management buttons that appear on this page. Inquiry pages can have only the View Document Detail and/or View Document Contents buttons available.

Review EBOM Information - Header: Outputs

EN_BOM_INQ_OUTS

Engineering, BOMs and Revisions, Review EBOM Information, Engineering BOMs, Header, Outputs

Display EBOM outputs.

Review EBOM Information - Comp Detail: Component Details

EN_BOM_INQUIRY_D

Engineering, BOMs and Revisions, Review EBOM Information, Engineering BOMs, Comp Detail, Component Details

Display EBOM component detail such as effectivity date or revision, quantity, yield, and unit of measure.

Review EBOM Information - Comp Detail: Text

EN_BOM_INQ_D_TXT

Engineering, BOMs and Revisions, Review EBOM Information, Engineering BOMs, Comp Detail, Text

Display EBOM component text.

Review EBOM Information - Comp Detail: Attachments

EN_BOM_INQ_CATT

Engineering, BOMs and Revisions, Review EBOM Information, Engineering BOMs, Comp Detail, Attachments

Display EBOM component attachments.

Review EBOM Information - Comp Detail: Documents

EN_BOM_INQ_CDC

Engineering, BOMs and Revisions, Review EBOM Information, Engineering BOMs, Comp Detail, Documents

Display engineering component documents in the embedded document management system.

By using the Component Options page in Set Up Financials/Supply Chain, you control the document management buttons that appear on this page. Inquiry pages can have only the View Document Detail and the View Document Contents buttons available.

Review EBOM Information - Comp Detail: Reference Designators

EN_BOM_INQ_REF

Engineering, BOMs and Revisions, Review EBOM Information, Engineering BOMs, Comp Detail, Reference Designators

Display EBOM component reference designators.

Comp Detail - Dimensions

EN_BOM_INQ_CDIM

Engineering, BOMs and Revisions, Review EBOM Information, Engineering BOMs, Comp Detail, Dimensions

Display EBOM component dimensions.

EBOM Report

EN_BOM_REPORT

Engineering, BOMs and Revisions, Reports, Bills of Material, EBOM Report

Generate a hardcopy report (ENS1000) for either engineering or manufacturing BOMs.

See Also

Maintaining Engineering Bills of Material

Click to jump to top of pageClick to jump to parent topicDisplaying Engineering BOM Structures

Access the Review EBOM Information - Summary page (Engineering, BOMs and Revisions, Review EBOM Information, Engineering BOMs, Summary).

Unit, Item ID, BOM Type, BOM Code, Eff Date (effective date), and Revision

Enter the basic information about the BOMs.

Depth

Indicate the number of levels that you want to view by specifying the depth to be displayed. If you select a depth of 1, this page displays only the top level of the EBOM.

Note. You can select any valid BOM code. However, the system always calculates lower levels based on the primary BOM code 1, regardless of the depth that you enter.

After you make your selections, click the Search button to view the data. The system sorts the summary in this sequence:

  1. Assembly

  2. Subassembly

  3. Component

  4. Operation sequence

  5. Effective date

Note. If a component revision is specified during BOM maintenance, the component revision appears on this tab. If the component is revision-controlled but the field is left blank because this is the current revision, this inquiry displays the current revision code for the component, based on the top-level effective date or revision entered.

Click a component ID to access component details.

Attributes tab

Outputs

Click this link to view the outputs for lower-level items (if it is a multiple output BOM).

Substitutes

Click this link to view substitute data, if substitutes exist.

See Also

Defining EBOM Outputs

Adding Substitute Components

Click to jump to top of pageClick to jump to parent topicDisplaying Engineering BOM Substitutes

Access the Review EBOM Information - Component Substitutes page (click the Substitutes link on the Attributes tab of the Review EBOM Information - Summary page).

Substitutes and related data such as conversion rate and effectivity dates appear in order of priority.

