Previous Next Contents Home


Chapter 1

Getting Started




This guide shows you how to install the Sun EnterpriseTM 420R workgroup server into a Sun expansion cabinet or other EIA-compliant rack enclosure.

The following tasks and information topics are covered in this guide:


Getting Started

To install a Sun Enterprise server, complete the following tasks in the order listed:


Unpack the System

Your system is shipped from the factory with most internal options installed. Peripherals that are not factory installed are shipped separately. Unpacking instructions are printed on the outside of the shipping carton.

Inspect all shipping cartons for evidence of physical damage. If a shipping carton is damaged, request that the carrier's agent be present when the carton is opened. Keep all contents and packing material for the agent's inspections.

Check that you've received all of the parts you ordered. Contact Sun Microsystems or your distributor/reseller if you are missing anything.


Verify the Kit Contents

The shipping carton contains the following parts:


Accessory Box Contents

The accessory box contains the following parts:

The accessory box contains a plastic bag of assorted hardware: screws, nuts, and washers, shown in actual size. You will need this hardware to install the rackmounting brackets and slide assemblies.


Note - Bar nuts are required (but not included) for non-threaded rack enclosures. See your rack enclosure instructions for more information. Bar nuts are not used in Sun rack enclosures.



Previous Next Contents Home

Copyright © 2001 Sun Microsystems, Inc. All Rights Reserved.