32/32
Index
A B C D E F G I L M N O P Q R S T U V W Z
A
- A7.3
-
- Engineering Change Orders
-
- linking a work order to an ECO, 14.2.1
- locating ECO information, 15.2
- Locating ECO Information, 8.2
- order-specific approval routings, 13.4
- revision levels, overview, 12.3
- updating component revision levels, 14.4.1
- updating drawing revision levels, 14.4.1
- updating revision levels, 16.3
- About Work Centers, 5.5, 5.5.1
- Approval audit
-
- ECOs, 15.2
- Approval routing master, 13.4
- Approving ECOs, 16.1, 16.1
B
- basic item information, 3.2
- Bill comparison report, 8.7.7
- Bill of material
-
- printing, 8.7
- Bill of Material Revisions - Z File program (P3002Z), 7
- Bills of material
-
- changing in groups, 7.7
- comparing, 8.4
- review, 8.1
- reviewing, 8.3
- updating, 16.3
- Bills of Material
-
- configurations, 5.3.3
- features, 5.3.6
- indented, 5.3.7.1, 5.3.7.2
- modular, 5.3.1.2
- overview, 5.3
- relationships, 5.3.7
- super, 5.3.1.1
- verifying, 7.8
- Branch/plant information
-
- assigning an item to a branch plant, 4.2
- entering branch/plant information, 4.1
- item locations
-
- changing primary locations, 4.3
- deleting primary locations, 4.3.1
- effects on quantities, 4.3.1
- form, 4.3
- item manufacturing information
-
- DRP/MPS/MRP, 4.4.1, 4.4.1
- engineering, 4.4.1
- form, 4.4.1, 4.4.1
- overview, 4.1
- working with item locations, 4.3
- Branch/plant information form, 4.1.1
C
- Change with a parts list
-
- defining, 14.4
- Changing
-
- bills of material in groups, 7.7
- Changing multiple bills of material, 7.7
- Checking low level codes, 7.8
- Classification Codes form
-
- sample, 3.5
- Classification Codes program (P41011), 3.5
- Comparing bills of material, 8.4
- Component locators
-
- working with bills of material, 7.5
- Component scrap
-
- updating, 10.5
- Components
-
- working with bills of material, 7.2
- Costing and accounting information
-
- entering
-
- work centers, 9.2
- Cumulative
-
- lead times, A.1.5
D
- Default Units of Measure form
-
- sample, 3.6
- Default Units of Measure program (P41012), 3.6
- Defining
-
- change with a parts list, 14.4
- details, 14.6
- Defining the change with a parts list, 14.4
- Defining the routing, 14.3
- Details
-
- defining, 14.6
- Discrete manufacturing
-
- setting up, 6
- setting up manufacturing constants, 6.2
- Discrete manufacturing overview, 5.2
E
- ECO
-
- changes, 12.2.5
- definition, 12.2.1
- existing disposition codes defined, 13.2
- phase in codes defined, 13.2
- priority codes defined, 13.2
- process, 12.2.4
- reason codes defined, 13.2
- revision levels defined, 13.2
- setting up, 13.1
- status codes defined, 13.2
- type codes defined, 13.2
- ECO Parts List - Z File program (P3013Z), 14.4
- ECO reviewers
-
- assigning to groups, 13.4.2
- setting up, 13.4
- ECO Work Order Entry - Z File (P48020Z) program, 14.2
- ECOs
-
- approval audit, 15.2
- approving, 16.1
- entering, 14.2
- open tasks, 15.2
- printing open, 15.4.3
- reviewing, 15.1
- Engineering Change Management
-
- objectives, 12.1
- Engineering Change Population program, 16.3
- Entering
-
- ECOs, 14.2
- outside operations, 10.3
- Entering a work center, 9.1, 9.1
- Entering Basic Item Information, 3.2
- Entering costing and accounting information, 9.2
- ERPx
-
- overview, 1.2.1
F
- Features
-
- bills of material, 5.3.6
- routings, 5.6.1
- work centers, 5.5
- Forms
-
- Bill Comparison, 8.4
- Classification Codes, 3.5
- Default Units of Measure, 3.6
- Item Alternative Description, 3.2.1
- Item Branch/Plant Information, 4.1.1
- Item Master Information, 3.1.1
- Item Units of Measure, 3.6
- Item/Location Information, 4.3
- Manufacturing Values Entry, 3.7
- Plant Manufacturing Data, 4.4.1, 4.4.1
- Primary Location, 4.3
- Text Messages, 3.3.1