Click to jump to top of pageClick to jump to parent topicDisplaying Engineering BOM Outputs

Access the Review EBOM Information - Header: Outputs page (Engineering, BOMs and Revisions, Review EBOM Information, Engineering BOMs, Header, Outputs).

Note. Regardless of the depth entered, only outputs for the top-level item appear on this page. You can, however, use the BOM Inquiry - Summary: Summary: Attributes page to view lower-level outputs. To do this, click the Outputs link, which appears only if the component has multiple outputs on its BOM.

The system explodes primary co-products only for the BOM code specified. You can't enter a co-product and see it exploded downward. Rather, enter the primary with which the co-product is associated to view co-product details.

See Also

Defining EBOM Outputs

Click to jump to top of pageClick to jump to parent topicDisplaying Engineering BOM Component Details

Access the Review EBOM Information - Comp Detail: Component Details page (Engineering, BOMs and Revisions, Review EBOM Information, Engineering BOMs, Comp Detail, Component Details).

The header data (such as item ID, BOM type, BOM code, and revision, or effective date) are default values from the EBOM Inquiry - Summary page.

Standard component data (such as Comp Rev, Op Seq, effectivity dates, yield, subcontract supply, and teardown) appears.

Click to jump to parent topicDisplaying Summarized Engineering BOMs

This section discusses how to:

Click to jump to top of pageClick to jump to parent topicPages Used to Display Summarized Engineering BOMs

Page Name

Definition Name

Navigation

Usage

EBOM Summarized

EN_BOM_SUMMARY

Engineering, BOMs and Revisions, Review EBOM Information, EBOM Summarized, EBOM Summarized

View, at all levels, all the components that comprise an assembly's product structure. This page specifically enables you to view the quantity of components needed in an assembly regardless of level. You can also use it to determine component requirements, at all levels, based on a specific assembly demand quantity.

EBOM Summarized Outputs

EN_BOM_SUMM_OUTS

Engineering, BOMs and Revisions, Review EBOM Information, EBOM Summarized, EBOM Summarized Outputs

View output items by output type.

Click to jump to top of pageClick to jump to parent topicDisplaying Summarized Engineering BOMs

Access the EBOM Summarized page (Engineering, BOMs and Revisions, Review EBOM Information, EBOM Summarized, EBOM Summarized).

Unit, Item ID, BOM Type, BOM Code, Eff Date, and Revision

Select information to specify the BOM that you want to display.

Search

Click to display the summarized BOM.

Required Qty (required quantity)

To determine the total number of each component required at all levels to produce a particular quantity of the assembly item, enter the required quantity for the assembly item. The system multiplies each component's quantity per assembly by this required quantity to determine the component required quantity displayed on the lower half of the page.

Click the Search button again to display the calculated required quantities.

To view a summarized BOM, enter a required quantity of 1.

Depth

Enter the BOM depth. If you select a depth of 1, this page displays only the top level of the BOM.

Note. You can select any valid BOM code, but regardless of the depth that you enter, the system calculates all lower levels based on the primary BOM code (1).

Routing Code

Select the appropriate routing for the item.

Assembly Starts Qty

Displays the beginning quantity required based on the required quantity. This amount accounts for any operation yield loss during the production process.

Summary

This button lists only the component ID, description, and quantity required, and summarizes the total required quantity for the component across all levels. The quantity required accounts for both component yield and operation yield. The current quantity available from business items attributes also appears.

Detail

This button provides data for all fields and enables the View field. You can view summary data either Indented or Non-Indented. The indented option provides an indented (tree) BOM structure for the selected depth.

You can toggle back and forth between summary and detail information.

The system sorts the summary alphanumerically by component ID for level 1 items and summarizes the displayed data by quantity, regardless of where the component occurs in the product structure.

When substitute items or multiple outputs exist for a component, those links appear following the Qty Available field.

