This chapter provides an overview of line item activities and discusses how to:
Work with line item activities.
Work with methods.
Check bottom-up budgets against top-down plans.
Make adjustments.
Use Spreadsheet Add-In functionality.
Import line items.
Submit a line item activity.
In Planning and Budgeting, preparers or casual preparers are budget users at the lowest-level planning center defined for the planning model. Budget preparers are responsible for preparing, modifying, and submitting a detailed, line item budget for their respective planning centers. If applicable, they also prepare, modify, and submit position and asset budgets.
Preparers start with a base budget that the budget coordinator develops. A coordinator usually works in the central budget office. The base budget may be populated with proposed budget data (based on prior year actuals, prior year budget figures, or some other basis). Alternatively, the base budget may be blank for zero-based budgeting. In that case, you must build the budget plan from the ground up.
In Planning and Budgeting, you work with line item activities in data slices based on the planning center definition. This increases the efficiency of the system and lets other budget users access other data slices of the planning model at the same time. When you work with a data slice, you're doing so for a specific planning center for a specific activity and scenario combination. (Remember that you can define multiple line item activities, and also define whether individual line item activities do or do not include data from associated assets and position budgeting activities.)
The sum of the line items for every planning center in the business unit comprises the organization's entire budget. Line item budgets include personnel, capital, non-personnel expenditures and revenue estimates for a defined period of time, and related position and asset data. If you use position budgeting, the system uses the data entered in position budgeting to calculate the personnel line items for salary, earnings, benefits, and employer-paid taxes. If you use asset budgeting, the system uses the data that you enter in asset budgeting to calculate asset and depreciation expenses.
See Also
Understanding Planning and Budgeting Activities
Adjustment Amount |
Displays the net total of adjustments (percentage or fixed amount changes) applied to a line item. Note. An override column exists at the coordinator setup level, and the coordinator can disable the adjustment column. Prohibiting overrides in the adjustment column prevents manual entry of values to modify budget amounts. It also prevents mass adjustments from being applied to the item. |
Allocation Amount |
Displays the net total of allocations (distributions to and from planning centers) applied to a line item. The system displays an allocation applied to a planning center as a positive amount. The system displays an allocation applied from another planning center as a negative amount. |
Base Budget |
Displays the starting budget amount. A coordinator establishes this budget amount, which cannot be modified. The base budget is budget version 0 for each planning center level. |
Line Item Properties |
The information in the Line Item Properties group box identifies the business unit, model, activity, scenario, planning center, and version on which you are working. The defaults are based on the selected planning center version you selected from My Planning Workspace for a given model, activity, and scenario. |
Dimensions and Members |
The information in the Dimensions and Members group box identifies the dimensions used in the line item activity in which you are working. You can select how to display these dimensions, such as using codes, descriptions, or both. Additionally, you can use the group box to filter on members you wish to work with in the line item grid. |
Current Year Budget |
Displays the budget plan approved for the current fiscal year. |
Current Year Forecast and Current Year Estimate |
Displays the calculated projection for the current fiscal year. A forecast usually contains year-to-date actuals and current-year remaining budget amounts. |
Driver |
Displays the factor used in a method's algorithm. For example, in the ECODRV (economic driver on history) method, the driver can be the inflation rate. |
Historical Values |
Displays prior year actuals, year-to-date actuals, current year budget, and current year forecast. This data is associated with the analysis base definition for the planning model. A coordinator defines the values. You can compare your line item budget amount to the current and historical data. |
Method Amount |
Displays the budget amount resulting from the application of a method on a line item budget but before the system applies any adjustments or allocations. For methods involving a calculation, the system performs the calculation by applying the method and method details, if applicable, to a line item budget. For methods that do not require a calculation, the method amount is defined by the method definition that you select. For example, if you select BASBUD (base budget) as the method, the method amount is equal to the base budget amount. The method amount can represent the method amount for a single line item or the total method amounts for a group of line item budgets. |
Method Base |
Displays the value to which a method is applied. A coordinator can initially assign a base for a method to a line item budget. For example, if you want the system to calculate the line item budget for travel expenses by applying an inflation factor to the prior year actual expenditure for travel, the method base is the prior year actual expenditure figure. |
Method Default, Default Method, and Default |
Displays the method initially assigned to the line item budget at the coordinator level. |
Prior Year Actuals |
Displays actual expenditures or revenues received for the last full year. |
Spread Amount |
Displays the adjustment amount to apply to the line item. |
Spread Type |
Select to determine how the system applies the spread amount. Values are: Apply to All: The system populates each budget period with the amount that you enter. Spread Evenly: The system distributes the spread amount equally across the budget periods for the line item. Weighted Method: The system adjusts the amount on a proportional basis against the method total that appears when performing the spread. Weighted Total: The system adjusts the amount on a proportional basis against the current total amount that appears when performing the spread. Note. For the two methods using percentage calculations—ANN% (annual growth percentage on history) and ECODRV—there are two spread type choices: Spread Weighted and Spread Evenly. |
Total or Total Amount |
Displays the current budget amount for a line item. It is the sum of the method amount, adjustment amount, and allocation amount. The information includes the method amount, adjustment amount, allocation amount, total, prior year actuals, year-to-date actuals, current budget, and forecast for the line item. The total amount can represent the total budget for a single line item or the total budget for group of selected line item budgets. |
Year-to-Date Actuals |
Displays actual expenditures or revenues received from the beginning of the fiscal year to the present. |
Planning and Budgeting supports integration with Financial Management and third-party financial applications. The dimensions that you work with in line item activities must be:
Selected for use in Planning and Budgeting and activated.
Available in the financial application with which you integrate Planning and Budgeting.
Included as dimensions in the planning model.
The dimensions that are defined as dimensions in the planning model appear in line item activity.
Dimensions Configured for Planning and Budgeting
Use the Dimension Configuration page to select the dimensions that you want to make available in Planning and Budgeting. Select dimensions independent of the data sources with which you integrate Planning and Budgeting. However, if you select a dimension that an integration source does not support, you should evaluate the use of the dimension in the planning model in conjunction to your requirement in sending data back to the source system.
Dimensions Available by Financial Integration Source
Define the financial integration source using the Budget Installation Options page.
Note. As you can define multiple line item activities, you
can define activities that do transfer data back to your financial management
application, and other activities that do not transfer data back to your financial
management application. For the line item activities that do not transfer
data, you can specify any dimension, and you select dimensions at the planning
model level.
In cases when you define activities that use non-general ledger ChartField
dimensions, first associate these activities to the planning model, then restrict
the activities that transfer data back to the general ledger to contain ChartField
dimensions recognized by your financial application.
See Defining the History (Analysis Base).
See Defining Activities.
Changing Dimension Combinations in Line Item Activity
When changing dimension combinations for a row in line item activity as a preparer, the system retains the associated method details as defined by the original dimension combinations. The following conditions apply:
When changing the dimension combination for a row in line item activity, a message indicates that the related method details will be retained when you save changes.
Click OK to proceed or click Cancel. Exceptions to this include:
If the default method defined in the planning model does not allow override of the method, it changes to the new method and the system does not retain any of the original values.
If the original method is the same as the new method for the dimension combination, the system checks for other override controls such as driver, base, and driver parameter. If an override is not allowed on any of these, the system does not retain the method details. Click OK to proceed or click Cancel.
When a row is assigned as either the source or the target of the RELATE method, the system does not allow dimension changes.
Any adjustments originally made on the line item row are also retained when you make and save the dimension changes.
In this case, the system ignores the adjustment flag option on the Method Default page in the planning model for the line item activity.
Changes to the dimension combination are not allowed after you apply mass adjustments or allocations.
You must reverse mass adjustments or allocations before changing the dimension combination in the line item budget row.
For methods that are calculated based on an historical value, even though the system retains the method details, the method amounts are different if the history amounts for the modified line are different from the history amounts for the original line. If history data does not exist for the modified line, the history and method amounts are zero.
When enforcing valid ChartField (dimension) combinations during planning and budgeting in your line item activity, an online check will be performed when adding any new ChartField combinations. You will not be able to save an invalid combination when the enforce budget is enabled for the line item activity and scenario. The budget coordinator uses the Activity Scenario page in the planning model to turn on enforcement of valid ChartField combinations for a line item activity. The staging process performs this validation check, and will mark an invalid rows in error with the red x symbol instead of a green check-mark when the row is in error and needs to be corrected. If you fail to correct this error online, the system will prevent you from submitting your budget, and does not allow submission if there are invalid combination rows.
Note. The use of the enforce budget flag for combination edits and commitment control rules is only valid for a line item activity, since a ledger is associated with type of data. Any data inserted into the line item from invalid combinations entered in position and asset budgeting activities will need to be corrected in the activity the combination is coming from.
When using single sign on options to the PeopleSoft Financial Management system, you can access the Combination Edit and Commitment Control Setup Inquiry page that has available links directly to PeopleSoft General Ledger. The links on this page are useful when troubleshooting to determine valid ChartField combinations. Once you know the Process Groups used for validation, you can click Review Budgets Combo Data to display a list of all valid combinations for each Process Group. For further analysis, the combination setup pages are also available.
Note. Refer to the Ledger for a Unit page regarding validation. The system requires the process group you define on this page as the rules are driven (or keyed) by process group.
See Setting Up Single Sign On.
This section provides an overview of line item amounts and methods and discusses how to:
Maintain line item data entry details.
Add a new line item entry.
Review planning targets.
Manage user views.
Enter row display filter information.
Enter row display option information.
Enter column display option information.
Fix combination errors and change dimension members.
Add notes to line item activities.
View line item activities by budget period and adjust line amounts.
See Also
Working with Planning and Budgeting Activities
Primarily using the Line Items Detail page, you can enter fixed budget amounts into line items directly or have the system calculate budget amounts by assigning each line item a method. To manually enter a budget amount for a line item, use hot key functions to quickly enter data, enter amounts directly into each budget period, or assign the AMTPER (amount per budget period) method, and then enter a fixed budget amount by budget period.
Apply the rules-based methodology using the appropriate method types when possible. If you use methods to calculate budget amounts, select from a set of delivered methods. Override the methods and method details assigned to line items in the base budget if the coordinator enables override capability using the Assign Planning Method Defaults: Override Control page.
Enter characters in the Hot Keys column to help you quickly enter budget data across periods.
To indicate increases, perform line item budgeting using positive values. To indicate decreases in expenditures or revenues, use negative values.
