Maintaining Component Lists

This chapter provides an overview of component lists and discusses how to maintain component list information.

Click to jump to parent topicUnderstanding Component Lists

When the system releases production to the shop floor, it creates a component list for the production quantity specified and associates it with the production ID or production schedule. With the creation of a component list, PeopleSoft Manufacturing provides you with the ability to alter the bill of material (BOM) to accommodate item substitutions or configuration changes. You can also associate attachments with each component on the component list.

Once you define a production area/item combination and create a production ID or production schedule for an item, you can verify and change the production requirements before or after releasing production to the shop floor.

You can create a component list by:

The component lists created differ depending on whether the component list is for regular, teardown, or rework production or for a configured item. For regular production, the system uses the end item's BOM to create the component list. For teardown production, the component list consists of the item that you are tearing down, which is automatically issued using the Kit issue method. For rework production, the system bases the component list on the rework BOM if there is one and automatically adds the reworked end item as a component and assigns it the kit issue method. If a rework BOM doesn't exist, the system creates a component list with only the reworked end item as a component.

For a configured item, the component list is created using the options and features selected during sales order entry. You can modify either component list by adding new components, deleting existing components, or changing the quantity per assembly or per order, scheduled quantity, or component yield. You can't specify configured items as a component on a component list for a non-configured end item. Configured items can have other configured items as components. You can't change the rework or teardown end item on the component list.

This section discusses how to:

Click to jump to top of pageClick to jump to parent topicCreating Component Lists for Regular Production

To create a component list for regular production, the system copies the item's BOM. The component list defines the required components for the production quantity. You define which BOM to use for production by selecting the appropriate revision of the BOM or using the BOM in effect at the time production is due.

Note. Components that are supplied by an outside vendor aren't included when creating the component list. These components are marked as subcontractor-supplied on the item's BOM.

Note. Floor stock and expensed items are included on the component list for informational purposes only. Although the system calculates and displays a scheduled quantity, these items aren't included in any pick plan and therefore won't be issued to production during the material release process.

When creating the component list, the system determines the scheduled quantities and current scheduled quantities for each of the end item's components. Scheduled quantity is based on this formula:

[(operation start quantity x quantity per assembly) / component yield]

The scheduled quantity is calculated based on the quantity of the end item started at the operation where the component is used. In addition, the system also initializes the components operation sequence and quantity per assembly or per order with information from the BOM. The components issue method defined for the end item within the production area is also defined at this time.

If you're adding a new component, the scheduled quantity is calculated the same as when a production ID is created (operation start qty * qty per assy)/component yield.

If you're changing the scheduled quantity, then the system calculates the quantity per assembly: QPA = (current component scheduled qty * component yield) /operation start qty. The operation start quantity factors in any planned yield loss or actual scrap that has occurred at prior operation sequences.

If you're changing the QPA, then the current scheduled quantity is recalculated using the operation start quantity at the operation sequence where the component is required.

See Also

Maintaining Bills of Material

Click to jump to top of pageClick to jump to parent topicCreating Component Lists for Rework Production

PeopleSoft Manufacturing creates the component list for rework production somewhat differently than for regular production. When the rework production ID is released, the system adds the end item being reworked to the component list, with a scheduled quantity the same as the production quantity. The system assigns the kit issue method to the end item being reworked. Additionally, if the end item being reworked has a rework BOM associated with the rework production ID, the system calculates the additional component requirements and adds them to the component list on the rework BOM. The system issues any additional components required for rework production using the issue method set for each item on the production area/item level. The issue method defaults from the Define Business Unit Item - Manufacturing page; you can override it on the Production Area - Item Detail page. The operation sequence of the reworked end item is automatically set to 0. The operation sequence of the additional components reflects the operation sequence specified on the rework BOM. If you haven't predefined a rework BOM, you can add other components to the component list as needed to repair or rework the end item.

Click to jump to top of pageClick to jump to parent topicCreating Component Lists for Teardown Production

PeopleSoft Manufacturing creates the component list for teardown production by copying the item that you are tearing down into the component list with a scheduled quantity the same as the order quantity. If additional material is needed to tear down the item, manually add those components to the component list. The issue method for the end item being torn down is automatically set to Kit. The system issues any additional components required for teardown production using the issue method set for each item at the Production Area/Item level. The issue method defaults from the Define Business Unit Item - Manufacturing page; you can override it on the Production Area - Item Detail page.