See Also

Defining EBOM Outputs

Adding Substitute Components

Click to jump to top of pageClick to jump to parent topicDisplaying Summarized Outputs

Access the EBOM Summarized Outputs page (Engineering, BOMs and Revisions, Review EBOM Information, EBOM Summarized, EBOM Summarized Outputs).

Note. The system explodes only primary co-products for the BOM code specified. Only outputs at the top level appear, regardless of the depth entered.

Expected Output Qty

Represents the anticipated output of each primary, co-product, recycle, and waste product, based on the required quantity that you enter. This is calculated as:

((Required Qty / BOM Qty) * Output Quantity)

Click to jump to parent topicDisplaying Engineering BOM Costs

This section provides an overview of engineering BOM costs and discusses how to:

Click to jump to top of pageClick to jump to parent topicUnderstanding Engineering BOM Costs

To determine the costing impact of EBOM changes to an assembly, you can display the costs of an assembly, its components, and outputs by cost type and cost version. This is especially useful for determining the costing impact of engineering BOM changes on an assembly.

The Costed EBOMs component performs a mini cost roll-up on the assembly that you enter. It calculates the assembly's cost (including all outputs) by summarizing the cost of the components and outputs based on the BOM in effect on the date specified or for the revision specified. Routing costs are not recalculated.

Here is how the system performs the cost roll-up:

You maintain cost types and versions within PeopleSoft Cost Management. Cost types enable you to do costing simulations and what-if analyses and to calculate new standard costs prior to updating your production costs. Cost versions are iterations of a particular cost calculation for a cost type. You can have multiple versions of costs for each cost type. Cost roll-ups for production items are calculated by cost type and cost version. Within PeopleSoft Engineering, you specify engineering cost versions for the cost types defined in PeopleSoft Cost Management. This enables you to perform cost roll-ups on the EBOM. You can't display costed EBOM information for rework EBOMs.

Once you've performed the engineering BOM cost roll-up using the selected cost type and engineering cost version, BOM code, and routing code, you can use this inquiry to determine what impact subsequent changes to the BOM have on the item's cost.

See Also

Defining the Cost Foundation for Makeable Items

Click to jump to top of pageClick to jump to parent topicPages Used to Display Engineering BOM Costs

Page Name

Definition Name

Navigation

Usage

Costed EBOMs

EN_BOM_INQ_COSTED

Engineering, BOMs and Revisions, Review EBOM Information, Costed EBOMs, Costed EBOMs

Display EBOM summary costs.

Output Costs

EN_BOMCOST_OUT_SP

Click the Output Costs link on the Costed EBOMs inquiry page.

Display, by output type, all lower-level costing details for each co-product based on the costing percentage split.

Detailed Costs

EN_ITEMCOST_OUT_SP

Click an Output Items field value on any of the Costed EBOMs - Output Costs inquiry pages.

Display This Level Costs and Lower Level Costs by cost element for the selected item ID and output type.

Component Detail Costs

EN_ITEMCOST_SP

Engineering, BOMs and Revisions, Review EBOM Information, Costed EBOMs, Costed EBOMs

Click a Component ID field value.

Display EBOM component details. With this page, you can display the Extended This Level Cost and Extended Lower Level Costs by cost element for the selected component item, cost type, and cost version.

EBOM Costed Report

EN_BOM_COST_REPORT

Engineering, BOMs and Revisions, Reports, EBOM Costed, EBOM Costed Report

Generate a hard copy report (ENS1010) that lists in detail associated engineering BOM costs.

See Also

ENS1010 - BOM Cost Report

Click to jump to top of pageClick to jump to parent topicDisplaying Engineering BOM Summary Costs

Access the Costed EBOMs page (Engineering, BOMs and Revisions, Review EBOM Information, Costed EBOMs, Costed EBOMs).

Unit, Item ID, Cost Type, Cost Version, BOM Code, and Routing Code

Select the appropriate information for the BOM that you want to view.