Page Name |
Definition Name |
Navigation |
Usage |
BP_LI_GRID |
Click the Edit link on the My Planning Workspace page. |
View, add, and modify budget amounts using methods; manually enter budget amounts for a line item; add notes; and protect a line item budget from mass adjustments. |
|
BP_LINE_ITEM_ADD |
Select Add Entry from the Action dropdown list box on the Line Item Details page, and then click Go. |
Add one or more new line item budget entries and specify the ChartFields for the entry. |
|
BP_TGT_REVIEW |
Select Planning Target, from the Action dropdown list box on the Line Item Details page, and then click Go. |
View the tolerances rules, status summary, planning target details, and errors for the budgeting version that you selected. The page is only available if the coordinator defined planning targets for planning model. |
|
BP_HOTKEYS_TEXT |
Click the Hot Keys Help link on the Line Item Details page. |
Access a help page that lists hot key codes. |
|
BP_USRVIEW_DEFN1 |
Click the Create link in the User View group box on the Line Item Details page. |
Add a new private view. |
|
BP_USRVIEW_MAINT |
Planning and Budgeting, My Profile, User View Maintenance. |
Modify or update private view preferences. |
|
BP_USRVIEW_DEFN2 |
Select the Row Display Filter tab on the User View Details page. |
Specify the dimensions that the system displays, and the dimensions' display options. |
|
BP_USRVIEW_DEFN3 |
Select the Row Display Options tab on the User View Details page. |
Specify detailed row display options, such as amount types and currency and statistics options. |
|
BP_USRVIEW_DEFN4 |
Select the Column Display Options tab on the User View Details page. |
Specify column display options, such as budget period information by summary or in detail, and analysis base display options. |
|
BP_LINE_ITEM_MOD |
Click the Modify Dimensions button on the Line Item Details page. |
Change dimension values for an existing line item. |
|
BP_LINE_ITEM_MOD |
Click Review Error on the Line Item Details page. |
View and correct errors resulting from the ChartField validation process. |
|
BP_LINE_NOTES |
Click the Notesicon on the Line Item Details page. |
Enter or review notes and attachments for a line item. |
|
BP_LINE_ADJ_DTL |
Click the Adjustment Details link on a budget method details page. |
View a list of all adjustments for a line item budget. |
See Also
Access the Line Item Details page (Planning and Budgeting, Activity Preparation, My Planning Workspace then click the Edit link).
Add and edit line item budgets. If you use additional line item activities, the system can derive line item data (LINEITEM) from other line item activities associated with the same scenario. If you use the position or asset budgeting activities, the system derives these line item budgets from detailed position or asset budgeting data. If you have the necessary permissions for these activities, access the position and asset budgeting activities by clicking the total amount for the POSBUD or ASSET method total.
If you have only partial access to the planning center version, then the Analysis dropdown and its Go button are hidden, the Action dropdown excludes Planning Targets, and the User View dropdown excludes all user views that display a tree.
See Reporting and Analyzing Results.
Dimensions and Members
The Dimensions and Members collapsible group box lets you set up filters to control the amount of data that appears on the Amount Summary page. The values on the Dimension and Filter Dimension Members tabs come from the line item selection criteria that you define using the Row Display Filter page when using User Views. In fact, this group box has the same functionality as that used when defining user views, on the Row Display Filter page.
See Entering Row Display Filter Information.
See Entering Row Display Option Information.
Show Code |
Select to enable the dimension's code to display. |
Show Description |
Select to enable the dimension's description to display. |
Refresh Dimensions |
Click to refresh the page with dimension information. |
Action Menu
The options that appear in the Action Menu collapsible group box depend on the view definition that you set up using the Select Line Items Budgets page.
Action |
Select the desired action, and then click Go. Values are: Add Entry: Access the Add Line Item page to add one or more new line item budget entries and specify the ChartFields for the entry. See Adding a New Line Item Entry. Planning Target: Access the Planning Targets page to view the tolerances rules, status summary, planning target details, and errors for the budgeting version that you selected. |
Analysis |
Select the type of analysis that you want, and then click Go. Values are: Variance Analysis: Access the Variance Analysis page and compare scenarios, versions, or time periods (and combinations of these items) by amount or percentage variance. Version Analysis: Access the Version Analysis page and compare planning center budget versions. |
Hot Keys Help |
Click this link to access a help page that lists the hot key codes. |
User View
Private |
Select to display the current private view definition. |
Public |
Select to display the current public view definition. |
View |
Select the desired private or public view, and then click Refresh. |
Refresh |
Click to update the grid with the selected private or public view. |
Edit |
Click this link to access the page and modify the selected private view. Note. This link is available only when you select Private. |
View |
Click this link to access the page and display the selected public view. Note. This link is available only when you select Public. |
Create |
Click this link to access the User View Details page and add a new private view. Note. This link is available only when you select Private. |
Line Item Grid
The budget data for each line item appears on this grid. If the system displays 0 rows, you need to go back to the Dimensions tab and check the Show Statistics Code box, and go to the Filter Dimension Members tab and define the Account Category and From and To range; you can access the Dimensions tab and the Filter Dimension Members tab from either one of two places: on the Line Item Details page, or on the Row Display Filter page.
Note. If you click a link or button that opens another page, the system saves your data before you access the new page.
Note. You can also use the individual method details pages associated with a line item budget to work with line item details, including adjustments.
View All |
Click to view all line items in the data slice. The system displays this button only when there are more than fifty (50) rows to display. |
Hold All |
Click to select all Hold check boxes and exclude all line items from mass adjustments. |
Unhold All |
Displays if you select the Hold All option. Click to clear all Hold check boxes and include all line items in mass adjustments. |
Find |
Click Find to search the grid. |
Fiscal Year/Page |
Field displays when there are more than 20 periods in the budget data. Use the dropdown list to specify the period columns in which you want to display the data—select Fiscal Year for multiyear budgets, or Page for non-fiscal year data. |
Account, Operating Unit, Department, and Currency and others |
System displays the related information for each line item row. |
Stat |
Displays the statistical code associated with this line item. |
Default |
Displays the calculation method assigned to each line item by the coordinator (such as BASBUD or POSBUD). |
Method ID |
Select to access the associated method page. If the method is ASSET and you click the Amount link for the method row, the system displays the Asset Overview page and checks out the asset budgeting activity for the budget version. If the method is POSBUD and you click the Amount link for the method row, the system displays the Position Overview page and checks out the position budgeting activity for the budget version. If you apply a formula (FLEX method) in a planning center, whose results directly impact another planning center, you must copy the version (that uses that formula) to the master version of that planning center (on the My Planning Workspace page). When formula sources for a planning center come from another planning center or a different line item activity, that source planning center needs to copy to master since master is the source for formulas across slices of data. See Defining a Flexible Formula Source.
Note. If you do not have access to either position or asset
budgeting, the Amount link accesses the detailed
method page instead of checking out an activity. |
Enter the hot key character for the type of distribution that you want to perform, enter the amount or percentage, and then click Save. For example, enter R100 to enter 100 in all periods. Enter R100,1:3 to enter 100 in periods 1 through 3 only. R (repeat): Repeats across all cells to the right of the input. S (spread evenly): Spreads a value evenly across all cells to the right of the input. P (pro-rata spread): Spreads a value across all cells to the right of the input using the same percent-to-total relationship of existing data. I (increased percentage): Increases all cells to the right of the input by the percentage specified. D (decreased percentage): Decreases all cells to the right of the input by the percentage specified. |
|
Total Amount |
Click to access the detailed method page associated with the line item and review the method parameters. The budget amounts that appear are the line item totals for the budget cycle defined in the planning model. If you define the planning model with four budget periods that compose one budget cycle, the values include the sum of all four budget period amounts. They are not broken down by budget period. Note. If you work with the base version or a copy of the base version and select this link, the Base Budget page displays the method details associated with the line item. |
or |
Click the Notes icon button to access the Line Item Notes page where you can enter or view comments and justifications for a line item budget, and append them to the notes log, and attach or view relevant files. See Reviewing or Adding Notes and Attachments to Line Item Activities. |
Period Columns |
Individual columns displaying amounts for each budget period, for example monthly or quarterly. |
Total Amount |
Duplicates the Total Amount column (described above) that precedes the Period Columns. It is the line item budget periods total. |
Hold |
Select to exclude the line item from mass adjustments. |
Starting Balance |
System displays the starting balance only for those accounts marked as balance forward when the activity is defined as including Balance Sheet Planning. |
Totals
Totals |
Displays summary information about the line item budgets displayed in the grid. These totals in the bottom grid represent a total by currency code of the rows displayed in the grid based on view options or defined filters. Note. The system uses the value of the Analysis Calculation field (Add or Deduct) on the Account Type details page to determine if amounts are added or deducted. |
See Also
Access the Add Line Item page (select Add Entry from the Action dropdown list box on the Line Item Details page, and then click Go).
Note. If you have enabled the Enforce Budget option for the planning model at the activity scenario level, the system automatically validates the staged data being inserted into the line item activity. For standard or project type scenarios, the system performs combination edit validations; for control budget type scenarios, the system also validates against the defined Commitment Control rulesets. A red X icon appears for the line items the system cannot validate, instead of a green check mark.
Fields display here based on the selected dimension of this activity and scenario.
Account |
Enter the desired dimension value for the new line item budget. The value that you enter determines the default method. The system uses the method that the coordinator assigns to the account using the Assign Planning Method Defaults page.
Note. The account dimension is required when you add a new
budget entry. |
Access the Planning Targets page (select Planning Target from the Action dropdown list box on the Line Item Details page, and then click Go).
Tolerance Rules
Target Tolerance % (target tolerance percent) and Target Tolerance Amount |
Display values that are established at the coordinator level. |
Planning Target Details
The system displays the line item budget according to the planning center and account or account node. When displaying data, the system recognizes the sign definitions that you specify using the Account Type Options page.
Compare the planning target and budget total with the amount difference and percentage variance.
If the control level is set to active and the line item does not comply with the planning target rules and tolerances, you cannot submit the budgets.
Note. If you budgeted for items that do not roll to the
target node or account, these line items appear in the Planning Target Error
Details group box.
If you do not have full access to the details in your planning center
due to secondary security being applied to the activity, you will not be able
to access the Planning Target Details page.
See Also
Setting Up Planning Target Rules
Access the User View Details page (click the Create link in the User View group box on the Line Item Details page).
Enter a description for the view definition.
Click Copy to copy the user view.
Access the Row Display Filter page (select the Row Display Filter tab on the User View Details page).
Note. If your user role is casual preparer, you cannot define any private views. You may only select public views defined by the coordinator.