Click to jump to top of pageClick to jump to parent topicModifying the Component List

You can modify the component list after the release of the production ID—even if production is in process. If you have already consumed or issued components on the component list, you can't delete those components from the production ID. However, you can:

When you modify a component list and if you are integrating to a third-party Manufacturing Execution System (MES), PeopleSoft Manufacturing uses the Production Order Update Enterprise Integration Point (EIP) to publish a message to the MES with the transaction information. The MES then subscribes to that message and updates the MES information.

In addition, you can also view and edit a limited number of components associated with a production ID or production schedule. Select a subset of components by using various filters. Use this when you do not want to select all the components associated with the production ID or production schedule.

See Also

Integrating with Third-Party Systems

Manufacturing Execution System Integration

Click to jump to parent topicCommon Elements Used in This Chapter

Prdn ID (production ID)

The production order identifier.

Item ID

The name and description of the item being manufactured.

Config Code (configuration code)

A unique identifier for costing and inventory tracking purposes. The configuration code appears if the end item is a configured item.

Production Status

The current status of the production.

Production Area

The area where the item is being manufactured.

Prdn Type (production type)

The type of production being manufactured: Production, Rework, or Teardown.

Op Seq (operation sequence)

The operation step where the component is added.

Prdn Start Qty (production start quantity)

The starting quantity for the production ID or production schedule at the beginning of the manufacturing process.

Prdn End Qty (production end quantity)

The quantity expected for the production ID or production schedule at the end of the manufacturing process.

Expected Yield % (expected yield percentage)

The percentage that you expected for the production ID or production schedule at the end of the manufacturing process.

Component ID and Description

The name of the component being used in the selected production.

Source Cd (source code)

Valid source codes are Make, Buy, Expensed, or Floor Stock.

Click to jump to parent topicMaintaining Component List Information

This section discusses how to:

Click to jump to top of pageClick to jump to parent topicPages Used to Maintain Component List Information

Page Name

Definition Name

Navigation

Usage

Update Component List - Production Selection

SF_COMP_MAINT_SEL

Production Control, Define Production, Production IDs/Schedules, Update Component List, Production Selection

Select a specific production ID or production schedule to add, change, or delete components when the production status is Firmed, Released, or In Process.

Define at least one production ID or production schedule with a production status of Firmed, Released,or In Process.

Component List Selection

SF_SELECT_COMPS_SP

Click the Select Components link on the Update Component List - Production Selection page.

Select specific components to modify.

Update Component List - Summary: Summary

SF_COMP_MAINT_GRD

Production Control, Define Production, Production IDs/Schedules, Update Component List, Summary, Summary

Add, change, or delete components when the production ID or schedule status is Firmed, Released,or In Process.

Item Substitution

SF_COMP_MAINT_GRD_DET

Production Control, Define Production, Production IDs/Schedules, Update Component List, Summary, Summary

Click the Item Search button next to the Component ID.

Display or change substitute items selected by PeopleSoft Supply Planning, based on the criteria that you specify.

Update Component List - Production Text

SF_COMP_PRDN_TEXT

Production Control, Define Production, Production IDs/Schedules, Update Component List, Summary, Production Text

Display or modify text associated with production.

Update Component List - Detail: Detail

SF_COMP_MAINT2

Production Control, Define Production, Production IDs/Schedules, Update Component List, Detail, Detail

View additional information for a component.

Component Detail

SF_COMP_MAINT2_SP

Production Control, Define Production, Production IDs/Schedules, Update Component List, Detail, Detail

Click the Detail button.

View component detail activity at a summary level.

Update Component List - Detail: Component Text

SF_COMP_TEXT

Production Control, Define Production, Production IDs/Schedules, Update Component List, Detail, Component Text

Associate or modify text with any component on a component list. For regular production, any component text from the BOM is copied, along with the component at the time the component list is created.

Update Component List - Detail: Documents

SF_COMP_DC

Production Control, Define Production, Production IDs/Schedules, Update Component List, Detail, Documents

Associate, access, and manage pertinent component documents in the embedded document management system.

You must have PeopleSoft Engineering installed to access this page.

Update Component List - Detail: Documents Details

DC_DOC_DETAILS_SP

Production Control, Define Production, Production IDs/Schedules, Update Component List, Detail, Documents

Click the Detail button for the selected document.

View additional information about the selected document from the document vault.

You must have PeopleSoft Engineering installed to access this page.

Update Component List - Detail: Attachments

SF_COMP_ATT

Production Control, Define Production, Production IDs/Schedules, Update Component List, Detail, Attachments

Associate attachments with the components. Any component attachments from the BOM, and not associated with phantom items, are copied along with the components at the time that the component list is created.

