Sun Netra X4250 Server
Installation Guide
820-4055-11
|
Contents |
Chassis Controls, LEDs, and Connectors
Preinstalled Solaris Operating System
Remote Manageability With ILOM
High Levels of System Reliability, Availability, and Serviceability
Hot-Pluggable and Hot-Swappable Components
Support for RAID Storage Configurations
Additional Power System Information
Changing Sun Netra Rack Servers from AC to DC Input or From DC to AC Input
Optional Component Installation
3. Mounting the Server Into a 4-Post Rack
Hardmounting the Server in a 19-Inch 4-Post Rack
Hardmount 19-Inch 4-Post Rack Kit

To Install a Server With a Hardmount 19-Inch 4-Post Rack
Mounting the Server in a Sliding Rail Mount 19-Inch 4-Post Rack
Sliding Rail Mount 19-Inch 4-Post Rack Kit

To Install a Server With a Sliding Rail Mount in a 19-Inch 4-Post Rack
Hardmounting the Server in a 600-mm 4-Post Rack
Hardmount in a 600-mm 4-Post Rack Kit

To Install a Server With a Hardmount in a 600-mm 4-Post Rack
Installing a Server With a Sliding Rail Mount in a 19-Inch 4-Post Rack for Use With the Cable Management Assembly

To Install the Slide Rail Assemblies

To Install the Cable Management Assembly

To Verify the Operation of the Slide Rails and the CMA
4. Mounting the Server Into a 2-Post Rack
Hardmounting the Server in a 23-Inch 2-Post Rack
Hardmount 23-Inch 2-Post Rack Kit

To Install a Server With a Hardmount in a 23-Inch 2-Post Rack
Hardmounting the Server in a 19-Inch 2-Post Rack
Hardmount 19-Inch 2-Post Rack Kit

To Install a Server With a Hardmount in a 19-Inch 2-Post Rack
Mounting the Server With a Sliding Rail Mount in a 19-Inch 2-Post Rack

To Install a Server With a Sliding Rail Mount in a 19-Inch 2-Post Rack

To Connect the Service Processor Serial Management Port

To Connect the Service Processor Network Management Port

To Connect the Ethernet Network Cables

To Connect AC Power Cables to the Server
DC Operation Conditions and Procedures
DC Supply and Ground Conductor Requirements
Overcurrent Protection Requirements

To Assemble the DC Input Power Cable

To Install the Strain Relief Housings

To Secure the Server Cables in the CMA
Powering On the System for the First Time

To Power On the System for the First Time
Connecting to the ILOM Service Processor for the First Time
ILOM Service Processor Software Overview
Determining the ILOM Service Processor IP Address

To Access the BIOS and View the Service Processor IP Address

To Establish a Connection to the Service Processor Using a Serial Connection
Modifying the Service Processor IP Address

To Change the SP DHCP IP Address to a Static IP Address Using the Serial Connection

To Change the SP Static IP address to a DHCP IP Address Using the Serial Connection
Using the Service Processor ILOM Web Browser Interface

To Change a Static IP Address Using the SP ILOM Web Browser Interface
Applying Power for the First Time

To Turn on the Server for the First Time
Setting Up the Operating System Software
7. Configuring the Preinstalled Solaris 10 Operating System
Solaris Preinstallation Overview

To Configure the Preinstalled Solaris OS

(Optional) To Redirect the Console Output to the Video Port

To Set the Video Port as the Default Output
Mirroring the Preinstalled Solaris OS With LSI RAID

To Create a Mirror Image of the Solaris OS on HDD1
Creating a RAID Set to Incorporate a Preinstalled OS Using the Sun StorageTek Card

To Mirror Your Configured Solaris OS
Solaris 10 OS User Information
Accessing Solaris 10 User Documentation
Downloading Solaris 10 OS Software
Powering On and Off the Server

To Apply Main Power for All Server Components
Power Off From Main Power Mode
A. Updating the System Firmware
Copyright © 2010, Oracle and/or its affiliates. All rights reserved.