C H A P T E R  5

Feedback Cabling the Server

This chapter provides instructions for cabling the server. Topics include:



Note - Both AC and DC versions of the server must be installed in a restricted-access location.




caution icon Caution - The Sun Netra T5220 must not be directly connected to Outside Plant cables.



Cable Connections and Ports

The following list describes the server’s cable connections and ports:

Connector Locations

FIGURE 5-1 shows the connectors on the rear panel of the Sun Netra T5220 server.

FIGURE 5-1 Rear Panel Connectors and Features on the Sun Netra T5220 Server


Figure showing the rear panel LEDs and cable connectors


Figure Legend

1

Power Supply 0 LEDs top to bottom: Locator LED Button, Service Required LED, Power OK LED

2

Power Supply 0

3

Power Supply 1 LEDs top to bottom: Locator LED Button, Service Required LED, Power OK LED

4

Power Supply 1

5

Captive screw for securing motherboard (1 of 2)

6

System LEDs left to right: Locator LED Button, Service Required LED, Power OK LED

7

Service Processor Serial Management Port

8

Service Processor Network Management Port

9

Captive screws for securing the bottom PCI cards. Each bottom card has screws on both sides

10

Gigabit Ethernet Ports left to right: NET0, NET1, NET2, NET3

11

Alarm Port

12

USB ports left to right: USB0, USB1

13

TTYA Serial Port

14

Captive screw for securing motherboard (2 of 2)

15

PCI-X Slot 3

16

PCIe or XAUI Slot 0

17

PCI-X Slot 4

18

PCIe or XAUI Slot 1

19

PCIe Slot 5

20

PCIe Slot 2


Status Indicator Locations

FIGURE 5-2 shows the status indicators on the front panel of the Sun Netra T5220 server.

FIGURE 5-2 Location of the Bezel Server Status and Alarm Status Indicators


Figure showing the the location of the server and alarm status indicators on the front bezel


Figure Legend

1

User (amber) Alarm Status Indicator

5

Locator LED

2

Minor (amber) Alarm Status Indicator

6

Fault LED

3

Major (red) Alarm Status Indicator

7

Activity LED

4

Critical (red) Alarm Status Indicator

8

Power LED



TABLE 5-2 Bezel Server Status Indicators

Indicator

LED Color

LED State

Component Status

Locator

White

On

Server is identified with the superuser locator or ILOM setlocator command.

 

 

Off

Normal state

Fault

Amber

On

The server has detected a problem and requires the attention of service personnel.

 

 

Off

The server has no detected faults.

Activity

Green

On

The server is powered up and running the Solaris Operating System.

 

 

Off

Either power is not present or the Solaris software is not running.



Connecting the Server Cables

To boot the server, you must connect and configure the network and serial ports. The procedures are given in the following sections.

The server also has serial and USB ports available for connections to optional devices (see Cable Connections and Ports).



Note - When you are finished connecting the cables to the server, ensure that the server can slide smoothly in and out of the rack without binding or damaging the cables.



procedure icon  To Connect the Service Processor Serial Management Port

The service processor serial management port is marked SER MGT (FIGURE 5-3). It is the leftmost RJ-45 port on the rear panel.



Note - The cable and DB-9 RJ-45 adapters are for the host serial port, and not for the server SER MGT port.


FIGURE 5-3 Service Processor Serial Management Port - Rear Panel


Figure showing the serial management port

Use this port for server management. This port is needed to set up the service processor network management port, as detailed in Enabling the Service Processor Network Management Port.



Note - Use the service processor serial management port only for server management. It is the default connection between the service processor and a terminal or a computer.




caution icon Caution - Do not attach a modem to this port.


single-step bullet  Connect a Category 5 cable from the SER MGT serial management port to the terminal device.

When connecting either a DB-9 or a DB-25 cable, use an adapter to perform the crossovers given for each connector.


procedure icon  To Connect the Service Processor Network Management Port

The service processor network management port is labeled NET MGT (FIGURE 5-4). It is located just to the right of the serial management (SER MGT) port on the rear panel.

FIGURE 5-4 Service Processor Network Management Port - Rear Panel


Figure showing the network management port



Note - This port is not operational until you configure the network settings (through the serial managment port), as detailed in Configuring the Service Processor Network Management Port.




Note - If you have access to a DHCP server on the network, you can see the service processor get an IP address because the DHCP client is enabled by default.




Note - The service processor network management port is configured by default to retrieve network settings with Dynamic Host Configuration Protocol (DHCP) and allow connections using Solaris Secure Shell (SSH). You might need to modify these settings for your network. Instructions are given in Chapter 6.


single-step bullet  Connect a Category 5 cable from the NET MGT network management port to your network switch or hub.


procedure icon  To Connect the Ethernet Network Cables

The server has four network connectors, marked NET0, NET1, NET2, and NET3 (FIGURE 5-5). These connectors are RJ-45 Gigabit Ethernet.

FIGURE 5-5 Service Processor Ethernet Network Ports - Rear Panel


Figure showing teh Ethernet network ports

1. Connect a Category 5 cable from your network switch or hub to Ethernet Port 0 (NET0) on the rear of the chassis.

NET0 is the farthest left port in the 4-port network cluster in FIGURE 5-5.