Component List - Production Selection inquiry

SF_COMP_SELECTION

Production Control, Define Production, Review Production Information, Component List, Production Selection

Select the production ID or production schedule information to view a component list.

Component List - Summary: Summary inquiry

SF_COMP_LIST_GRD

Production Control, Define Production, Review Production Information, Component List, Summary, Summary

View a summary of the component list.

Component List - Summary - Production Text inquiry

SF_COMP_LIST_PRTXT

Production Control, Define Production, Review Production Information, Component List, Summary, Production Text

Display text associated with the production.

Component List - Detail: Detail inquiry

SF_COMP_LIST2

Production Control, Define Production, Review Production Information, Component List, Detail, Detail

Display detail for a specific component.

Component List - Detail: Component Text inquiry

SF_COMP_LIST_TXT

Production Control, Define Production, Review Production Information, Component List, Detail, Component Text

Display text for a component.

Component List - Detail: Documents inquiry

SF_COMP_LIST_DC

Production Control, Define Production, Review Production Information, Component List, Detail, Documents

Display component documents for each component.

You must have PeopleSoft Engineering installed to access this page.

Component List - Detail: Attachments inquiry

SF_COMP_LIST_ATT

Production Control, Define Production, Review Production Information, Component List, Detail, Attachments

Display component attachments for each component.

Comp Where Used Selection (components where used selection)

SF_COMPWUSE_INQ

Production Control, Define Production, Review Production Information, Component Where Used in Prdn

Select the components that you want to view.

Component Where Used List

SF_COMPWUSE_GRD

Production Control, Define Production, Review Production Information, Component Where Used in Prdn, Component Where Used List

View where components are used in production.

Click the View Related Links button to access other pages to view additional component information, such production details, item substitution, and operation details.

Component Selection report page

RUN_SFS2006

Production Control, Define Production, Reports, Component Where Used Report, Component Selection

Select the components for the Component Where Used in Production report.

See Also

SFS2006 - Component Where Used in Production Report

Click to jump to top of pageClick to jump to parent topicDefining Component Selection Criteria

Access the Update Component List - Production Selection page (Production Control, Define Production, Production IDs/Schedules, Update Component List, Production Selection).

Production ID

Select to view or maintain the component list for a specific production ID.

Production Area and Item

Enter values in both fields to view or maintain the component list for production schedules. The production schedule information is based on the start date of production or when production is due to be completed.

Select Components

Click this link to access the Component List Selection page, where you can retrieve specific components.

Date Type

Prdn Start (production start) and Prdn Start Date (production start date)

Select Prdn Start to view the production schedules that are or were due to begin on a specific production start date. Select the production start date for the production schedule. Scroll through the list until you find the specific production schedule that you'd like to view.

Prdn Due (production due) and Prdn Due Date (production due date)

Select Prdn Due to view production schedules based on production due dates. Scroll through the list until you find the specific production schedule that you'd like to view. Select the production due date for the production schedule.

Prdn Due Shift (production due shift) or Prdn Start Shift (production start shift)

Select a valid shift for the production schedule based on either when the shift ends or when the shift begins.

Note. If multiple production schedules exist for the production area/item/date/shift, then a warning appears followed by a listing of the production schedules from which you can select one production schedule to maintain.

Search

Click the Search button to retrieve the information associated with the production ID or production schedule.

Click to jump to top of pageClick to jump to parent topicSelecting Specific Components

Access the Component List Selection page (Click the Select Components link on the Update Component List - Production Selection page).

Op Sequence Range

All Op Sequences (all operation sequences)

Select this option if you do not want to filter by operation sequence.

Range

Enter a range of operation sequences.

Component Range

Select one of these options:

Note. You can use both the Op Sequence Range and Component Range options to further filter the selection criteria.

Click OK to retrieve the selected components and access the Summary page.

Click Cancel to return to the Production Selection page.

Click to jump to top of pageClick to jump to parent topicMaintaining the Component List Summary

Access the Update Component List - Summary: Summary page (Production Control, Define Production, Production IDs/Schedules, Update Component List, Summary, Summary).

Print at Save

Select this check box if you want to print production documents at save time.

Setup Print Options

Click this link to access the Process/Output Options page to select different print criteria for the production documents.

Component Summary

Component ID

Select the component being added.

Item Search

Click to search for the item ID using various search criteria.

Op Seq (operation sequence)

Determines where in the manufacturing process that you need the components. PeopleSoft Manufacturing uses the work center associated with each operation, and the WIP location associated with each work center to determine where to deliver components. The component's issue method in combination with the operation sequence determines when and where the material is delivered and how the system updates inventory in the WIP location or the issue quantity on the component list.

