Index

A  B  C  D  E  F  G  I  L  M  N  O  P  Q  R  S  T  U  V  W 

A

A7.3
Engineering Change Orders
linking a work order to an ECO, 14.3.1
Locating ECO Information, 8.2
locating ECO information, 15.2
order-specific approval routings, 13.4
revision levels, overview, 12.3
updating component revision levels, 14.5.1
updating drawing revision levels, 14.5.1
updating revision levels, 16.3
About Work Centers, 5.5, 5.5.1
Approval audit
ECOs, 15.2
Approval routing master, 13.4
Approving ECOs, 16.1, 16.1

B

basic item information, 3.2
Bill comparison report, 8.7.7
Bill of material
printing, 8.7
Bills of Material
configurations, 5.3.3
features, 5.3.6
indented, 5.3.7.1, 5.3.7.2
modular, 5.3.1.2
overview, 5.3
relationships, 5.3.7
super, 5.3.1.1
verifying, 7.9
Bills of material
changing in groups, 7.8
comparing, 8.4
review, 8.1
reviewing, 8.3
updating, 16.3
Branch/plant information
assigning an item to a branch plant, 4.2
entering branch/plant information, 4.1
item locations
changing primary locations, 4.3
deleting primary locations, 4.3.1
effects on quantities, 4.3.1
form, 4.3
item manufacturing information
DRP/MPS/MRP, 4.4.1, 4.4.1
engineering, 4.4.1
form, 4.4.1, 4.4.1
overview, 4.1
working with item locations, 4.3
Branch/plant information form, 4.1.1

C

Change with a parts list
defining, 14.5
Changing
bills of material in groups, 7.8
Changing multiple bills of material, 7.8
Checking low level codes, 7.9
Classification Codes form
sample, 3.5
Classification Codes program (P41011), 3.5
Comparing bills of material, 8.4
Component locators
working with bills of material, 7.6
Component scrap
updating, 10.5
Components
working with bills of material, 7.3
Costing and accounting information
entering
work centers, 9.3
Cumulative
lead times, A.1.5

D

Default Units of Measure form
sample, 3.6
Default Units of Measure program (P41012), 3.6
Defining
change with a parts list, 14.5
details, 14.7
Defining the change with a parts list, 14.5
Defining the routing, 14.4
Details
defining, 14.7
Discrete manufacturing
setting up, 6
setting up manufacturing constants, 6.2
Discrete manufacturing overview, 5.2

E

ECO
changes, 12.2.5
definition, 12.2.1
existing disposition codes defined, 13.2
phase in codes defined, 13.2
priority codes defined, 13.2
process, 12.2.4
reason codes defined, 13.2
revision levels defined, 13.2
setting up, 13.1
status codes defined, 13.2
type codes defined, 13.2
ECO reviewers
assigning to groups, 13.4.2
setting up, 13.4
ECOs
approval audit, 15.2
approving, 16.1
entering, 14.3
open tasks, 15.2
printing open, 15.4.3
reviewing, 15.1
Engineering Change Management
objectives, 12.1
Engineering Change Population program, 16.3
Entering
ECOs, 14.3
outside operations, 10.3
Entering a work center, 9.2, 9.2
Entering Basic Item Information, 3.2
Entering costing and accounting information, 9.3
ERPx
overview, 1.3.1

F

Features
bills of material, 5.3.6
routings, 5.6.1
work centers, 5.5
Forms
Bill Comparison, 8.4
Classification Codes, 3.5
Default Units of Measure, 3.6
Item Alternative Description, 3.2.1
Item Branch/Plant Information, 4.1.1
Item Master Information, 3.1.1
Item Units of Measure, 3.6
Item/Location Information, 4.3
Manufacturing Values Entry, 3.7
Plant Manufacturing Data, 4.4.1, 4.4.1
Primary Location, 4.3
Text Messages, 3.3.1
Future bill inquiry form (P30210), 15.3

G

Generating
work with lead times, 11.3
Generating lead times, 11.3

I

Integrity Analysis Report, 7.9
Item Alternative Description form
sample, 3.2.1
Item Alternative Description program (P41016W), 3.2.1
Item Branch/Plant Information form
sample, 4.1.1
Item Branch/Plant Information program (P41026), 4.1.1
Item Master Information
entering item units of measure information, 3.6
Item Master information
assigning item responsibility, 3.4
classification codes
inventory, 3.5
purchasing, 3.5
sales, 3.5
warehouse, 3.5
deleting, 3.1.1
entering grade and potency information, 3.8
entering item classification codes, 3.5
entering item manufacturing information, 3.7
entering Item Master information, 3.1
entering item text
form, 3.3
form, 3.2
grade and potency information
for lots, 3.8.1
for sales, 3.8.1
item descriptions
form, 3.2.1
item identifiers, 3.2.1
item processing information, 3.2.1
item text
form, 3.3
manufacturing information
form, 3.7
requirements planning, 3.7
overview, 3.1
setting up a template, 3.1.1
units of measure information
conversions, 3.6
form, 3.6
Item Master Information form
sample, 3.1.1
Item Master Information program (P4101), 3.1.1
Item Units of Measure form
sample, 3.6
Item Units of Measure program (P41002), 3.6
Item/Location Information form
sample, 4.3
Item/Location Information program (P41024), 4.3