Cost Version

Select an engineering cost version that is valid for the cost type selected. Also, to correctly calculate the total cost, costs for each of the assembly item's purchased components must exist for the cost type and cost version selected. This is accomplished by rolling up the cost type and version within PeopleSoft Cost Management.

BOM Code

As long as the BOM exists, you can enter a BOM code other than the one used for the latest cost type version where a roll-up was performed. In this case, the Output Costs page does not display any cost version cost details, because the cost details do not exist (no roll-up was performed). In addition, if you enter a BOM code that doesn't exist for a cost version, the routing code is deselected and no This Level costs are included in the calculations.

When the BOM code is valid for a cost version, then the routing code must be valid for the cost version as well, because this is used to calculate the This Level costs for the inquiry.

Eff Date or Revision

Enter this information for the BOM that you want to view. You can select any valid BOM code, but regardless of what depth you enter, the system calculates all lower levels based on the primary BOM code.

Cost as Batch

If the item and BOM code entered is a multi-output item (that is, it has co-products), then the Cost as Batch check box is selected and is display-only. In this case, the results rendered by the inquiry represent the total cost of the batch (as opposed to one unit of the batch) and the required quantities, and the extended cost calculated is for the entire batch (based on the BOM quantity).

If the item is a single output item having a BOM quantity greater than one, you have the option to cost as batch. In this case, you can choose to cost the item in terms of the production of one unit of the end item or choose to cost as batch, in which all component costs and This Level Costs are scaled up based on the BOM quantity (similar to a multi-output item).

In other words, the purpose of the Cost as Batch is to allow single output items (which are normally displayed based on a quantity of 1) to have the component and output quantities and costs displayed based on their full BOM quantities. For example, if an item had a BOM quantity of 10 and the check box is deselected, then the costs would appear based on a BOM quantity of 1. If the check box was selected, costs would appear based on a BOM quantity of 10.

View

Select how you want to view summary data: Indented or Non-Indented. The indented option provides an indented (tree) BOM structure for the selected depth.

After you've made your selections, click the Search button to display component costed information for as many levels as you entered in the Depth field. The system derives the cost of the assembly from the component's This Level and Lower Level costs for the cost type, version, BOM, and routing code selected. It calculates cost for all assemblies and subassemblies that fall within the depth selected. If the BOM code entered is not 1, then the outputs within the Output Costs link reflect the outputs for the BOM code entered, and the components listed for level 1 are based on that BOM code. Lower levels always use BOM code 1. The routing code entered is used solely to determine This Level costs included in the calculation for inquiry total costs.

Note. While you can run a Costed EBOMs Summary inquiry for a purchased item that has an EBOM, the system calculates only the material costs, based on the material costs for the components specified and the cost type and version that you select.

Extended Cost

Displays the extended cost, which is the component's cost for the cost type and version specified, multiplied by the cost required quantity standard unit of measure. The Cost Required Qty Std UOM represents the quantity needed for each component to build the item ID specified. This depends on the Cost as Batch setting; if it's selected, it would be the required quantity to build the batch, and if it's not selected it's the required quantity to build one of the items. The Cost Required Qty Std UOM factors in assembly BOM quantity, component quantity per assembly or order, and component yield. Even though they have only a purchased cost associated with them, by-products also appear. If the by-product is a recycle by-product, then the cost is negative; if it's a waste by-product, then the cost is positive, unless the item doesn't have a purchase cost, in which case the cost is zero.

Note. If the component is displayed as a subassembly, only the This Level costs appear on this page for the subassembly. Lower Level costs for the subassembly appear within the child components of the subassembly.

Total Cost

Displays the total cost, which is the sum of all the extended costs of all components on an EBOM for a specific effectivity date or revision, plus any This Level costs for the item. The system computes the costs for each component, and then sums for the assembly item.

For assemblies that have by-products: Even though they have only a purchased cost associated with them, by-products also appear. If it's a recycle by-product, the cost impact is negative and is subtracted from the total cost. If it's a waste by-product, the cost is positive, and is added to the total (unless the item didn't have a purchase cost, in which case the cost is zero).