When the operation sequence is set to zero or an invalid operation sequence is specified, it is assumed that the component item will be used at the first operation. In this case, PeopleSoft Supply Planning uses the recorded completions and scrap at the first operation to calculate the correct kit component quantity on hand.

Quantity

Enter the number of components required based on per assembly or per order.

Per

Displays the component requirements in amounts per Asy (assembly) with a unit of 1, or per Ord (order), an amount regardless of the order size.

Yield

Displays the expected percentage of usable components within a batch of components issued to production. You can change the component yield here. If you change the yield, the system recalculates the schedule quantity for the component relating to this production only.

Sched Qty (schedule quantity)

Enter the number of components required for the batch production.

To calculate the scheduled quantity with a known quantity per assembly:

Scheduled Quantity = operation start quantity * [Quantity Per Assembly / (Component Yield / 100)]

Quantity Per Calculations

You can calculate the quantity per assembly or per order.

Important! To provide greater accuracy when modifying component data, we don't require the Quantity field to follow the quantity precision rules defined for the item. A warning is issued if you define a decimal quantity value for an item whose quantity precision value is a whole number.

Scheduled Quantity Calculations

You can calculate the scheduled quantity per assembly or per order.

Note. The format for the Scheduled Quantity on this page may be determined by the item's unit of measure and quantity precision combination that was defined in PeopleSoft Inventory.

Other tab

Op Seq (operation sequence)

Enter the operation step where the component is to be added.

Qty on Hand (quantity on hand)

The system displays the total, available quantity on hand for the component.

Issue Method

When you set the component issue method to Issue, material is delivered to the work center WIP location. When you record end item completions for the operation, the components associated with that operation sequence are consumed from the work center's WIP location. At that point, the system decrements the quantity on hand in the WIP location and updates the issue quantity on the component list.

Components using the Replenishment method are handled in a manner similar to those using the Issue method. Material is delivered to the WIP location using the production replenishment pages as a result of a worklist notification.

When you record end item completions, the components associated with that operation sequence are consumed from the work center's WIP location. At that point, the system decrements the quantity on hand in the WIP location and updates the issue quantity on the component list.

If you are using PeopleSoft Flow Production, you can also replenish the WIP locations directly from an inventory location, feeder line, or vendor using Kanban Cards or online replenishment requests.

When you use the Kit component issue method, the operation sequence is only a reference for the material handler. Kitted material is delivered to the work center tied to the operation sequence, but the system charges the material directly to the production ID upon issue. The material isn't issued to the work center's WIP location, nor consumed when the operation is completed. The system updates the issue quantity on the component list when the material is released to production.

When you add a new component to the component list, the operation sequence defaults to zero. A component with an operation sequence of zero means that the component will be used at the first operation. If an invalid operation sequence has been specified on the end item's BOM, the system assumes that it will be used at the first operation.

For the phantom item's components, the system assigns the phantom's operation sequence to all of its components.

If an invalid operation sequence has been specified on the end item's BOM, or the operation sequence is set to zero, the system issues the components to the production area's WIP location. Owned components are issued only to owned WIP locations. Likewise, non-owned components are issued only to non-owned WIP locations.

Serial Control

The Serial Controlcheck box is a display-only field that indicates if the component is serial-controlled.

Teardown

The Teardown check box designates the component as a potential teardown output. This value is copied from the BOM Component Detail page. If a production ID is selected as the basis for a teardown order, the components designated as teardown are considered the outputs from the teardown production.

Substitute

The Substitute check box designates that a substitution has already taken place. This value is copied from the Component List Substitution detail page.

MES and Component Lists

When you modify a component list, if you are integrating to a third-party MES, PeopleSoft Manufacturing uses the Production Order Update EIP to publish a message to the MES with the transaction information. The MES then subscribes to that message and updates the MES information.

See Also

SFS2003 - Production Documents

Maintaining Production Orders and Production Schedules

Managing Inventory by Item Status

Understanding the Flow Production Process

Click to jump to top of pageClick to jump to parent topicMaking Item Substitutions

Access the Item Substitution page (Production Control, Define Production, Production IDs/Schedules, Update Component List, Summary, Summary. Click the Item Search button next to the Component ID).

Substitute Items

Displays the original component and a list of valid substitutes for the original component. PeopleSoft Supply Planning selects the component based on the criteria that you selected.

Sel (select)

Select this check box to manually override the Supply Planning component selection.

OK

Click to return to the component list Summary page where the substitution selection appears.

Substitute

Indicates if the component is a substitute.