Dimensions |
Displays only those dimensions available to you, defined by the activity. |
Dimension Level |
Select up to three dimensions to display on the row, nested hierarchically in the order in which you select them. Values are First, Second,and Third. This field is grayed out if all of the following conditions are true:
Note. For a flat view, do not select any dimension levels. |
Show Code |
Select to display the associated dimension's value code. |
Show Description |
Select to display the associated dimension's description. |
Filter Dimension Members tab |
Specify the From and To range and the Account Category that you want to display for each of the dimension rows. |
Access the Row Display Options page (select the Row Display Options tab on the User View Details page).
Row Summary |
Select to display only summary nodes for the first row dimension. |
Row Detail |
Select to display only detailed (editable) cells for all row dimensions. |
Hide Zero Total Amounts for Proposed Budget/Forecast |
Select to hide line items for which the total amount is zero (0). If you select this option, the system displays only those line items with entered values. |
Method Amount |
Select to display the assigned method rows for accessing method details or entering budget amounts. |
Adjustment Amount |
Select to display rows for incremental or mass adjustment amounts when applied. |
Allocation Amount |
Select to display amount rows that you cannot modify using the line item activity; these amounts are applied through the Edit Allocation option when available on My Planning Workspace for the master version. |
Total Amount |
Displays the total of the method, adjustment, and allocation amount. Note. Access to modifying the method, adjustment, and allocation amount must be granted. |
Display Entry Currency |
Select to display all entry currency rows. Alternatively, enter a currency value in the Filter Dimension Members grid on the Row Display Filter page to display only one entry currency. |
Display Statistic Rows |
Select to display the statistical amount rows, and then enter a statistical value in the Filter Dimension Members grid on the Row Display Filter page to display only one statistical type. |
Display Target Currency |
Select to display one or all target currencies. You cannot view statistical rows and target currencies at the same time. |
One |
Select to display one target currency, and then select the currency from the dropdown list box. |
All |
Select to display all target currencies. |
Access the Column Display Options page (select the Column Display Options tab on the User View Details page).
Period Summary |
Select to display only summary nodes for the budget periods. |
Period Detail |
Select to display only detailed (editable) cells for all budget periods. |
Prior Year Actuals, Year To Date Actuals, Current Year Budget, Current Year Forecast and any other history periods defined by the coordinator |
Select which columns of historical data you want to display during line item preparation. Historical information appears as full year totals in the columns. |
Access the ChartField Errors page (click Review Error on the Line Item Details page) or the Modify Dimensions page (click the Modify Dimensions button on the Line Item Details page).
If you access this page by clicking the Review Error link (icon that includes a red x) on the Line Item Details page, the dimension error resulting from the dimension validation process appears. The type of error for the line item appears to the right of the dimension that resulted in an error.
To Value |
Enter a different dimension value for an existing line item. |
Delete |
Click to delete a specific line item activity row. Important! The system does not have the ability to compare to historical data without an existing row in the line item activity. When deleting rows with associated historical data, you will not be able to view the corresponding history for any deleted rows. |
Access the Line Item Notes page (click Notes on the Line Item Details page).
Notes
Use the fields in the Enter Notes section to add a note. Type your note in the edit box.
Public Note |
Select to let other users view your notes. |
Private Note |
Select so that only you can view your notes. |
Append Note to Log |
Click to save and attach a note to the notes log. |
Date Time Stamp |
The system applies a date and time stamp, attaches a user ID to the note, and indicates whether the note is private or public. |
|
Click the Delete This Row icon to delete a note that you create. Other users cannot delete your notes. |
Use the fields in the Notes Log section to review stored notes. Click the arrows to browse through the notes, or click View All to see all notes of the selected type on one page.
Attach Documents
Use the fields in this section to manage attachments.
File Name |
Contains the name of the file. This field is populated automatically when you attach the file. Click the name to view the file. |
Description |
Enter a description of the attachment. |
Attach |
Click to upload a file. A window appears that enables you to browse to and select the file, or enter the path and filename. |
Delete |
Click to delete an attachment. |
Note. You must define an FTP server using the PeopleTools URL Maintenance page for the attachments feature to work. To access this page, select PeopleTools, Utilities, Administration, URL Maintenance. Update the BP_ATTACHMENT_FTP_SERVER URL Identifier with your FTP Server information.
See Setting Up File Transfer Protocols.
Access the individual method pages to view the budget period details and adjust line item amounts.
See Setting Up Methods.
Every line within a budget has a method assigned to it. A method defines how the system calculates the budget amount for the line or derives the amount if a calculation is not necessary.
This section provides an overview of method calculations, method attributes, and how methods work, lists common elements, and discusses how to use the:
AMTFTE (amount per full-time equivalent) method.
AMTHC (amount per headcount) method.
AMTPER (amount per budget period) method.
AMTUNT (amount times defined units) method.
ANN% (annual growth percentage) method.
ASSET (from asset budgeting) method.
BASBUD (base budget) method.
DISTR (distribution) method.
ECODRV (economic driver) method.
FLEX (flexible formula) method.
LINEITEM (from line item) method.
ITM (itemization) method.
JOIN method.
METH=0 (zero method amount) method.
PER% (period growth percentage) method.
POSBUD (from position budgeting) method.
RELATE (related account or statistical code) method.
UNTAMT (units times defined amount) method.
The method group ID associated with a line item activity from the Activity Group page defines the methods that are available during the planning and budgeting development process.
The following methods require a calculation:
AMTFTE: The system uses a defined amount for each full-time equivalent (FTE).
AMTHC: The system uses a defined amount for each headcount.
ANN%: The system applies an annual growth rate to an historical or current base value.
ECODRV: The system applies a growth rate to an historical or current base value.
PER%: The system uses a defined growth rate for a budget period.
RELATE: The system multiplies a percentage or amount by a line item entry.
FLEX: The system calculates the budget amount using the user-defined formula specified for this line item
The following methods do not require a calculation because the system derives the budget amounts through other means:
AMTPER: Enter a budget amount by budget period.
ASSET: The system derives budget amounts from the details in the asset budgeting activity.
BASBUD: The system uses the base budget as the budget amount.
POSBUD: The system derives budget amounts from the details in the position budgeting activity.
LINEITEM: The system derives the budget amounts from the associated line item child activity.
A method can have an associated driver, driver parameter, and base. Coordinators create drivers for the methods that require them.
Methods that use delivered drivers include AMTFTE and AMTHC.
For example, you can use the BC FTE (planning center full-time equivalent) driver or the BU FTE (business unit full-time equivalent) driver for the AMTFTE method. You cannot change or add a driver for this method.
The value that you use as the driver—the driver parameter—determines the line item budget calculation. For example, suppose that the AMTFTE method uses the BC FTE driver. The coordinator defines the driver parameter as 100.00 USD. The system calculates the number of FTEs based on the position budgeting activity, and then multiplies it by 100.00 USD. You can change the driver amounts for the BC FTE driver only if the coordinator enables overrides. You cannot change the FTE count for this AMTFTE method. The system calculates it based on information in the position budgeting activity.
The following seven methods allow the use a lookup table for their driver parameters:
AMTFTE
AMTHC
AMTUNT
DISTR
FLEX
RELATE
UNTAMT
Coordinators use lookup tables to assign specific driver values to each planning center in the organization. Coordinators can choose to use these lookup tables to assign driver parameters or to define a default value for the method driver.
A method can also have a base against which the method is applied. Define the following types of method bases:
Prior year actuals
Year-to-date actuals
Current year budget
Current year forecast
History (up to five optional values that the coordinator defines)
Note. The following methods cannot be used with top-down
scenario types: ASSETS, AMTFTE, AMTHC, and POSBUD.
The following methods cannot be used with forecast scenario types: ASSETS,
AMTFTE, AMTHC, POSBUD, ANN%, PER%, and ECODRV.
If you want the system to calculate the line item budget for travel expenses by applying an inflation factor to the prior year actual expenditure for travel, the method base is the prior year actual expenditure figure.
The ECODRV method, which applies a growth rate to an historical value on an annual basis, uses both a driver parameter and a method base. For this method, define a growth rate (driver parameter) and an historical value (method base) on which to apply the growth rate. For example, you could specify a 5 percent growth rate (driver parameter) and apply it to the prior year budget value of 88,000.00 USD (method base) for the vehicle maintenance budget. The system calculates 92,400.00 USD as the proposed vehicle maintenance budget. For budgets that contain more than one period, such as quarterly periods, you may choose to spread the amount evenly or weight it.
Coordinators define the default methods and the method details (driver, driver parameter, and base) for line items in the planning model. A preparer can override the defaults if the coordinator enables overrides for the method. Each method criterion has its own override check box. Overriding a method is not the same as overriding the driver, driver parameter, or method base associated with the method. For the ANN% and PER% methods, the driver parameter is not defined by the coordinator; instead, the preparer enters the parameter when preparing the budget.
The following table shows the method attributes of the delivered methods. Change the method name to suit your organization's needs.
For budget preparers, detailed method definitions appear on a separate page. The method pages display similar information with variations in the use of drivers, driver parameters, and base fields depending on the method type. For the ASSET, POSBUD, METH=0, and BASBUD methods, the method detail pages are used only to make adjustments (when applicable) and to view total and period details.
Method ID |
Delivered Drivers |
Coordinator-Defined Drivers |
Coordinator-Defined Driver Parameter |
Required Method Base |
User Action |
AMTFTE |
BC FTE BU FTE |
No |
Yes The coordinator can define the amount per FTE. The system calculates the FTE count using position-budget data. |
NA |
Update the amount if override is allowed. |
AMTHC |
BC HC BU HC |
No |
Yes The coordinator can define the amount per headcount. The system calculates the headcount using position-budget data. |
NA |
Update the amount if override is allowed. |
AMTPER |
NA |
NA |
NA |
NA |
Enter the amount per period. |
AMTUNT |
No |
Yes |
Yes |
NA |
Enter the cost for predefined units. |
ANN% |
NA |
NA |
NA |
Yes |
Enter the growth rate. |
ASSET |
NA |
NA |
NA |
NA |
NA |
BASBUD |
NA |
NA |
NA |
NA |
NA |
DISTR |
No |
Yes |
Yes |
NA |
Update the amount if override is allowed. |
ECODRV |
No |
Yes |
Yes |
Yes |
No user action is required unless override is allowed. |
ITM |
QTY*COST PERSUM |
No |
NA |
NA |
Enter the number of units and cost per unit, or enter the calculated amount. |
JOIN |
No |
Yes |
Yes |
NA |
No user action is required unless override is allowed. |
LINEITEM |
NA |
NA |
NA |
NA |
NA |
METH=0 |
NA |
NA |
NA |
NA |
NA |
PER% |
NA |
NA |
NA |
Yes |
Enter the growth rate by budget period. |
POSBUD |
NA |
NA |
NA |
NA |
NA |
RELATE |
No |
Yes |
Yes |
NA |
No user action is required unless override is allowed. |
UNTAMT |
No |
Yes |
Yes |
NA |
Enter the number of units for predefined cost. |
FLEX |
No |
Yes |
NA |
NA |
Specify the Flexible Formula |
This section reviews how methods work and provides examples. The methods available and their attributes, such as drivers, parameters, and analysis base, are defined by the coordinator. They can be assigned to specific accounts as a default, or available for the end users' use during line item preparation.