Revision-Controlled EBOMs: Depth Information

It is best to select the maximum depth for revision-controlled EBOMs.

There are times when the same revision-controlled EBOM may reflect different costs. For example:

If you enter a depth less than the maximum number of levels for the costed EBOM, the lower-level costs displayed reflect the costs generated by the original cost roll-up for this cost version and date.

If, however, you enter the maximum depth for the costed EBOM, the lower-level costs displayed reflect the most current BOM and routing, not the cost version that you entered on the Costed EBOMs Summary page.

In addition, if changes occur to the EBOM and routing after the cost roll-up, the cost of the EBOM where you have entered a depth less than the maximum may reflect something different from the cost from the maximum depth EBOM. Both of these costed EBOMs are considered correct, depending on the depth that you enter.

The following diagram illustrates the cost calculation for a revision-controlled bill of material. This case can apply to either a manufacturing BOM or engineering BOM:

The following diagram illustrates how your entry in the Depth field of the Engineering BOM Costed - Costed EBOMs inquiry page can impact the top-level cost. In this case, component G was replaced with the higher-cost component H on April 1st. The last cost rollup was on March 1st. If the depth field has a value of 1, then the displayed top-level cost on the Engineering BOM Costed - Costed EBOMs inquiry page does not display the new component cost. However, if the depth is 5, then the new component is used and the newer top-level cost is displayed:

Cost calculation example showing impact of depth selection during inquiry

See Also

Defining the Cost Foundation for Makeable Items

Displaying Engineering BOM Component Detail Costs

Click to jump to top of pageClick to jump to parent topicDisplaying Output Costs

Access the Output Costs inquiry page (Engineering, BOMs and Revisions, Review EBOM Information, Costed EBOMs, Costed EBOMs, then click the Output Costs link).

Note. Due to rounding differences, you may see a small variance (+ or − 0.0003) between the cost version costs and the inquiry costs in this inquiry. This occurs when the system displays the costed BOM results for an item that's either a batch item or has batch assembly items at lower levels.

Item Cost Details tab

Select the Item Cost Details tab on the Output Costs page.

Cost Version Item Cost

Displays the last stored cost.

Inquiry Item Cost

Displays the new cost of the item being queried.

Delta

Displays the difference between the cost version item cost and the inquiry item cost.

Batch Cost Details tab

You can select this tab only if you selected Cost as Batch on the Costed BOM page.

This tab displays BOM cost broken down by output type. For example, a process has two co-products: A and B. co-product A has a cost allocation percentage of 60, and co-product B has a cost percentage of 40. One row displays A, with 60 percent of the costs, and another row displays B, with 40 percent of the costs.

Inquiry Batch Cost

Displays the total cost from the Costed BOM page multiplied by the cost percentage of the primary product or co-product.

Note. The cost percentages must equal 100.

See Also

Defining EBOM Outputs

Assigning Associated Primary BOMs

Click to jump to top of pageClick to jump to parent topicDisplaying Engineering BOM Component Detail Costs

Access the Component Detail Costs inquiry page (Engineering, BOMs and Revisions, Review EBOM Information, Costed EBOMs, Costed EBOMs. Click a Component ID field value).

Cost Elmnt (cost element)

Displays a category of costs defined by you, such as materials, labor, or overhead.

Extended This Level Cost

Displays the item's extended cost of putting the components together. This cost is also known as the conversion cost.

Extended Lower Level Cost

Displays the item's extended cost of its components prior to their assembly at this level.

Total

The field on the left sums the This Level Costs for all cost elements, and the field on the right sums the Lower Level Costs for all cost elements.