Orig Comp ID (original component ID) and Description

The values are display only. A difference between the component ID and original component ID indicates that a substitution has taken place.

Click to jump to top of pageClick to jump to parent topicMaintaining Component Detail

Access the Update Component List - Detail: Detail page (Production Control, Define Production, Production IDs/Schedules, Update Component List, Detail, Detail).

Component Details

Summarizes the activity of the component for the production ID or production schedule.

Orig Comp ID (original component ID)

Displays the original component ID, if this component is a substitute, as well as the issue method for the component. There are several component issue methods: Production Issue, Production Kit, and Production Replenishment.

Source Cd (source code)

Values are Make, Buy, Expenses,or Floor Stock.

Sched Qty (current scheduled quantity) and Yield

Fields are display only, but you can change this information.

Quantity

Displays the calculated quantity per assembly or per order. The system calculates the quantity per by dividing the quantity per assembly by the BOM's BOM quantity. You designate the level of precision for the calculated quantity per in the manufacturing installation options page.

Config Code (configuration code)

Displays a code if the item is configured. If you add a configured item to the component list, you must add the configuration code here.

Note. For serial-controlled items, values in the Quantity Per and Scheduled Quantity fields must be whole numbers.

Non-Owned Item

Indicates that the component is supplied by the customer or is a consigned item. Approved consigned items can be added to component lists.

Teardown

Designates the component as a potential teardown output. This value is copied from the BOM Component Detail page.

See Also

Working With Configuration Codes

Managing Consigned Purchases Inventory

Click to jump to top of pageClick to jump to parent topicViewing Component Status Information

Access the Component Details page (On the Update Component List - Detail: Detail page, select the Detail icon.)

Pending Issue Qty (pending issue quantity)

Displays the quantity used based on the quantity completed at the operation multiplied by the quantity per assembly. If the component's quantity is expressed as per order, this is the per order quantity. The per order quantity is completely consumed at the first backflush. This quantity hasn't yet been consumed from the WIP location due to material shortages.

Yield Loss Qty (yield loss quantity)

Displays the quantity that was scrapped during the end item process and consumed from the WIP location.

Issue Qty (issue quantity)

For components using the Issue or Replenishment material issue method, this is the quantity that was consumed from the WIP location for the component and that was charged to work in process. For components using the Kit method, this is the quantity issued directly to the production ID.

Pending Yield Loss Qty (pending yield loss quantity)

Displays the quantity of components that was scrapped during the end item process but that has not yet been consumed from the WIP location due to material shortages.

Pending Pick Quantity

Displays the quantity that is awaiting issue to the WIP location or to the production ID to satisfy the scheduled component requirement. The pick plan has already been generated for these components but they haven't yet been reviewed and released to production.

Click to jump to top of pageClick to jump to parent topicAssociating Component Documents

Access the Update Component List - Detail: Documents page (Production Control, Define Production, Production IDs/Schedules, Update Component List, Detail, Documents).

Note. You must have PeopleSoft Engineering installed before you can access this page.

Using the Documentum Component Options page, you control the document management buttons that appear on this page.

Component Details and Documents

The system displays all the documents associated with this component list, including the document name and title, and whether the document is fixed or not. When you fix an associated document to a page, a specific version of the document is "permanently" associated with the page.

Click to view document detail.

Click to query the Documentum database.

Click to view document contents.

Click to launch Documentum.

Click to edit documents in the Documentum database.

Click the Checkout button to check out documents from the vault. Click the Checkin button to check in documents from the vault. Click the Cancel the Checkout/Checkin button to cancel these operations.

Click the Fix/Unfix Versions to change versions.

Click to copy links.

See Also

Managing Documents

Click to jump to top of pageClick to jump to parent topicSpecifying Component Attachments

Access the Update Component List - Detail: Attachments page (Production Control, Define Production, Production IDs/Schedules, Update Component List, Detail, Attachments).

Component ID and Op Seq (component ID and operation sequence)

Enter values that you want to associate with the component.

File Ext (file extension)

Select the type of media that you want to attach to the component.

Document and Description

Specify the file name and description of the item.

Click the Attachments button to launch the multimedia object attached to the component.

Click to jump to top of pageClick to jump to parent topicDeleting Components from the Component List

When deleting components, the system checks to see if material was issued to the location associated with the component's operation sequence, if material was consumed during a backflush or if material was issued using a production kit. A warning message appears if material was issued to the location. If material was consumed during a backflush, issued directly to the production ID, or an inventory picking plan has already been created for the component, the system won't allow you to delete the component. To delete the component, reverse the backflush, unconsume or debit the component, and then delete it.