Note. We do not discuss the AMTPER, ASSET, BASBUD, METH=0, and POSBUD methods here because these methods do not use a driver, driver parameter, or method base.
Position budgeting data defines the number of FTEs for a planning center or business unit, and is only used in conjunction with a position activity. The coordinator defines the cost per FTE to be calculated against the number of FTEs by budget period. The AMTFTE method does not use a method base. The formula for the AMTFTE method is:
(Cost per FTE for a budget period) * (Number of FTEs) = (Calculated amount for a budget period)
After the system calculates the amounts for each budget period and the totals for all budget periods, it adds them together to calculate the total method amount for the line item:
(Sum of all calculated budget period amounts) = (Method amount for line item)
For example, suppose that you are responsible for developing the office supplies budget for a new department that is starting up at the beginning of 2008. You want to accomplish this by budgeting 33.00 USD for each FTE in the department. You figure that, with the discount that your organization receives from the vendor, 33.00 USD for each FTE should be enough to cover the one-time costs of new office supplies and the ongoing costs of supplies for a year.
Use the AMTFTE method to budget for the office supplies line item and use the following data:
Field |
Value |
Budget Period |
Annual |
Amount |
33 USD |
Driver |
BC FTE |
Suppose that the planning center FTE value is 10. This is the number of FTEs that comes from the position budgeting data. The planning center (the new department) has 10 FTEs because that is the number of FTEs authorized to staff the new department.
The system calculates the following 2008 office supplies budget amount:
Line Item |
2008 Total Budget Amount |
Office Supplies |
330 USD |
Note. When using the system delivered BU FTE driver with this method, the FTE count comes from the sum of all FTEs for the scenario and depends on the FTE count in the master version to capture this information. Therefore, an FTE value and calculated amount could vary until all related information is in the master version from planning center details.
The position budgeting data defines the headcount for a planning center or business unit, and is only used in conjunction with a position activity. The coordinator defines the cost per headcount to be calculated against the headcount by budget period. The AMTHC method does not use a method base. The formula for the AMTHC method is:
(Cost per headcount for a budget period) × (Headcount) = (Calculated amount for a budget period)
After the system calculates method amounts for all budget periods, it adds them together to calculate the total method amount for the line item:
(Sum of all calculated budget period amounts) = (Method amount for line item)
For example, suppose that you are budgeting for a business unit's annual employee recognition reception. You want to budget 7.00 USD per person for the beverages line item; so you enter 7.00 as the amount. You know that every employee within the business unit center plans to attend the event. The position budgeting data calculates a headcount of 2,670 employees in the planning center. The calculated line item budget amount is 18,690.00 USD, which is 2,670 multiplied by 7.00 USD.
Note. When using the system delivered BU HC driver with this method, the headcount (HC) comes from the sum of all headcounts for the business unit model and depends on the total headcount located in the master version to capture this information. Therefore, your headcount value and calculated amount could vary until all related information is located in the master version from planning center details.
Using the AMTUNT method, the coordinator controls the number of units, and the preparer enters the cost per unit. The AMTUNT method uses a driver and driver parameters. Coordinators define drivers and driver parameters. For example, a coordinator can define drivers and driver values for such quantities as the number of trade shows planned, training classes, or items produced. Use any of these drivers and driver parameters to estimate a budget for a particular method. The method does not use a method base.
The formula for the AMTUNT method is:
(Cost per unit for a budget period) * (Number of units for a budget period) = (Calculated amount for a budget period)
After the system calculates the method amounts for all budget periods, it adds them together to calculate the total method amount for the line item:
(Sum of all calculated budget period amounts) = (Method amount for line item)
For example, suppose that you want to budget for supplies in the Customer Training Center. You want to estimate a certain amount for every student enrolled per quarter (assuming that the budget period is quarterly). The coordinator defines the number of students enrolled per quarter.
Enter the amount per enrolled student that you want to budget per quarter, and the system calculates the budget amounts for you as shown in the following table:
Budget Period |
Amount per Unit (USD) |
Number of Units (Defined at the Coordinator Level) |
Calculated Amount (USD) |
2008 Q1 |
2.00 |
2,000 |
4,000 |
2008 Q2 |
1.50 |
2,000 |
3,000 |
2008 Q3 |
2.00 |
2,500 |
5,000 |
2008 Q4 |
2.50 |
2,400 |
6,000 |
2008 Total |
18,000 |
The ANN% method uses a method base. It does not use a driver or driver parameter. Enter an annual growth rate that the system applies to the method base to calculate the method amount. The formula for the ANN% method is:
(Method base) * [1 + (Growth rate)] = (Method amount)
For example, suppose that you use the ANN% method to estimate office supply expenses for 2008 (assuming that there are no adjustments or allocations). To apply a 5 percent growth rate to the 2001 actual expenditure for office supplies, enter Prior Year Actuals as the base and 5 for the percentage. If the annual 2001 actual expenditure for office supplies was 5,000.00 USD, the 2008 budget amount calculation is 5,250.00 USD for the year.
Use the DISTR method to distribute or assign constant budget amounts by planning center when the activity scenario is staged for end users to work with their budgets. The DISTR method does not use a method base.
In line item budgeting, view the default values assigned to the planning center in the Amount column. If no overrides are allowed, you cannot change the driver. If overrides are allowed, select another driver. When overrides are allowed for the driver parameter, you can also change the amounts in the Amount column.
For example, suppose that the central budget office is responsible for the distribution of rent expenses across the organization. This expense is typically assigned and pushed down to the planning centers. In this case, constant dollar amounts are already assigned to an account by planning center when you copy from the base version.
The Economic Driver method uses a driver, driver parameter, and method base. Coordinators define the drivers, driver parameters, and method base when assigned to a specific account. For example, a coordinator can define drivers and driver values for economic indicators such as inflation rate, gross domestic product, unemployment rate, employment cost index, business licenses, and housing construction starts. Use any of these drivers and driver parameters to estimate a budget for a particular line item. The method is based on annual budget periods. It also uses a method base. Select a method base, and then enter the percentage rate that you want to apply against the base to calculate the method amount for the line item. The formula for the ECODRV method is:
(Method base) * [1 + (Percentage)] = (Method amount)
For example, suppose that you want to use the ECODRV method to estimate revenue growth based on the projected increase in sales in a region. Define a driver as regional growth and assign a driver parameter of 5 percent to it. The base is 1.5 million USD—the actual revenue figure for the prior year. The system calculates a budget amount for revenue of 1.575 million USD.
The ITM method does not use driver parameters or a method base. Define an item, select one of the delivered drivers, and then enter values for each item that the system uses to calculate the method amount. The formula for the ITM method using QTY*COST is:
(Number of units) * (Cost per unit) = (Calculated amount)
The formula for the ITM method using PERSUM is:
(Sum of calculated amounts for all items) = (Method amount)
The following table shows an example of a 2008 annual budget by quarter (the budget period) for travel expenses using the ITM method:
Line Item |
2008 Quarter 1 |
2008 Quarter 2 |
2008 Quarter 3 |
2008 Quarter 4 |
2008 Total Budget Amount |
Travel Expenses (USD) |
2,000 |
8,000 |
2,000 |
5,000 |
17,000 |
If you access the Itemization page for this example, you see the following data that supports the travel expense line item results:
Line Item |
Description |
Number of Units |
Cost Per Unit (USD) |
Spread Type |
From Budget Period |
To Budget Period |
1 |
Annual conference trips |
5 |
1,200 |
Spread |
2008-Q2 |
2008-Q2 |
2 |
Bus transportation for the employee appreciation event |
6 |
500 |
Spread |
2008-Q4 |
2008-Q4 |
3 |
Trips to national city and county managers' conferences |
2 |
4,000 |
Spread |
2008-Q1 |
2008-Q4 |
The JOIN method combines the existing methods UNTAMT and AMTUNT into one method. It multiplies the defined amount by the defined unit. The JOIN method provides the driver parameter values for the amount per unit and number of units. Coordinators define the drivers and driver parameters. A coordinator can define drivers and set standard costs or number of units. This method requires a known number of units (such as number of computers) and the cost per unit must be defined. These components have already been linked and assigned a driver ID such as COMPUTERS. For example, when you select COMPUTERS as the driver ID, the system provides information by period for units and cost.
If the coordinator allows overrides of the driver parameter, change the parameters by entering new amounts in place of existing ones. If the coordinator allows driver overrides, change the driver, but only if there are other JOIN drivers defined. If overrides are not allowed, both the Number of Units column and the Cost Per Unit column are display-only.
This method can be associated with a driver lookup table by default.
For example, suppose that the coordinator defines the number of units per budget period as 2 and the cost per unit of travel as 2,500.00 USD. For any type of employee travel, the standard cost estimate per trip is 2,500.00 USD. The new travel policy for the department allows only two trips per month.
The coordinator defines a driver called TRAVEL to calculate two trips per month per department at a cost of 2,500.00 USD each. You know that in December there will be three authorized trips and that in August there will be only one. In this case, you could select the TRAVEL driver, and then override the entries for the 8th and 12th budget periods.
Budget Period |
Number of Units (Defined at the Coordinator Level) |
Amount Per Unit (USD) (Defined at the Coordinator Level) |
Calculated Amount (USD) |
2008 Month 1 |
2 |
2,500 |
5,000 |
2008 Month 2 |
2 |
2,500 |
5,000 |
2008 Month 3 |
2 |
2,500 |
5,000 |
2008 Month 4 |
2 |
2,500 |
5,000 |
2008 Month 5 |
2 |
2,500 |
5,000 |
2008 Month 6 |
2 |
2,500 |
5,000 |
2008 Month 7 |
2 |
2,500 |
5,000 |
2008 Month 8 |
1 |
2,500 |
2,500 |
2008 Month 9 |
2 |
2,500 |
5,000 |
2008 Month 10 |
2 |
2,500 |
5,000 |
2008 Month 11 |
2 |
2,500 |
5,000 |
2008 Month 12 |
3 |
2,500 |
7,500 |
2008 Total |
60,000 |
The PER% method uses a method base. The PER% method does not use a driver or driver parameter. Enter a growth rate value for each budget period. The system applies the growth rate to the method amount for the prior budget period. The formula for the PER% method is:
(Prior budget period calculated amount) * [1 + (Budget period growth rate)] = (Next budget period calculated amount)
There is one exception to this formula. No prior budget period calculated amount exists for the first budget period calculated amount. The calculated amount for the first budget period uses the defined method base. The system uses this formula to calculate the first budget period calculated amount:
(Last budget period of method base) * [1 + (Budget period growth rate)] = (Calculated amount for the first budget period)
After the system calculates the amounts for all budget periods, it adds them together to calculate the total method amount for the line item.