L

Lead times
cumulative, A.1.5
level, A.1.3
manufacturing, A.1.6
per unit, A.1.4
purchased parts, A.1.7
queue/move hours, A.1.1
setup hours, A.1.2
Level
lead times, A.1.3
Locating bills of material, 8.3
Locating ECO information, 8.2, 8.2, 15.2
Low level codes
updating, 7.9

M

Manufacturing
lead times, A.1.6
Manufacturing Values Entry form
sample, 3.7
Manufacturing Values Entry program (P41013), 3.7
Master Routings, 5.6.2
Menu flow, 1.4

N

Next numbers, 13.3
Notifying
reviewers, 14.8

O

Objectives, 5.1
Open tasks
ECOs, 15.2
Outside operations
entering, 10.3
Overview
ERPx, 1.3.1
routings, 10.1
work with ECOs, 14.1
Overviews
discrete manufacturing, 5.2
routings, 5.6
work centers, 5.6

P

Pending orders, 14.6
Per unit
lead times, A.1.4
Planning bill and kit information
working with bills of material, 7.4
Plant Manufacturing Data form
sample, 4.4.1, 4.4.1
Plant Manufacturing Data program (P41027), 4.4.1, 4.4.1
Primary Location form
sample, 4.3
Primary Location program (P41021W), 4.3
Printing
bill of material, 8.7
open ECOs, 15.4.3
Single/Multi-Level Bill Report, 8.7.1
Where Used Item Report, 8.7.5
Printing bill of material information, 8.7
Printing details
ECOs, 15.4.1
Printing ECO information, 15.4
Processing options
P30415, 8.7.3
Production information
working with bills of material, 7.5
Programs and IDs
P0016 (text messages), 3.3.1
P30420, 8.7.5
P30510, 16.3
P30520, 7.8
P30601, 7.9
P41002 (item units of measure), 3.6
P4101 (item master information), 3.1.1
P41011 (classification codes), 3.5
P41012 (default units of measure), 3.6
P41013 (manufacturing values entry), 3.7
P41016W (item alternative description), 3.2.1
P41021W (primary location), 4.3
P41024 (item/location information), 4.3
P41026 (item branch/plant information), 4.1.1
P41027 (plant manufacturing data), 4.4.1, 4.4.1
Purchase parts
lead times, A.1.7

Q

Queue/move hours
lead times, A.1.1

R

Reports
bill comparison, 8.7.7
Integrity Analysis, 7.9
single/multi-level bill, 8.7.1
where used item, 8.7.5
Review
bills of material, 8.1
Reviewers
notifying, 14.8
Reviewing
bills of material, 8.3
ECOs, 15.1
working with lead times, 11.2
Reviewing bills of material, 8.1
Reviewing ECOs, 15.1
Reviewing Future Bills of Material, 15.3
Reviewing lead times, 11.2
Reviewing operations
by work centers, 9.4
Reviewing operations by work center, 9.4
Reviewing routing information, 10.6
Reviewing trial balances by company, 7.2, 8.3, 9.2, 10, 10.2
Revision levels
locating ECO information, 8.2
Overview for ECOs, 12.3
Routing
defining, 14.4
overview, 10.1
reviewing information, 10.6
Routings
alternate operations, 5.6.4
features, 5.6.1
master, 5.6.2

S

Setting up
approval routing master, 13.4
ECO reviewers, 13.4
next numbers, 13.3
Setting up an approval routing, 13.4
Setting up discrete manufacturing, 6
Setting up engineering change orders, 13.1
Setting up next numbers for engineering change orders, 13.3
Setup hours
lead times, A.1.2
Single/Multi-Level Bill reports, 8.7.1

T

Text Messages form
sample, 3.3.1
Text Messages program (P0016), 3.3.1

U

Updating
bills of material, 16.3
component scrap, 10.5
Updating bills of material, 16.3
Updating component scrap, 10.5
User defined codes list
Work Day Calendar, 6.6.2

V

Verifying
bills of material, 7.9
Verifying bills of material, 7.9
Verifying existing, 14.2

W

What is an ECO?, 12.2.1
Where Used Item report, 8.7.5
Where Used Update, 7.8
Work Centers
overview, 5.5, 5.5.1
Work centers
costing and accounting information
entering, 9.3
entering, 9.2
features, 5.5
reviewing operations by work center, 9.4
working with, 9.1
Work day calendar
choosing a code, 6.6.2
Work with ECOs
overview, 14.1
Work with lead times, 11.1
generating, 11.3
reviewing, 11.2
Working with Bills of Material, 7
planning bill and kit information, 7.4
Working with Bills of material
components, 7.3
Working with bills of material, 7
component locators, 7.6
production information, 7.5
Working with component locators, 7.6
Working with components, 7.3
Working with ECOs, 14.1
Working with generic text, 7.7, 10.4
Working with lead times, 11.1
Working with planning bill and kit information, 7.4
Working with production information, 7.5
Working with routings, 10.1
Working with work centers, 9.1