JavaScript is required to for searching.
Skip Navigation Links
Exit Print View
Sun Blade X4-2B Installation Guide
Oracle Technology Network
Library
PDF
Print View
Feedback
search filter icon
search icon

Document Information

Using This Documentation

Product Description

Installing the Server Module

1. Review Product Documentation

Sun Blade 6000 Modular System Documentation Library

Chassis NEMs

Related Information

Sun Blade X4-2B Documentation Library

2. Receive and Unpack the Server Module

Inventory Shipping Kit

Related Information

ESD and Safety Precautions

Related Information

Install Optional Components

USB Stick

Related Information

Verify Supported Components

Prepare the Site and Chassis

3. Insert the Server Module Into a Chassis

Insert the Sun Blade X4-2B Server Module Into a Chassis

4. Access Server Module Management Tools

Connection Option Summary

Set Up Server Module Remote Using Ethernet Network Connection

Set Up Server Module Using Local Serial Connection

Set Up Server Module Using Local KVM Connection

Accessing Oracle ILOM

Determining Server Module Oracle ILOM SP IP Address

Display Server Module Oracle ILOM SP IP Address (Web Interface)

Display Server Module Oracle ILOM SP IP Address (CLI)

Access Server Module SP Oracle ILOM

Log In to Oracle ILOM SP (Web Interface)

Log In to Oracle ILOM SP (CLI)

Accessing the Host Console

Access Host Console (CLI)

Access Remote Host Console

5. Set up Server Module Software and Firmware (Oracle System Assistant)

Accessing Oracle System Assistant

Launch Oracle System Assistant (Oracle ILOM)

Launch Oracle System Assistant (Locally)

Set Up Software and Firmware (Oracle System Assistant)

6. Configure Server Module Drives for OS Installation

Identifying REM Host Bus Adapters

SG-SAS6-R-REM-Z Host Bus Adapter

Configuring Storage Drives: SG-SAS6-R-REM-Z (Oracle System Assistant)

SG-SAS6-REM-Z Host Bus Adapter

Configure Storage Drives SG-SAS6-REM-Z (Oracle System Assistant)

Configure Storage Drives (LSI Configuration Utilities)

Configure Storage Drives (LSI WebBIOS Configuration Utility)

Set RAID Volume (Virtual Drive) as Bootable SG-SAS6-R-REM-Z HBA (LSI WebBIOS Utility)

Create a RAID Volume using LSI SAS 2 BIOS Configuration Utility

7. Set Up an Operating System and Drivers

Install OS or Drivers

Configuring Preinstalled Oracle Solaris OS

Configuring Preinstalled Oracle VM Software

Configuring Preinstalled Oracle Linux OS

Getting Server Firmware and Software Updates

Controlling System Power

Troubleshooting Installation Issues

Index

Insert the Sun Blade X4-2B Server Module Into a Chassis

  1. Locate a blank blade slot in the Sun Blade 6000 modular system chassis.

    http://www.oracle.com/goto/SB6000/docs

  2. Remove a slot filler panel.
    1. Pinch together the ends of the ejector arm handle to unlock the slot filler panel.
    2. Rotate the lever out to the open position.
    3. Eject the filler panel.
    4. Keep the filler panel for later use.

    Caution - Chassis shutdown hazard. Do not operate the chassis with empty slots for more than 60 seconds. Always insert a filler panel into an empty slot. If you are not installing a server module into a slot, do not remove a slot filler panel. The slot filler panel is required to meet FCC standards for electromagnetic interference (EMI).


  3. Remove the rear cover from the server module rear panel midplane connector.

    See Rear Panel Features for the location of the rear cover.

    The following illustration shows rear panel features on the Sun Blade X4-2B.


    image:Illustrations showing the rear of the server module
    Figure Legend
    1
    Power connector
    2
    I/O Connector
    3
    Rear cover (remove)
    4
    USB internal ports 0, 1

    Caution - Drop hazard - Server modules can weigh up to 20 lbs (10kg). Use two hands to install or remove the server module from the chassis.


  4. Open both of the server module ejector levers.

    Position the server module vertically so that the ejectors are on the right.

  5. Install the server module as follows:
    1. Push the server module into the slot until the server module stops and is flush with the chassis (see 1).
    2. Lock the server module into the chassis. Rotate the top ejector down while rotating the bottom ejector up until they both latch into place (see 2).
      image:Install a server module into a powered-on chassis

      The server module is now locked in the chassis. After you install a server module into a powered-on chassis, the server module SP automatically boots using standby power from the chassis power supplies.

  6. Verify server module status indicator LED activity.

    Verify that the server module front panel indicators illuminate after plugging in the server module:

    1. All four server module status indicators blink three times.

      The blade has been powered on and the SP boot process has begun.

    2. The green OK/Power status indicator blinks rapidly (0.125 seconds on, 0.125 seconds off) while the SP is booting.
    3. The green OK/Power status indicator blinks briefly once every 3 seconds.

      The server module is in standby power mode after the SP completes its boot cycle.


      image:server module front panel LEDs

      1
      Locate status indicator LED (white). Press button to identify server.
      2
      Ready to Remove status indicator LED (blue). Main power removed.
      3
      Service Action Required status indicator LED (amber). A fault condition has occurred.
      4
      OK/Power status indicator LED (green). Modes:
      • SP booting - Fast blink, 0.125 second on, 0.125 second off.

      • Standby power – Blink, 0.1 second on, 2.9 seconds off.

      • Host booting – Slow blink, 0.5 second on, 0.5 second off.

      • Full power – Steady on.

      5
      Power button. Press briefly to toggle the server between standby and full power.

      Caution - Pressing the Power button for more than four seconds when the server module is in full power initiates immediate shutdown to standby power. Can cause data loss.


    4. (Optional LED lamp test) Press and hold the Locate LED until all the front panel LEDs light up. The lamps remain lit for 15-20 seconds.

      Refer to the Sun Blade X4-2B Service Manual .


    Tip -

    For more front panel information, see Front Panel Features. For additional information about server module indicators, LED lamp test, server module removal, power procedures, and front panel cable connections, refer to the Sun Blade X4-2B Service Manual .


Next Steps