Understanding Switch Specifications
Understanding InfiniBand Cabling
Understanding the Installation
Install the Switch in the Rack
Verifying the InfiniBand Fabric
Administrative Command Overview
Display Switch Firmware Versions
Locate a Switch Chip or Connector From the GUID
Display Switch Chip Boot Status
Display Switch Chip Port Status
Monitoring the InfiniBand Fabric
Controlling the InfiniBand Fabric
Understanding Service Procedures
The env_test command enables you to perform several investigative tasks, helping you determine the internal environment and operational status of the switch.
On the management controller, type:
# env_test NM2 Environment test started: Starting Voltage test: Voltage ECB OK Measured 3.3V Main = 3.28 V Measured 3.3V Standby = 3.40 V Measured 12V = 12.06 V Measured 5V = 5.10 V Measured VBAT = 3.17 V Measured 1.8V = 1.78 V Measured 1.2V Standby = 1.21 V Measured 1.8V Standby = 1.80 V Measured 2.5VA = 2.51 V Measured 2.5VB = 2.51 V Measured 1.2VA = 1.22 V Measured 1.2VB = 1.22 V Measured 1.2VC = 1.21 V Measured 1.2VD = 1.21 V Measured 1.2VB = 1.21 V Measured 1.2VE = 1.21 V Measured 1.2VF = 1.21 V Voltage test returned OK Starting PSU test: PSU 0 present PSU 1 present PSU test returned OK Starting Temperature test: Back temperature 23.00 Front temperature 32.62 ComEx temperature 26.12 I4-A temperature 55, maxtemperature 56 I4-B temperature 48, maxtemperature 49 I4-C temperature 53, maxtemperature 53 I4-D temperature 48, maxtemperature 49 I4-E temperature 53, maxtemperature 54 I4-F temperature 53, maxtemperature 54 Temperature test returned OK Starting FAN test: Fan 0 running at rpm 12433 Fan 1 running at rpm 12311 Fan 2 running at rpm 12311 Fan 3 running at rpm 12433 Fan 4 running at rpm 12433 FAN test returned OK Starting Connector test: Connector test returned OK Starting I4 test: I4-A OK I4-B OK I4-C OK I4-D OK I4-E OK I4-F OK All I4s OK I4 test returned OK NM2 Environment test PASSED #
Switch Reference, env_test command