Example

If A is a component on an assembly and is itself a subassembly composed of components B and C, and the cost of B is 20.00, and the cost of C is 30.00, then A's Lower Level Cost is 50.00 (not considering extended costs). If the cost of putting B and C together is 25.00, then A's This Level Cost is 25.00. For the assembly on which A is a component, the top-level assembly's Lower Level Cost is 75.00 (A's This Level Cost plus the Lower Level Cost).

Rounding

PeopleSoft Cost Management calculates the different extended costs by multiplying cost by the calc quantity. It then displays the cost results to four decimal places for viewing purposes. Calc quantity can represent a value from 4 to 10 decimal places. The QPA rounding setting determines the decimal range for the calc quantity.

Note. The content of this section is only part of what you need to know to define QPA rounding. Other relevant information, because it is common to many applications, is located in PeopleSoft Enterprise Application Fundamentals PeopleBook.

See Also

Setting Installation Options for PeopleSoft Applications

Click to jump to parent topicComparing Engineering BOMs

This section lists common elements and discusses how to:

See Also

Maintaining Engineering Bills of Material

Click to jump to top of pageClick to jump to parent topicCommon Element Used in This Section

Differences

Displays the differences between the two BOMs. Values are:

  • Added: The component ID has been added to the compare BOM (BOM2).

  • Deleted: The component has been deleted from the compare BOM (BOM2).

    The system determines whether a component has been deleted, by comparing the component IDs, operation sequences, and effectivity dates; this is what makes a component unique within a BOM.

  • Chg BOM1: If you have made a component change, you see the components listed.

    The system lists a change when any information other than component ID, operation sequence, or effective date has changed.

  • Chg BOM2: If you have made a component change, you see the components listed.

    The system lists a change when any information other than component ID, operation sequence, or effective date has changed.

Click to jump to top of pageClick to jump to parent topicPages Used to Compare Engineering BOMs

Page Name

Definition Name

Navigation

Usage

Compare EBOMs - BOM Selections

EG_BOM_COMPARE1E

Engineering, BOMs and Revisions, Review EBOM Information, Compare EBOMs, BOM Selections

Compare a baseline BOM to an engineering BOM within the same business unit. You can compare any two EBOMs or compare an EBOM to an MBOM.

BOM Selections - Component Details

EG_BOM_COMPARE2

Engineering, BOMs and Revisions, Review EBOM Information, Compare EBOMs, BOM Selections, Component Details, Component Details

Compare component ID BOM differences, including standard unit of measure and source code.

BOM Selections - Component Details: Attachments

EG_BOM_COMPARE8

Engineering, BOMs and Revisions, Review EBOM Information, Compare EBOMs, BOM Selections, Component Details, Attachments

Compare the component attachment differences between two BOMs.

BOM Selections - Component Details: Documents

EG_BOM_COMPARE7

Engineering, BOMs and Revisions, Review EBOM Information, Compare EBOMs, BOM Selections, Component Details, Documents

Compare component document differences for two BOMs.

BOM Selections - Component Details: Reference Designators

EG_BOM_COMPARE9

Engineering, BOMs and Revisions, Review EBOM Information, Compare EBOMs, BOM Selections, Component Details, Reference Designators

Compare the reference designator differences between two BOMs.

BOM Selections - Component Details: Dimensions

EG_BOM_COMPARE5

Engineering, BOMs and Revisions, Review EBOM Information, Compare EBOMs, BOM Selections, Component Details, Dimensions

Compare component dimensions for two BOMs.

BOM Selections - Component Details: Substitutes

EG_BOM_COMPARE_SUB

Engineering, BOMs and Revisions, Review EBOM Information, Compare EBOMs, BOM Selections, Component Details, Substitutes

Compare substitute item differences for EBOM comparison.

BOM Selections - Assembly Header: Differences

EG_BOM_COMPARE1D

Engineering, BOMs and Revisions, Review EBOM Information, Compare EBOMs, BOM Selections, Assy Header, Differences

Compare the assembly differences of two BOMs, specifically BOM types, BOM quantity, and text.

