JavaScript is required to for searching.
Skip Navigation Links
Exit Print View
Netra SPARC T5-1B Server Module HTML Document Collection
Oracle Technology Network
Library
PDF
Print View
Feedback
search filter icon
search icon

Document Information

Using This Documentation

Installation

Understanding the Server Module

Installation Task Overview

Server Module Overview

Front and Rear Panel Components

Confirming Specifications

Physical Specifications

Electrical Specifications

Environmental Specifications

Preparing for Installation

Shipping Kit

Handling Precautions

ESD Precautions

Tools Needed for Installation

Plan Communication With the Server Module During Installation

Dongle Cables

Installing the Server Module

Prepare the Modular System and Server Module

Install Optional Components

Insert the Server Module Into the Chassis

Powering On the Server Module for the First Time

Powering On the Host for the First Time

Power On the Host Through the CMM (Web Interface)

Power On the Host Through the CMM (CLI)

Power On the Host Through the Front Panel (CLI)

Power On the Host Through the CMM SER MGT Port (CLI)

Installing the OS

Configure the Preinstalled OS

Oracle Solaris Configuration Parameters

Reach a State to Install a Fresh OS (Oracle ILOM Web Interface)

Reach a State to Install a Fresh OS (Oracle ILOM CLI)

Assign a Static IP Address to the SP

Administration

Service

Glossary

Index

Prepare the Modular System and Server Module

You must install and configure the Sun Netra 6000 modular system (chassis) before installing the server module.

  1. Ensure that the modular system is installed and functional.

    Satisfying the following conditions ensures a straightforward installation of the server module:

    1. Install the modular system into its intended rack before installing server modules.
    2. If you plan to manage the server modules through the modular system CMM, configure the CMM to run in your network.
    3. Ensure that the modular system chassis is powered on and running.
    4. Ensure that the modular system is running the latest version of CMM Oracle ILOM firmware.

      Note -  For more information about preparing the modular system and CMM Oracle ILOM, refer to the Sun Netra 6000 Modular System Installation Guide.
  2. Unpackage the server module.

    Be ready to insert the server module within 60 seconds of removing the filler panel.

  3. Install any optional components.

    See Install Optional Components.

Related Information