This chapter contains the topic:
From Shop Floor Control (G31), choose Daily Order Preparation
From Daily Order Preparation - Discrete (G3111), choose Order Processing
After you run MPS Regeneration or MPS Net Change, use Order Processing to process multiple work orders. The program:
Attaches the parts list
Attaches the routing instructions
Sets an initial order status
Generates the shop packet, including:
Parts list
Routing instructions
Shop packet summary
Component shortages
Verify that work orders have been entered manually or have been processed using the MPS Planning Messages program. See Section 47.1, "Generating Supplier Schedules."