BOM Selections - Assembly Header: Attachments

EG_BOM_COMPARE1C

Engineering, BOMs and Revisions, Review EBOM Information, Compare EBOMs, BOM Selections, Assy Header, Attachments

Compare the assembly attachment differences of two BOMs.

BOM Selections - Assembly Header: Documents

EG_BOM_COMPARE1B

Engineering, BOMs and Revisions, Review EBOM Information, Compare EBOMs, BOM Selections, Assy Header, Documents

Compare the document differences of two BOMs.

BOM Selections - Assembly Header: Outputs

EG_BOM_COMPARE10

Engineering, BOMs and Revisions, Review EBOM Information, Compare EBOMs, BOM Selections, Assy Header, Outputs

Compare the output differences of two BOMs.

EBOM Compare Report

EN_BOM_COMP_REPORT

Engineering, BOMs and Revisions, Reports, EBOM Comparison, EBOM Compare Report

Select the engineering BOMs, or the manufacturing and engineering BOMs that you want to compare.

EBOM Compare Report - Print Options

EN_BOM_COM_REPORT2

Engineering, BOMs and Revisions, Reports, EBOM Comparison, EBOM Compare Report, Print Options

Select details that you want to appear in the Engineering BOM Compare report (ENS1005).

See Also

ENS1005 - Compare BOMs Report

Click to jump to top of pageClick to jump to parent topicSelecting BOMs to Compare

Access the Compare EBOMs - BOM Selections page (Engineering, BOMs and Revisions, Review EBOM Information, Compare EBOMs, BOM Selections).

Baseline BOM (BOM1)

Item ID

Select an item for the baseline BOM.

BOM Code

Select a BOM code for the baseline BOM. You can select any valid BOM code, but regardless of what depth you enter, the system calculates all lower levels based on the primary BOM code.

Eff Date

Enter the effective date for the baseline BOM if you do not want to use all dates and revisions.

All Dates/Revs

Select to compare all effective dates and revisions for the baseline BOM.

Target BOM (BOM2)

Item ID

Select an item for the baseline BOM.

BOM Code

Select a BOM code for the baseline BOM. You can select any valid BOM code, but regardless of what depth you enter, the system calculates all lower levels based on the primary BOM code.

Eff Date

Enter the effective date for the baseline BOM if you do not want to use all dates and revisions.

All Dates/Revs

Select to compare all effective dates and revisions for the baseline BOM.

Compare BOMs

Click this button to compare the selected BOMs.

Click to jump to top of pageClick to jump to parent topicComparing Component Detail Differences

Access the BOM Selections - Component Details: Component Details page (Engineering, BOMs and Revisions, Review EBOM Information, Compare EBOMs, BOM Selections, Component Details, Component Details).

The header data consists of default values from the Compare EBOMs - BOM Selections inquiry page.

Rtg/BOM/PID tab

This page displays routing, BOM, and production ID differences between the selected BOMs.

Subs Exist

If substitutes exist for a component, this field is selected. If no substitutes exist, this field is unavailable for selection.

Sub Supply

Selected if the component is supplied by a subcontractor. If the component is not a subcontracted item, the field is unavailable for selection.

Click to jump to top of pageClick to jump to parent topicComparing Substitute Item Differences

Access the BOM Selections - Component Details: Substitutes page (Engineering, BOMs and Revisions, Review EBOM Information, Compare EBOMs, BOM Selections, Component Details, Substitutes).

The header data consists of default values from the Compare EBOMs - BOM Selections inquiry page.

Substitute Items tab

The system displays the substitute differences, including the substitute item ID, description, and the original component ID.

Attributes tab

The system displays the substitute differences, including the substitute item ID, operation sequence, effective date, priority, standard unit of measure, and conversion rate.

Click to jump to top of pageClick to jump to parent topicComparing Assembly Outputs

Access the BOM Selections - Assembly Header: Outputs page (Engineering, BOMs and Revisions, Review EBOM Information, Compare EBOMs, BOM Selections, Assy Header, Outputs).

