16 Approve Engineering Change Orders

This chapter contains these topics:

16.1 Approving Engineering Change Orders

After you have located an ECO for review, you must indicate your approval or rejection. The reviewer typically performs this task.

After the last person in the approval routing has approved the ECO, the system updates the status code with the value you specify in a processing option.

Approving engineering change orders consists of the following tasks:

  • Reviewing ECOs for Approval

  • Updating Bills of Material

16.1.1 Before You Begin

16.2 Reviewing ECOs for Approval

Navigation

From Manufacturing Systems (G3), choose Engineering Change Management

From Engineering Change Management (G3013), choose ECO Approval

To review an ECO for approval

On ECO Approval

Figure 16-1 ECO Approval screen

Description of Figure 16-1 follows
Description of "Figure 16-1 ECO Approval screen"

  1. Locate the ECOs that await your approval.

  2. Complete the following fields:

    • Approver Number (required)

    • Branch/Plant (required)

    • Status

  1. For each ECO, complete the following fields to indicate your approval or rejection:

    • Status (required)

    • Date Approved

    • Note

Field Explanation
Approver Number A number that identifies an entry in the Address Book system. Use this number to identify employees, applicants, participants, customers, suppliers, tenants, and any other Address Book members.
Status User defined code system 30, type ST, which indicates the approval status of an engineering change order.

For example:

A – Accept (initiates notification of next review group)

R – Reject (stops the notification process)

Date Approved The date on which an approval authority has approved or rejected an ECO. The default value is the current system date.
Note A 40-character generic description.

16.2.1 What You Should Know About

Topic Description
Protecting the approval field You can set a processing option to protect the approval field so that only the current user can change approval status.
Defining additional status codes You can define additional approval status codes on UDC 30/ST. Approval status code A is hard-coded and is the only value that initiates the notification of other review groups.
Entering text You can type text in the detail area to provide more information regarding your approval.
Rejecting an ECO To reject an ECO, use status code R. This stops the notification process. After a reviewer rejects an ECO, the creator of the ECO must redefine the ECO and restart the notification process.

16.2.2 Processing Options

See Section 19.12, "ECO Approval (P4818)."

16.3 Updating Bills of Material

Navigation

From Manufacturing Systems (G3), choose Engineering Change Management

From Engineering Change Management (G3013), choose Engineering Change

For ECOs with attached parts lists, you can process the ECO parts list and related items list to update the Bill of Material table with the requested changes.

The Engineering Change Population program performs the following:

  • Processes the ECOs

  • Updates the bills of material for the items on the ECO

  • Creates a report in proof or final mode that describes the requested changes

  • Updates ECO related information in the Branch/Plant table

  • Updates the Item Master table for item flash messages based on other outstanding ECOs

  • Validates the ECO for full approval before accepting the requested changes

  • Updates the effectivity dates

  • Updates the drawing revision level

  • Copies substitute items from the old component to the new component

  • Updates the parent/component revision level

Caution:

JD Edwards World recommends that you first run this program in proof mode. In proof mode, the report lists all requested changes without actually changing any files. Review the report and then run the program in final mode to update files. After you run this program and update the Bills of Material table, you cannot change the parts list and run the program again.

The Engineering Change Population program only updates the bill of material. You must update the routing to include the same item revision level as the bill of material if you want to synchronize them.

16.3.1 Before You Begin

  • Verify that the ECO has been approved by all reviewers

  • Verify that the ECO parts list contains the change type and relationship values you want. See Section 14.5, "Defining Changes."

  • Verify that the ECO related items list contains the items that you want to include in the change.

16.3.2 Example: Engineering Change Population Report

In proof mode, the report lists all requested changes without actually changing any files.

30510 JD Edwards World Page - 3 Bill of Material Population Date - 6/02/17 ECO Number . . . 8004 EN Description. . . XYZ N/C in Parent 333z Date Entered . . 07/28/13 Originator . . . 9200 Dobson, Jane Branch/Plant . . M30 Memphis Mfg. Plant Drawing Change . Y Status . . . . . E1 ECO Entered Type . . . . . B Marketing BOM Change . . . Y Reason . . . . . CC Customer Change Request Priority . . . . M Med Routing Change . Y Phase In . . . . IMD Immediate New Part Number. Y Existing Disp. . . . . . .Target Dates. . . . . . . .Actual Dates. . . . . . . . . . Category Codes . . . . . . . Design . . . . . 08/01/17 Design . . . . . . . Engineering. . . 09/01/17 Engineering. . . . . Incorporation. . 09/15/17 Incorporation. . . . Bill of Material Changes - F3002 -------------------------------- BEFORE CHANGE AFTER CHANGE ----------------------------------------------------------------- ----------------------------------------------------------------- Parent Item Batch BOM Parent Item Batch BOM Component Item Branch Typ Quantity UM Rev Component Item Branch Typ Quantity UM Rev -------------------------- ---------------------------- ------------ --- ------------ -- --- ---------------------------- ------------ --- ------------ -- --- 333Z M30 M A OAK SHELF UNIT XYZ M30 Comp. Rev. . NEW 1x10x6' OAK S4S Eff From 09/15/17 Qty Per 2 EA Comp.Seq 1.1 Eff Thru 12/31/20 Fixed/Variable V Op Seq. 10.00

16.3.3 What You Should Know About

Topic Description
Revision Level Control You can protect the item revision level that you set up in Plant Manufacturing Data with a processing option so that it is only updated by the Engineering Change Population program.
Drawing Information You can protect the item drawing information that you set up in Item Master Revisions with a processing option so that it is only updated by the Engineering Change Population program.