Sun Logo


Sun Fire E25K/E20K Systems Site Planning Guide

Site Planning Guide

817-4137-13



Contents

Figures

Tables

Preface

1. Physical Specifications

1.1 System Components

1.2 System Cabinet Physical Specifications

1.3 Raised Floor Installations

1.4 Non-Raised Floor Installation

1.5 Cabinet Floor Caster Weight Load

1.6 Planning Your Access Route

2. Environmental Requirements

2.1 Environmental Requirements

2.1.1 Suggested Ambient Temperatures

2.1.2 Suggested Ambient Relative Humidity

2.2 Basic Cooling Requirements

2.3 Computer Room Layout

3. Facility and System Requirements

3.1 Facility Power Requirements

3.2 Cabinet Grounding Requirements

4. Network Planning

4.1 Network Connections

4.2 System Setup Information

4.3 Network Configurations

4.3.1 HA Network Configuration

4.3.2 Non-HA Network Configuration

4.4 System Setup Worksheets

4.4.1 Platform Name

4.4.2 Internal Networks

4.4.2.1 I1 Network

4.4.2.2 I2 Network

4.4.3 External Networks

4.4.3.1 System Controller

4.4.3.2 Domains

5. Site Planning Checklists

5.1 System Components

5.2 Miscellaneous

5.3 Environmental Requirements

5.4 Physical Specifications

5.5 Network Planning

5.6 Planning Your Access Route

5.7 Installation Schedule

A. Power and Cooling, and System Setup Worksheets