(Sum of all calculated budget period amounts) = (Method amount for line item)
For example, suppose that you want to generate a 2008 budget amount for telephone expenses using the PER% method and you have quarterly budget periods. Assume there are no adjustments or allocations. You define base as Current Year Budget, which has a Q4 budget amount of 100.00 USD. You define the method using the following data:
Budget Period |
Percentage |
Q1 |
20 |
Q2 |
10 |
Q3 |
50 |
Q4 |
25 |
Your 2008 budget for telephone expenses using the PER% method would be as follows:
Line Item |
2008 Quarter 1 |
2008 Quarter 2 |
2008 Quarter 3 |
2008 Quarter 4 |
2008 Total Budget Amount |
Telephone Expenses (USD) |
120.00 |
132.00 |
198.00 |
247.50 |
697.50 |
The RELATE method lets you define a line item budget by associating it with other account or statistical code amounts. Define these line item amounts or rates at a single, global level or value, or assign a lookup table driver to reference values specific to a planning center. The RELATE method accommodates the following scenarios in a line item activity:
To calculate anticipated overtime expenses, you could use the RELATE method to define a global percentage of 5 percent to be multiplied times account 610000 for employee salary. In this case, the driver is associated with the driver ID name, account, and percent value. The account reference is display-only if the coordinator prohibits driver parameter overrides.
An example using a statistical code follows:
To calculate the anticipated overtime expenses using the statistical code, the budget office could assign a lookup ID to the driver and use a statistical code instead of an account. In this case, the Basis and Value Type columns display the statistical source value used to calculate total overtime hours. The Value column represents an amount or rate applied against this statistical amount. In this case, the value is drawn from the driver lookup table (if a value exists for the planning center).
In the UNTAMT method, the coordinator controls the costs per unit and the preparer enters the number of units. The UNTAMT method uses a driver and driver parameter. Coordinators define the drivers and driver parameters. A coordinator can define drivers and set standard costs for such items as airfare, hotel accommodations, computers, desk furniture, and vehicles. Use these drivers and driver parameters to estimate a budget for these items. The method does not use a method base. The preparer enters the number of units to be calculated against the cost per unit by budget period.
The formula for the UNTAMT method is:
(Number of units for a budget period) * (Cost per unit for a budget period) = (Calculated amount for a budget period)
After the system calculates the method amounts for all budget periods, it adds them together to calculate the total method amount for the line item:
(Sum of all calculated budget period amounts) = (Method amount for line item)
Suppose that the coordinator defines the cost per unit of travel as 2,500.00 USD for all budget periods. For any type of employee travel, the standard cost estimate per trip is 2,500.00 USD. You do not override this predefined cost per trip. You have monthly budget periods. You enter the number of trips estimated for the planning center for each month, and the budget amounts per budget period are calculated as shown in the following table:
Budget Period |
Number of Units |
Amount Per Unit (USD) (Defined at the Coordinator level) |
Calculated Amount (USD) |
2008 Month 1 |
0 |
2,500 |
0 |
2008 Month 2 |
2 |
2,500 |
5,000 |
2008 Month 3 |
1 |
2,500 |
2,500 |
2008 Month 4 |
0 |
2,500 |
0 |
2008 Month 5 |
4 |
2,500 |
10,000 |
2008 Month 6 |
0 |
2,500 |
0 |
2008 Month 7 |
2 |
2,500 |
5,000 |
2008 Month 8 |
3 |
2,500 |
7,500 |
2008 Month 9 |
7 |
2,500 |
17,500 |
2008 Month 10 |
1 |
2,500 |
2,500 |
2008 Month 11 |
0 |
2,500 |
0 |
2008 Month 12 |
5 |
2,500 |
12,500 |
2008 Total |
25 |
2,500 |
62,500 |
Dimensions |
The information in this collapsible group box identifies the version and specific line item budget on which you are working. The defaults are determined by the information associated with the version you edit, and by the user preferences or defaults for the line item activity that you select from My Planning Workspace. |
Totals |
The budget data in this collapsible group box provides detailed information about the line item budget amount. |
Historical Values |
The current and historical data in this group box lets you compare the a line item budget amount with historical values. This data is associated with the analysis base definition for the planning model and is defined at the coordinator level. |
Adjustment |
Select how you want to automatically apply the spread amount over the budget periods, and then click Spread. The calculated adjustment appears in the Adjustment Amount field until it is saved. Values are: Apply to All: The system populates each budget period with the spread amount that you enter. Spread Evenly: The system distributes the spread amount equally across the budget periods for the line item. Weighted Method: The system adjusts the amount on a proportional basis against the method total that appears when performing the spread. Weighted Total: The system adjusts the amount on a proportional basis against the current total amount when performing the spread. Note. The Adjustment you specify here does not apply to the starting balance for balance sheet accounts. You can manually enter adjustments to balance sheet starting balances in the Budget Period Details grid of the method detail page, in the Adjustment Amount column. See See individual method detail page discussions for more details. |
Analysis 1 and Analysis 2 |
Select these tabs to display budget comparisons by budget period. The Analysis 2 tab is available only if the coordinator defines analysis bases for History 1 through 5. |
Page Name |
Definition Name |
Navigation |
Usage |
BP_LI_GRID |
Click the Edit link on the My Planning Workspace page. |
View, add, and modify budget amounts using methods; manually enter budget amounts for a line item; protect a line item budget from mass adjustments. |
|
BP_LI_AMTFTE |
|
View and modify the driver and cost per FTE used to calculate the method amount for a line item. Enter an adjustment amount by budget period. |
|
BP_LI_AMTHC |
|
View and modify the driver and cost per headcount used to calculate the method amount for a line item. Enter an adjustment amount by budget period. |
|
BP_LI_AMTPER |
|
View and manually enter a line item budget amount by budget period. Enter an adjustment amount by budget period. |
|
BP_LI_AMTUNT |
|
Add and modify the cost per unit used to calculate the method amount for a line item. Also override the driver and the defined number of units. Enter an adjustment amount by budget period. |
|
BP_LI_ANNP |
|
Add and modify the base value and add the annual growth percentage rate to calculate the method amount for a line item. Enter an adjustment amount by budget period. |
|
BP_LI_DISTRB |
|
View and modify the driver and driver amount used to calculate the method amount for a line item. Enter an adjustment amount by budget period |
|
BP_LI_ECODRV |
|
View and modify the annual growth rate applied to a defined base. Override the base and driver. The system uses these values to calculate the method amount for a line item. Enter an adjustment amount by budget period. |
|
BP_LI_FLEXFORM |
|
View and modify the Flexible Formula used to calculate the values for this line item. Enter an adjustment amount by budget period. |
|
Method Detail (page name varies with the method selected) |
BP_LI_PRD_DTL |
|
View and optionally adjust any of the following methods that share the characteristic of deriving their definition from another activity: LINEITEM, ASSET, and POSBUD. View and optionally adjust METH=0 and BASBUD methods. |
BP_LI_ITM |
|
Add and modify the items used to calculate the method amount for a line item. Enter a value or calculate a value by entering the number of units and cost per unit. Enter the spread type and budget period range for each item to be included in the method amount for a line item. Enter an adjustment amount by budget period. |
|
BP_LI_JOIN |
|
View and modify the driver or driver parameters for cost and units used to calculate the method amount for a line item. Enter an adjustment amount by budget period. |
|
BP_LI_PERP |
|
View and modify the base value and add any budget period growth rate used to calculate the method amount for a line item. Enter an adjustment amount by budget period. |
|
BP_LI_RELATE |
|
View and modify a percentage or amount with which an account or statistic code is associated and calculated. The system uses these values to calculate the method amount for a line item. You can also modify the account or statistic code if override is not prevented. Enter an adjustment amount by budget period. |
|
BP_LI_UNTAMT |
|
Add and modify the number of units used to calculate the method amount for a line item. Also override the driver and the defined cost per unit. Enter an adjustment amount by budget period. |
Access the Amount Per FTE page (from the Line Item Details page, select AMTFTE from the Method ID dropdown list box, then click the Amount link).
The AMTFTE method uses a driver and driver parameter. Select one of the delivered drivers as the driver of the method. The coordinator cannot add other drivers since they are system defined.
Default |
Displays the same default method that appears on the Line Item Details page. |
Method ID |
Displays AMTFTE to override the default method. |
Driver ID |
Select from the delivered drivers for the AMTFTE method. Values are: BC FTE: The number of FTEs for the planning center. BU FTE: The number of FTEs for the business unit. |
Cost Per FTE (cost per full-time equivalent) |
Enter a value to override the default for each budget period. The system multiplies this amount by the number of FTEs to determine the calculated amount for a budget period. When working with balance sheet planning activities, no starting balance is available with the method. You must use the adjustment option if a starting balance is necessary. |
Adjustment Amount |
For all budget period rows the system displays the calculated adjustment amount based on the Spread Amount and Spread Type you selected in the Adjustment box, or optionally make incremental adjustment by budget period. When working with an activity that includes balance sheet planning, you must manually enter a change to the starting balance for a balance sheet account, because the use of the Spread Amount and Spread Type do not apply to the starting balance. The coordinator may set the account default on the Assign Planning Method Defaults page to prevent any adjustments on the Amount Per FTE page. |
Note. If your organization does not use position budgeting, the coordinator can disable the AMTFTE method to make it unavailable.
Access the Amount Per Headcount page (from the Line Item Details page, select AMTHC from the Method ID dropdown list box, then click the Amount link).
The AMTHC method uses a driver and driver parameter. Select one of the delivered drivers as the driver of the method. The coordinator cannot add other drivers since they are system defined.