2. Connect Category 5 cables from your network switch or hub to the remaining Ethernet ports (NET1, NET2, NET3), as needed.



Note - The LEDs located above each NET port are Link/Activity (left) and Speed (right) indicators for each port.



procedure icon  To Connect AC Power Cables to the Server

Powering on the system for the first time requires special preparation and procedures. For example, if you have not prepared a display before connecting the AC power cable, system messages might be lost.



caution icon Caution - Finish the hardware procedures in this chapter, but do not attach the AC power cable yet.


Powering on the system for the first time requires special preparation and procedures. For example, if you have not prepared a display before connecting the AC power cable, system messages could be missed.



caution icon Caution - The server goes into Standby mode and the service processor initializes as soon as the AC power cable is connected to the power source.


single-step bullet  Go to Powering On the System for the First Time for instructions on connecting the server to AC power.


DC Operation Conditions and Procedures

This section provides DC power cabling and requirements information.

DC Power Source Requirements

TABLE 5-3 lists DC power source requirements for each power supply in the Sun Netra T5220 server, and TABLE 5-4 lists DC power source requirements for the server as a whole.


TABLE 5-3 DC Operating Power Limits and Ranges for Each Power Supply in the Server

Description

Limit or Range

Operating input voltage range

-40 VDC to -75 VDC nominal

Maximum operating input current

11.7 A

Maximum operating input power

660 W



TABLE 5-4 DC Operating Power Limits and Ranges for the Server

Description

Limit or Range

Operating input voltage range

-40 VDC to -75 VDC

Maximum operating input current

23 A

Maximum operating input power

900 W


The server must meet the following:



Note - The DC version of the server must be installed in a restricted-access location. According to the intent of the National Electrical Code, a restricted-access location is an area intended for qualified or trained personnel only and has access controlled by a locking mechanism, such as a key lock or an access card system.


DC Supply and Ground Conductor Requirements

The server must meet the following:



Note - Depending on the DC power source, the -48V (negative terminal) might be marked with a minus (-) symbol, and the -48V Return (positive terminal) might be marked with a positive (+) symbol.


When attaching DC cables, keep the following requirement in mind:



caution icon Caution - You must restrict the connection of the Sun Netra T5220 server to the DC power source to minimize the possibility that transient energy will appear on the main input to the equipment. The DC battery power source must be in the same premises as the server. The server cannot be in one building with the power source in another building.


Overcurrent Protection Requirements



Note - Overcurrent protection devices must meet applicable national and local electrical safety codes and be approved for the intended application.



procedure icon  To Assemble the DC Input Power Cable

1. Identify the parts that you will use to assemble the DC input power cable (FIGURE 5-6).

The following DC connection parts are required to assemble one or more DC power input cables. These cables connect the -48V DC input source(s) to the power supply units.

FIGURE 5-6 DC Connection Parts


Figure showing the DC input plug and cage clamp operating lever


Figure Legend

1

DC input plug

2

Cage clamp operating lever


2. Turn off power from the DC power source through the circuit breakers.



caution icon Caution - Do notproceed with these instructions until you have turned off the power from the DC power source through the circuit breakers.


3. Get a DC input plug from the ship kit.

4. Locate the three wires coming from the DC power source that will be used in the connection to your unit:



Note - Depending on the DC power source, the -48V (negative terminal) might be marked with a minus (-) symbol, and the -48V Return (positive terminal) might be marked with a positive (+) symbol.


5. Strip 5/16 inches (8 mm) of insulation from each of the wires coming from the DC power source.

Do not strip more than 5/16 inches (8 mm) from each wire. Doing so leaves uninsulated wire exposed from the DC connector after the assembly is complete.

FIGURE 5-7 Stripping the Insulation From the Wire


Figure showing the amount of insulation to strip from the wire (5/16 inches)

6. Open the cage clamp for this section of the DC input plug by taking one of the following actions:

FIGURE 5-8 Opening the DC Input Plug Cage Clamp Using the Cage Clamp Operating Lever


Figure showing how to open the DC input plug cage clamp using the cage clamp operating lever

FIGURE 5-9 Opening the Cage Clamp Using a Screwdriver


Figure showing how to open the cage clamp using a screwdriver

7. Feed the exposed section of the appropriate wire into the rectangular plug hole in the DC input plug.

FIGURE 5-10 shows which wires should be inserted into each hole in the DC input plug.

FIGURE 5-10 Assembling the DC Input Power Cable


Figure showing how to assemble the DC input power cable


Figure Legend

1

Top of connector

3

From chassis ground (green/yellow)

2

From -48V return

4

From -48V


8. Repeat Step 6 and Step 7 for the other two wires to complete the assembly of the DC input power cable.

9. Repeat Step 4 through Step 8 to create as many DC input power cables as you need for your unit.

You need two DC input power cables for each of the power supplies.

If you need to remove a wire from the DC input plug, insert the cage clamp operating lever or a small screwdriver into the slot directly above the wire and press down (FIGURE 5-8 and FIGURE 5-9). Pull the wire from the DC input plug.

Feedback