The header data consists of default values from the Compare EBOMs - BOM Selections inquiry page.

Dates tab

This page displays output date differences, including information such as output type, output item, operation sequence, and effectivity dates.

Attributes tab

This page displays attribute differences, including information such as output type, output item, standard unit of measure, quantity per, source code, serial control, and resource allocation and cost allocation percentages.

Click to jump to parent topicViewing Item Where-Used Information

This section discusses how to view item where-used information.

Click to jump to top of pageClick to jump to parent topicPages Used to View Item Where-Used Information

Page Name

Definition Name

Navigation

Usage

Item Where Used (inquiry)

EG_BOM_WHEREUSED

Engineering, BOMs and Revisions, Review EBOM Information, Item Where Used, Item Where Used

View all of the EBOMs on which an item appears. You'll find this information useful when you want to analyze the impact that a change in an item can have on all existing BOMs.

Item Where Used (report)

EN_WHEREUSED_RPT

Engineering, BOMs and Revisions, Reports, Item Where Used

Generate the Components/Substitutes Where Used Report (ENS2000). You can generate a hard copy report that lists all the EBOMs on which a component appears. You'll find this information useful when you want to analyze the impact that a component change can have on all existing EBOMs or MBOMs.

Item Where Used Express

EN_ITEMWHERE_USED

Engineering, BOMs and Revisions, Review EBOM Information, Item Where Used Express, Item Where Used Express

View the engineering BOMs on which components are used. This information is useful when you want to analyze the impact a change to an item can have on all existing EBOMs.

See Also

ENS2000 - Item Where Used Report

Click to jump to top of pageClick to jump to parent topicViewing Item Where-Used Information

Access the Item Where Used page (Engineering, BOMs and Revisions, Review EBOM Information, Item Where Used, Item Where Used).

Search

Select a value to display only certain types of data. Values are: Components Only, Components and Substitutes, Outputs Only, and Substitutes Only.

Unit, Item ID, BOM Type, Eff Date or Revision, and BOM Code.

Enter this information about the item, as appropriate.

Levels Up

Enter 1, to view only the item's parent assembly. The larger the number, the higher the level; for example, level 3 is three levels higher in the BOM structure than the item. To view only the final end item in which the selected item is an item, select Top Levels only. If you have requested more than one level, an arrow appears next to the item's immediate parent in the Item ID field.

Note. Do not confuse the Levels Up field with the Depth field on the BOM inquiry pages. Levels Up looks up the BOM structure; Depth looks down the structure. The Levels Up field is available only for BOM code 1.

Search

Click to retrieve the selected item where-used information.

If you selected Components Only or Components and Substitutes, the system displays all higher-level subassemblies or assemblies that contain the selected item. You also see the levels at which the items appear in the higher-level items. The left arrow (←) in the display points to the item that directly uses the item selected.

Components and Substitutes and Substitutes Only appear if the component for the item is a substitute.

If you selected Outputs Only, the system displays information by output type, including:

If the component is revision-controlled, a Comp Rev field also appears as a search parameter. If you enter a component revision, this page returns all assemblies where that component matches or is blank. If you leave the component revision blank, the inquiry returns assemblies that use any revision of the component.

See Also

Component Use Up

Click to jump to parent topicViewing BOM and Routing Transfer and Copy Data

The system makes a BOM Transfer/Copy Audit page entry for each EBOM transferred or copied to production. You can display all items whose EBOMs or BOMs you have copied or transferred by selecting by viewing the BOM Transfer/Copy Audit page.

Similarly, the system makes a Routing Transfer/Copy Audit page entry for each engineering routing (ERTG) transferred or copied to production. You can display all items whose ERTGs or manufacturing routing (MRTG) you have copied or transferred by viewing the Routing Transfer/Copy Audit page.

See Also

Transferring BOMs and Routings