Default |
Displays the same default method that appears on the Line Item Details page. |
Method ID |
Displays AMTHC to override the default method. |
Driver ID |
Select from the delivered drivers for the AMTHC method. Values are: BC HC: The headcount number for the planning center. BU HC:The headcount number for the business unit. |
Cost Per Headcount |
Enter a value to override the default for each budget period. The system multiplies this amount by the headcount to determine the calculated amount for a budget period. When working with balance sheet planning activities, no starting balance is available with the method. You must use the adjustment option if a starting balance is necessary. |
Adjustment Amount |
For all rows the system displays the calculated adjustment amount based on the Spread Amount and Spread Type you selected in the Adjustment box. When working with an activity that includes balance sheet planning, you must manually enter a change to the starting balance for a balance sheet account, because the use of the Spread Amount and Spread Type do not apply to the starting balance. The coordinator may set the account default on the Assign Planning Method Defaults page to prevent any adjustments on the Amount Per Headcount page. |
Note. If your organization does not use position budgeting, the coordinator can disable the AMTHC method to make it unavailable.
Access the Amount Per Period page (from the Line Item Details page, select AMTPER from the Method ID dropdown list box, then click the Amount link).
The AMTPER method does not use a driver, driver parameter, or method base. Use the AMTPER method to enter budget amounts by budget period to determine the amount for the line item. Applying the AMTPER method to a line item lets you manually control the amount to budget per budget period.
Default |
Displays the same default method that appears on the Line Item Details page. |
Method ID |
Displays AMTPER to override the default method. |
Spread Amount |
Enter the total amount to spread across budget periods. |
Spread Type |
Select the desired spread type. Values are: Apply to All or Spread Evenly. In addition to the system delivered spread types, custom spread types may be available if the coordinator defined them. |
Amount |
Enter a value manually for each period. When working with a balance sheet planning activity, the first budget period row displayed is the starting balance (period 0) for balance sheet accounts. The sum of all the budget period amounts is the method amount for the line item. |
Adjustment Amount |
For all rows the system displays the calculated adjustment amount based on the Spread Amount and Spread Type you selected in the Adjustment box. When working with an activity that includes balance sheet planning, you must manually enter a change to the starting balance for a balance sheet account, because the use of the Spread Amount and Spread Type do not apply to the starting balance. The coordinator may set the account default on the Assign Planning Method Defaults page to prevent any adjustments on the Amount Per Period page. |
Note. The AMTPER method is the only one that allows update into a spreadsheet interface when using the spreadsheet add-in option for line item activities.
See Using Spreadsheet Add-In Functionality.
See Also
Access the Amount x Defined Units page (from the Line Item Details page, select AMTUNT from the Method ID dropdown list box, then click the Amount link).
Default |
Displays the same default method that appears on the Line Item Details page. |
Method ID |
Displays AMTUNT to override the default method. |
Driver ID |
Select the desired driver. Available driver options include those assigned by the coordinator. |
Cost Per Unit and Number of Units |
Enter values to override the defaults for each budget period. When working with a balance sheet planning activity, the balance sheet accounts have a starting balance row (period 0) which defaults to 0 for cost per unit and number of units. You can override the defaults if override is allowed. The system multiplies these values to determine the method amount for each budget period. |
Adjustment Amount |
For all rows the system displays the calculated adjustment amount based on the Spread Amount and Spread Type you selected in the Adjustment box. When working with an activity that includes balance sheet planning, you must manually enter a change to the starting balance for a balance sheet account, because the use of the Spread Amount and Spread Type do not apply to the starting balance. The coordinator may set the account default on the Assign Planning Method Defaults page to prevent any adjustments on the Amount x Defined Units page. |
Access the Annual Growth Percentage page (from the Line Item Details page, select ANN% from the Method ID dropdown list box, then click the Amount link).
Default |
Displays the same default method that appears on the Line Item Details page. |
Method ID |
Displays ANN% to override the default method. |
Base |
Select the analysis base to which the method is applied. |
Spread Type |
Select the desired spread type. Values are: Spread Evenly or Spread Weighted. |
Growth Percentage |
Enter the annual growth rate that you want applied to the base. When working with a balance sheet planning activity, this growth percentage does not apply to the starting balance (budget period 0) of balance sheet accounts. You can use the adjustment column when it is necessary to change the starting balance. |
Budget Period |
For balance sheet planning activities the starting balance row for balance sheet accounts defaults to the amount stored in the analysis base (if available) or 0. |
Adjustment Amount |
For all rows the system displays the calculated adjustment amount based on the Spread Amount and Spread Type you selected in the Adjustment box. When working with an activity that includes balance sheet planning, you must manually enter a change to the starting balance for a balance sheet account, because the use of the Spread Amount and Spread Type do not apply to the starting balance. The coordinator may set the account default on the Assign Planning Method Defaults page to prevent any adjustments on the Annual Growth Percentage page. |
Access the Line Item Details page (Planning and Budgeting, Activity Preparation, My Planning Workspace then click the Edit link).
The ASSET method does not use a driver, driver parameter, or method base. Assign the ASSET method to line items on the Line Item Details page in the budget to indicate that the budget amounts are calculated from asset data. When working with a balance sheet planning activity, the starting balance for balance sheet accounts can be populated from the Asset activity when including in-service assets from your source system. This starting balance represents the asset's original cost. Dimension combinations within line item activity pick up asset values defined in detail within the Asset Budgeting activity. The coordinator typically assigns the ASSET method as a default to all asset and depreciation accounts, and optionally the cash account when used.
The preparer cannot modify a method amount for a line item with the ASSET method. However, authorized users can apply adjustments, apply allocations, and select to hold the line item from mass adjustments. Preparers can also override the ASSET method assigned to a line item if the coordinator enables method overrides.
Note. If your organization does not use asset budgeting, the coordinator can disable the ASSET method to make it unavailable.
Access the Line Item Details page (Planning and Budgeting, Activity Preparation, My Planning Workspace then click the Edit link).
For all line item activities, the source or seed data populating the proposed plan or budget is referred to as the base budget (BASBUD method).
The BASBUD method does not use a driver, driver parameter, or method base. The coordinator assigns the BASBUD method to line items to indicate that the budget amounts are derived from some historical base or historical amount. This base budget can serve as a starting point to prepare line item activities. The starting balance for balance sheet accounts defaults from the analysis base amount when available. Apply adjustments and allocations, and then select to hold the line item from mass adjustments. If the budget includes line items assigned the BASBUD method, preparers can override the method if the coordinator enables method overrides.
Access the Distribution Details page (from the Line Item Details page, select DISTR from the Method ID dropdown list box, then click the Amount link).
Default |
Displays the same default method that appears on the Line Item Details page. |
Method ID |
Displays DISTR to override the default method. |
Driver ID |
Select from the drivers assigned at the coordinator level. |
Amount |
Enter a value for each budget period. When working with a balance sheet planning activity, the starting balance row for balance sheet accounts defaults to 0, which you can modify if override is allowed. |
Adjustment Amount |
For all rows the system displays the calculated adjustment amount based on the Spread Amount and Spread Type you selected in the Adjustment box. When working with an activity that includes balance sheet planning, you must manually enter a change to the starting balance for a balance sheet account, because the use of the Spread Amount and Spread Type do not apply to the starting balance. The coordinator may set the account default on the Assign Planning Method Defaults page to prevent any adjustments on the Distribution Details page. |
Access the Economic Driver page (from the Line Item Details page, select ECODRV from the Method ID dropdown list box, then click the Amount link).
Default |
Displays the same default method that appears on the Line Item Details page. |
Method ID |
Displays ECODRV to override the default method. |
Base and Driver ID |
Select different values to override the defaults assigned at the coordinator level. |
Spread Type |
Select how the system applies the calculated annual amount to the budget periods. Values are: Spread Evenly or Spread Weighted. |
Growth Percentage |
Enter the annual growth rate that you want to apply to the base. The growth percentage does not apply to the starting balance of balance sheet accounts. You can use the adjustment column when it is necessary to change the starting balance. The rate is for an annual basis. The system calculates the entered growth rate against the base to determine the calculated amount for the year. |
Budget Period |
For balance sheet planning activities, the starting balance row of balance sheet accounts defaults to the amount stored in the analysis base (if available) or 0. |
Adjustment Amount |
For all rows the system displays the calculated adjustment amount based on the Spread Amount and Spread Type you selected in the Adjustment box. When working with an activity that includes balance sheet planning, you must manually enter a change to the starting balance for a balance sheet account, because the use of the Spread Amount and Spread Type do not apply to the starting balance. The coordinator may set the account default on the Assign Planning Method Defaults page to prevent any adjustments on the Economic Driver page. |
Access the Flexible Formula page (from the Line Item Details page, select FLEX from the Method ID dropdown list box, then click the Amount link).
Default |
Displays the same default method that appears on the Line Item Details page. |
Method ID |
Displays FLEX to override the default method, and select a Formula field value. |
Formula |
Select the desired flexible formula for this activity. The budget coordinator establishes the available formulas. Click the flexible formula link to view the formula details. For example, select DEPR_EXP to calculate depreciation expense. Note. For balance sheet planning activities, when formula sources find no starting balance, 0 amounts are assumed for the calculation. |
Adjustment Amount |
For all rows the system displays the calculated adjustment amount based on the Spread Amount and Spread Type you selected in the Adjustment box. When working with an activity that includes balance sheet planning, you must manually enter a change to the starting balance for a balance sheet account, because the use of the Spread Amount and Spread Type do not apply to the starting balance. The coordinator may set the account default on the Assign Planning Method Defaults page to prevent any adjustments on the Flexible Formula page. |
Access the Line Item Details page (Planning and Budgeting, Activity Preparation, My Planning Workspace then click the Edit link).
The LINEITEM method does not use a driver, driver parameter, or method base. Assign the LINEITEM method to line items in the budget to indicate that the budget amounts are calculated from another line item activity. Dimension combinations within the line item activity pick up values defined in detail within the other line item activity. The coordinator typically assigns the LINEITEM method to accounts when data is from another line item activity.
If the line item using this method is a balance sheet line item, then the system displays a starting balance row. If the source/child for this line item does not have a starting balance, then the starting balance defaults to 0. Use the Adjustment Amount field to manually override the starting balance amount.
The preparer cannot modify a method amount for a line item with the LINEITEM method. However, authorized users can apply adjustments, apply allocations, and select to hold the line item from mass adjustments. Preparers can also override the LINEITEM method assigned to a line item if the coordinator enables method overrides.
Note. When using the LINEITEM method, keep in mind this relationship requires that the source data from the child activity must come from the master version. Therefore, it may be necessary for a user to copy their budget to master in order to reflect the most current information in the parent line item activity.
Access the Itemization page (from the Line Item Details page, select ITM from the Method ID dropdown list box, then click the Amount link).
Default |
Displays the same default method that appears on the Line Item Details page. |
Method ID |
Displays ITM to override the default method. |
Driver ID |
Select from the delivered drivers for the ITM method. Values are: QTY*COST (quantity times cost): Multiplies the number of units by the cost per unit, displays the result in the Calculated Amount field, and then spreads or repeats the amount across budget periods. PERSUM (sum of periods): Enters a total value in the Calculated Amount field, and then spreads or repeats the amount across budget periods. |
Number of Units and Cost Per Unit |
Enter values if you select QTY*COST as the driver. The system uses the values to determine the calculated amount for the item. |
Calculated Amount |
Enter a constant value if you select PERSUM as the driver. |
Spread Type |
Select how the system applies the calculated amount to the budget period. Values are: Spread and Repeat. |
From Budget Period and To Budget Period |
Enter the range of the budget periods for the item. The system uses the budget period to budget the item entirely within the defined budget period range. When working with balance sheet planning activities, you create a row for starting balance for balance sheet accounts, by selecting period 0 from the dropdown lists. |
Adjustment Amount |
For all rows the system displays the calculated adjustment amount based on the Spread Amount and Spread Type you selected in the Adjustment box. When working with an activity that includes balance sheet planning, you must manually enter a change to the starting balance for a balance sheet account, because the use of the Spread Amount and Spread Type do not apply to the starting balance. The coordinator may set the account default on the Assign Planning Method Defaults page to prevent any adjustments on the Itemization page. |
Access the AMTUNT x UNTAMT page (from the Line Item Details page, select JOIN from the Method ID dropdown list box, then click the Amount link).
Default |
Displays the same default method that appears on the Line Item Details page. |
Method ID |
Displays JOIN to override the default method. |
Driver ID |
Select a different driver to override the default assigned at the coordinator level. |
Number of Units and Cost Per Unit |
Enter or override values for any of the budget periods. When working with balance sheet planning activities, the balance sheet accounts have a starting balance row which defaults to 0 for cost per unit and number of units. You may override the value if allowed by coordinator. The system multiplies this amount to determine the calculated method amount for a budget period. |
Adjustment Amount |
For all rows the system displays the calculated adjustment amount based on the Spread Amount and Spread Type you selected in the Adjustment box. When working with an activity that includes balance sheet planning, you must manually enter a change to the starting balance for a balance sheet account, because the use of the Spread Amount and Spread Type do not apply to the starting balance. The coordinator may set the account default on the Assign Planning Method Defaults page to prevent any adjustments on the Amtunt x Untamt page. |
Access the Line Item Details page (Planning and Budgeting, Activity Preparation, My Planning Workspace then click the Edit link).
The METH=0 method does not use a driver, driver parameter, or method base. Because you cannot delete existing, detailed line item rows, assign the METH=0 method to a line item to indicate that the budget amount is 0. The method amount for a line item using METH=0 has a 0 value. Apply adjustments, allocations, and then select to hold the line item from mass adjustments. If the budget includes line items assigned the METH=0 method, preparers can override the method if the coordinator enables method overrides.
For balance sheet accounts, the system displays a row for the starting balance, which defaults to 0. Use the Adjustment Amount field to manually override the starting balance default, unless the account default, as defined in the Assign Planning Method Defaults page, does not permit adjustments.
Access the Percent Per Period page (from the Line Item Details page, select PER% from the Method ID dropdown list box, then click the Amount link).
Default |
Displays the same default method that appears on the Line Item Details page. |
Method ID |
Displays PER% to override the default method. |
Base |
Select the base value to which the method is applied. |
Budget Period Details |
When working with a balance sheet planning activity, the starting balance row of balance sheet accounts defaults to the amount stored in the analysis base (if available) or 0. |
Percentage |
Enter the growth rate to calculate the amount for each budget period that you defined in the planning model. The growth rate cannot be applied to the starting balance row of a balance sheet account. You can make a manual change using the adjustment option for the starting balance (period 0). |
Adjustment Amount |
For all rows the system displays the calculated adjustment amount based on the Spread Amount and Spread Type you selected in the Adjustment box. When working with an activity that includes balance sheet planning, you must manually enter a change to the starting balance for a balance sheet account, because the use of the Spread Amount and Spread Type do not apply to the starting balance. The coordinator may set the account default on the Assign Planning Method Defaults page to prevent any adjustments on the Percent Per Period page. |
Access the Line Item Details page (Planning and Budgeting, Activity Preparation, My Planning Workspace then click the Edit link).
The POSBUD method does not use a driver, driver parameter, or method base. Assign the POSBUD method to line items in the budget to indicate that the budget amounts are calculated from position budgeting data. The coordinator typically assigns the POSBUD method to all personnel accounts (salary, earnings, and benefits accounts). The preparer cannot modify a method amount for a line item with the POSBUD method. However, authorized users can apply adjustments, apply allocations, and select to hold the line item from mass adjustments. Preparers can override the POSBUD method assigned to a line item on the Line Item Details page if the coordinator enables method overrides.
There is no starting balance available for this type of method, since POSBUD only supports expense planning.
Note. If your organization does not use position budgeting, the coordinator can disable the POSBUD method to make it unavailable.
Access the Related Account / Statistics Code page (from the Line Item Details page, select RELATE from the Method ID dropdown list box, then click the Amount link).
If overrides are allowed for the driver parameter, changes to the Account/Statistics Code column and the Value Type column can affect the calculated amount.
An override option set by coordinator lets you select a different driver ID to associate with another account predefined by the budget coordinator. When override is enabled for the driver, selecting a different driver can change the lookup ID and account or statistics code to the code that the coordinator defined for the driver.
Default |
Displays the same default method that appears on the Line Item Details page. |
Method ID |
Displays RELATE to override the default method. |
Driver ID |
Select a different driver to override the default assigned at the coordinator level. |
Account |
Select if the driver is associated with a monetary account, which is then tied to an amount. The coordinator must include these monetary accounts in the dimension details for the planning model. Alternatively, you can associate the driver with a statistical account, which is then tied to a rate. The coordinator must include these statistical accounts in the dimension details for the planning model. For the starting balance row of balance sheet accounts, the Account defaults in from the associated driver. |
Statistics Code |
Select if the driver is associated with a statistical code. The system adds together all rows associated with this statistical code to apply the defined rate. The coordinator must include these statistical codes in dimension details to be included in the model. For the starting balance row of balance sheet accounts, the Statistics Code defaults in from the associated driver.
Note. If the related account or statistical code row does
not exist, you may need to add the budget line item. |
Percent or Amount Values |
Enter a percentage and an account code to which you want to apply the percentage. The percentage is a percentage of the related account value; it is not a growth rate applied to the account. Enter an amount or rate and an account or statistical code to which you want to apply the rate. The amount is multiplied by the related account or statistical code value. The formulas for this method are as follows: (Related account) x (Percentage) = (Method amount) or (Related statistical code) x (Amount) = (Method amount) |
Account/Statistics Code |
Enter a code to locate and calculate the method amount for this line item against an account or statistical code. |
Basis and Value Type |
Displays the budget period total of the source amount and the value type if an amount or percentage is applied against the source. |
Value |
Enter a value to express the calculation against the related account or statistics code indicated by the basis. When working with a balance sheet planning activity, the starting balance row of balance sheet accounts, the Value field defaults to 0 . |
Adjustment Amount |
For all rows the system displays the calculated adjustment amount based on the Spread Amount and Spread Type you selected in the Adjustment box. When working with an activity that includes balance sheet planning, you must manually enter a change to the starting balance for a balance sheet account, because the use of the Spread Amount and Spread Type do not apply to the starting balance. The coordinator may set the account default on the Assign Planning Method Defaults page to prevent any adjustments on the Related Account/Statistics page. |
Access the Units x Defined Amount page (from the Line Item Details page, select UNTAMT from the Method ID dropdown list box, then click the Amount link).
Default |
Displays the same default method that appears on the Line Item Details page. |
Method ID |
Displays UNTAMT to override the default method. |
Driver ID |
Select a different driver to override the default assigned at the coordinator level. |
Number of Units and Cost Per Unit |
Enter the number of units that you want to budget based on the driver (cost per unit). The system multiplies this value by the cost per unit to determine the method amount for each budget period. The coordinator defines the default cost per unit. When working with a balance sheet planning activity, the starting balance for balance sheet accounts defaults to 0 for Number of Units and Cost Per Unit. You can override the defaults if override is allowed. |
Adjustment Amount |
For all rows the system displays the calculated adjustment amount based on the Spread Amount and Spread Type you selected in the Adjustment box. When working with an activity that includes balance sheet planning, you must manually enter a change to the starting balance for a balance sheet account, because the use of the Spread Amount and Spread Type do not apply to the starting balance. The coordinator may set the account default on the Assign Planning Method Defaults page to prevent any adjustments on the Units x Defined Amount page. |
In addition to using the methods, you can apply incremental adjustments to single line item budgets, as well as update multiple rows at a time when granted access to mass adjustments. With mass adjustments, apply amount or percentage changes to multiple line item budgets at once. Apply adjustments to line items that span multiple planning centers. Use adjustments in any role— preparer, reviewer, analyst, or coordinator—but the range of line item budgets that you can access depends on your user ID security access. You must also be authorized to perform the Mass Adjustment activity.
See Also
Using Line Item Mass Adjustments
This section gives an overview of Spreadsheet Add-In (SSAI) functionality and discusses how to:
Access spreadsheets for data entry.
Review a spreadsheet example.
The Planning and Budgeting SSAI functionality enables you to retrieve and update budgeting and planning models using Microsoft Excel, instead of logging into the PeopleSoft Planning and Budgeting application. SSAI is a spreadsheet workbook that consists of a set of worksheets you use to retrieve and update budgeting and planning models.
The workbooks contain the following worksheets:
Coversheet: Describes the sheets in the workbook, and describes the functionality available in each worksheet.
Connect Information: Contains the connect information for communicating with a PeopleSoft server, such as the Web Server machine name, protocol, and PeopleSoft site name. The system uses this data to access the server and load budgeting data into the worksheets.
Search Criteria: Defines the budgeting data the system retrieves based on the selected search criteria. You can filter data based on business units, planning models, activity, scenario, planning centers, and budget versions.
Edit & Submit: (edit and submit) Contains the budgeting data the system retrieves, and also contains functionality to save the planning model and submit the model for approval. Note that you can only update and save AMTPER values.
Important! To use the SSAI functionality, you must first
install the Planning and Budgeting Spreadsheet Add-In program Excel file, ExcelToCI-BP.xls. This
spreadsheet can be available on all user machines that will use the Spreadsheet
Add-In Program to work with the PeopleSoft Planning and Budgeting application.
Alternatively, you can access SSAI from a network drive as well as from a
local drive, which will not require every machine to have the program.
For installation information, see the EPM 9.1 Installation
Guide, posted on My Oracle Support.
To use a spreadsheet:
Access the SSAI functionality, which opens a workbook.
Select values for each search criteria field on the Search criteria worksheet: business unit, planning model ID, activity, scenario, planning center, and budget version ID.
Click the Find Rows button in the Search Criteria sheet. This retrieves the budget model data into the Edit & Submit sheet.
The system locks the planning center to prevent data integrity errors after it retrieves the data.
Note. If a user attempts to check out a planning center in SSAI that is checked out (write-locked) by another user in SSAI or Planning and Budgeting, it is accessible in read-only mode in SSAI. The system displays a message that the model is locked and in read-only mode. The Save, Submit, Unlock, Add Private Note, and Add Public Note actions on the Edit and Submit worksheet are not available in read-only mode.
Modify line items.
Note. You can only enter data for line items that use the AMTPER method.
You can save your work as an .xls file. To reopen the .xls file, select the Microsoft Excel File, Open command.
Click the Unlock button in the Edit & Submitsheet to unlock the planning center. This makes it available to other users.
Click the Submit button in the Edit & Submit sheet to submit the budget model for approval.
Note. When you click Submit the system checks whether you have full access to the planning center version. If you have only partial access, the system displays an error message indicating that you need access to all line items in a planning center in order to submit it.
The following is an example of what data can look like once downloaded to a spreadsheet. The system validates the amounts you enter. You can only enter numbers, up to a maximum of fifteen (15) digits of precision; these are Microsoft Excel limitations. The functionality supports a maximum number of four (4) decimal digits. However, if a currency has a defined number of decimal digits of less than four digits (for example, two (2) digits), the system rounds the values to two digits when you save the worksheet.
Note. You can copy and paste data into a locked spreadsheet; however, you must ensure that the correct data is pasted into the correct cells. For locked spreadsheets, Microsoft Excel does not validate the data for you.
Connect Information Worksheet
Use the Connect Information worksheet to review connection information.
Use the Search criteria worksheet to specify the search parameters of the data for download.
The selected business unit value determines the available values of the remaining search criteria fields. Specify values starting with the Business Unit field, and continuing, in field order, to the right until you have selected all values.
Use the Copy to Master button to copy working activity data into the master version. Copying working data to the master can be useful when you need to quickly update the master version with new data or are using the recalculation process (the Model Recalculation Application Engine: BP_MDL_CALC) to recalculate flexible formula amounts across planning centers and activities. flex formula amounts across planning centers and activities
Use the Edit & Submit worksheet to edit the data and submit the budget for approval. Only one user at a time can edit the spreadsheet; all other concurrent users can access it in read-only mode.
The following information describes elements of the spreadsheet and how the spreadsheet functions:
Heading Information |
Displays locked details including business unit, model name, activity, scenario, planning center, and version ID. |
Method ID |
Displays the method ID for this line item data. You can only edit line item budget amounts that have the AMTPER (amount per period) method assigned to it. When working with forecast planning (scenario) types, there may be closed periods you cannot enter data for. You may only update periods that allow update, as defined by the first period to update by the coordinator on the data source page. |
Dimensions |
Displays all dimensions associated with the planning model. However, the system does not display those dimensions not applicable to the selected model. These dimensions contain both a code column and a description column. You should not delete these columns, but you can hide them to condense your view. To hide a column, go to the menu item Tools, Protection, and select Unprotect Sheet; then go to the menu item Format, Column, and select Hide. Note. You cannot use the hide option when the spreadsheet is protected. However, when updating budget data in preparation for submission, you should not use the unprotect option. Keeping the sheet protected prevents data entry into cells that should not be modified. If you require the unprotect option, it is recommended you use it after you have completed your data entry. |
Enter Note |
Use this column to enter text for a line item row. This column is hidden if user has read-only access. |
All Notes |
Displays all the public and private notes for a specific line item. This column is always read-only. You cannot delete or edit notes after you append them to the All Notes log. However, private notes are viewable only by the user who created them. |
Add Public Note |
Click to append the current note text as a public note to the notes log. You may add multiple notes at a time. |
Add Private Note |
Click to append the current note text as a private note to the notes log. You may add multiple notes at a time. |
Save |
Click to save edits you made to AMTPER line item activity data. You can enter amounts and notes only for line item rows with the AMTPER method; all other methods are read-only rows. You will receive the following confirmation message when you successfully save your data: Modified data is saved in the Server successfully. |
Unlock |
Click to unlock the planning center when you have finished, and enable other users to edit the data. You will receive the following confirmation message when you have successfully unlocked the planning center: The locked model is released successfully. |
Release |
Click to release a view-only lock of the planning center when you have finished. |
Submit for Approval |
Click to submit the planning center for approval. You will receive the following warning message if you click the Submit for Approval button without first saving any new data: You have unsaved data in this sheet. Click OK to go back and save. Click Cancel to ignore the changes and continue. You will receive the following confirmation message when the data has been successfully submitted: The model is submitted successfully. |
The page elements, Save, Unlock, Submit for Approval, Add Public Note, and Add Private Note, are unavailable when the spreadsheet is in read-only mode. These page elements are also unavailable after you submit the spreadsheet for approval.
When you are working with line item budgets in the spreadsheet format, consider the following:
You can check out (lock) only one activity to one Microsoft Excel workbook.
The stage changes process cannot distinguish which sheet to check in if more than one checkout exists within the workbook.
The system displays the login dialog on the Login/Refresh button on the Search Criteria worksheet. Use this feature to change the user in SSAI. Note that the specified SSAI user determines the available business unit, planning model ID, activity, scenario, and planning center values on the Search Criteria page.
The system displays status and errors in the status column as a balloon popup, on the Edit & Submit worksheet.
When you define user preferences for a specific user, the system uses these preferences to populate the Search Criteria fields (as applicable) when that user logs in.
Both the Search Criteria worksheet and the Edit & Submit worksheet display toolbars, each with their respective actions.
You can view the same data and any changes you make to it from either the Line Item grid page or from the Excel spreadsheet add-in page.
The spreadsheet feature is intended for preparers and casual preparer roles for budgeting.
Any locks made from the spreadsheet interface can be released by the same user from the My Planning Workspace.
This section provides an overview of importing line items and discusses how to run the Budget Data Load Import process.
The Budget Data Load Import process enables you to import multiple AMTPER method line items at one time. This process imports line item data from a CSV file into the specified business unit, planning model, scenario, activity, planning center, and budget version. Target line items must have the method AMTPER (Amount Per Period) or, for new line items, allow the AMTPER method to be assigned. Keep the following considerations in mind when using this process:
All locks to the model need to be released prior to running the engine and the model must be in the Released state.
Only method amounts are updated (adjustment and allocation amounts are not updated).
Target line items must have the method AMTPER (Amount Per Period) or, for new line items, allow the AMTPER method to be assigned.
For forecast scenarios, the system validates the first period to update and first year to update.
Any line items that have been manually deleted after the model was released will be reintroduced by the import process if the combination exists in the input CSV file.
Locking is not performed by this process.
The system does not prevent multiple concurrent processes from writing data to the same Planning Center; if you are processing multiple import files for the same Planning Center, you should run them sequentially.
After the import process is complete, you must run the Model Recalculation process to synchronize the model data.
CSV File Requirements
The CSV file must meet the following requirements:
The first row of the CSV file must be a header row that names the ChartFields, then the budget periods to be loaded, in order.
The ChartField names must exactly match those specified in the activity definition for the model; and all of the model's selected activity dimensions, including CURRENCY_CD must be included in the header row.
Each ChartField member in the CSV file must already exist in Planning and Budgeting.
Budget period amounts should not contain currency symbols nor commas.
If the value for a budget period is zero, you must enter the number zero as a blank value will generate errors.
Validations
During the import process, the system checks that the data in the CSV file meets various requirements for Planning and Budgeting, such as ChartField combinations, for example. Only rows that pass the requirements are imported. You can view the details for rows that do not import by viewing the Budget Data Load Error Report page.
The method ID default will be updated for ChartField combinations provided in the CSV file. The method ID will be updated to AMTPER if the method override flag is enabled.
Page Name |
Definition Name |
Navigation |
Usage |
Budget Data Load run control |
BP_FILE_UPLD |
Planning and Budgeting, Planning and Budgeting Setup, Process Model, Budget Data Load |
Run the Budget Data Load process. |
Budget Data Load Error Report |
BP_LIIMPT_ERR |
Planning and Budgeting, Planning and Budgeting Setup, Process Model, Budget Data Load Error Report |
Review budget data load errors. |
Access the Budget Data Load run control page (Planning and Budgeting, Planning and Budgeting Setup, Process Model, Budget Data Load).
Specify the Business Unit, Planning Model ID, Scenario, Activity, Planning Center and Budget Version that you are importing data to.
Add |
Click to specify the CSV file to import. A modal window appears where you can either enter the filename or click Browse to select the file. Click Upload to use the file. |
View |
Click to view the source file. |
Delete |
Click to clear the filename from the Source File field. |
Run |
Click to run the process. |
To review a report that contains information on any errors encountered during the import process, access the Budget Data Load Error Report (Planning and Budgeting, Planning and Budgeting Setup, Process Model, Budget Data Load Error Report).
Use the My Planning Workspace: My Preparation Workspace to submit line item budgets to the next planning center level. When you submit a budget version, the system sends it up to the next planning center level and updates the master budget version with data from the submitted version. The master version contains the most current budget submissions. You may submit more than planning center at a time, but the system prevents you from submitting more than one version per planning center.
If defined, validation occurs for three types of rules:
Verifies no rows marked in error due to commitment control validation.
Verifies no rows marked in error due to combination edit validation.
Verifies totals are within planning targets rules.
Any of these rules can be applied. When these rules are applied against the activity scenario in a planning model, validation occurs during submission. Prior to working on your line items, the staging process would have marked any rows in error if they did not pass combination edit or commitment control validation when used and enforced for a line item activity. All rows marked in error must be corrected or deleted prior to submission.
For planning targets, you must access the Planning Targets page to review where your amounts are not within the rules defined for targets, and make any necessary adjustments within your line item entry grid. Submission is not allowed if the validation fails the criteria defined for any one of these rules when active control is applied for the user role.
See Also
Submitting and Rejecting Plans and Budgets