- Future bill inquiry form (P30210), 15.3
G
- Generating
-
- work with lead times, 11.3
- Generating lead times, 11.3
I
- Importing Mass Data, 7, 9.1, 9.2, 10.2, 14.2, 14.4, C
- Integrity Analysis Report, 7.8
- Item Alternative Description form
-
- sample, 3.2.1
- Item Alternative Description program (P41016W), 3.2.1
- Item Branch/Plant Information form
-
- sample, 4.1.1
- Item Branch/Plant Information program (P41026), 4.1.1
- Item Master information
-
- assigning item responsibility, 3.4
- classification codes
-
- inventory, 3.5
- purchasing, 3.5
- sales, 3.5
- warehouse, 3.5
- deleting, 3.1.1
- entering grade and potency information, 3.8
- entering item classification codes, 3.5
- entering item manufacturing information, 3.7
- entering Item Master information, 3.1
- entering item text
-
- form, 3.3
- form, 3.2
- grade and potency information
-
- for lots, 3.8.1
- for sales, 3.8.1
- item descriptions
-
- form, 3.2.1
- item identifiers, 3.2.1
- item processing information, 3.2.1
- item text
-
- form, 3.3
- manufacturing information
-
- form, 3.7
- requirements planning, 3.7
- overview, 3.1
- setting up a template, 3.1.1
- units of measure information
-
- conversions, 3.6
- form, 3.6
- Item Master Information
-
- entering item units of measure information, 3.6
- Item Master Information form
-
- sample, 3.1.1
- Item Master Information program (P4101), 3.1.1
- Item Units of Measure form
-
- sample, 3.6
- Item Units of Measure program (P41002), 3.6
- Item/Location Information form
-
- sample, 4.3
- Item/Location Information program (P41024), 4.3
L
- Lead times
-
- cumulative, A.1.5
- level, A.1.3
- manufacturing, A.1.6
- per unit, A.1.4
- purchased parts, A.1.7
- queue/move hours, A.1.1
- setup hours, A.1.2
- Level
-
- lead times, A.1.3
- Locating bills of material, 8.3
- Locating ECO information, 8.2, 8.2, 15.2
- Low level codes
-
- updating, 7.8
M
- Manufacturing
-
- lead times, A.1.6
- Manufacturing Values Entry form
-
- sample, 3.7
- Manufacturing Values Entry program (P41013), 3.7
- Manufacturing Z file processing programs, C
- Master Routings, 5.6.2
- Menu flow, 1.3
N
- Next numbers, 13.3
- Notifying
-
- reviewers, 14.7
O
- Objectives, 5.1
- Open tasks
-
- ECOs, 15.2
- Outside operations
-
- entering, 10.3
- Overview
-
- ERPx, 1.2.1
- routings, 10.1
- work with ECOs, 14
- Overviews
-
- discrete manufacturing, 5.2
- routings, 5.6
- work centers, 5.6
P
- Pending orders, 14.5
- Per unit
-
- lead times, A.1.4
- Planning bill and kit information
-
- working with bills of material, 7.3
- Plant Manufacturing Data form
-
- sample, 4.4.1, 4.4.1
- Plant Manufacturing Data program (P41027), 4.4.1, 4.4.1
- Primary Location form
-
- sample, 4.3
- Primary Location program (P41021W), 4.3
- Printing
-
- bill of material, 8.7
- open ECOs, 15.4.3
- Single/Multi-Level Bill Report, 8.7.1
- Where Used Item Report, 8.7.5
- Printing bill of material information, 8.7
- Printing details
-
- ECOs, 15.4.1
- Printing ECO information, 15.4
- Processing options
-
- P30415, 8.7.3
- Production information
-
- working with bills of material, 7.4
- Programs and IDs
-
- P0016 (text messages), 3.3.1
- P30420, 8.7.5
- P30510, 16.3
- P30520, 7.7
- P30601, 7.8
- P41002 (item units of measure), 3.6
- P4101 (item master information), 3.1.1
- P41011 (classification codes), 3.5
- P41012 (default units of measure), 3.6
- P41013 (manufacturing values entry), 3.7
- P41016W (item alternative description), 3.2.1
- P41021W (primary location), 4.3
- P41024 (item/location information), 4.3
- P41026 (item branch/plant information), 4.1.1
- P41027 (plant manufacturing data), 4.4.1, 4.4.1
- Purchase parts
-
- lead times, A.1.7
Q
- Queue/move hours
-
- lead times, A.1.1
R
- Related Items List Window - Z File program (P30131Z), 14.4
- Reports
-
- bill comparison, 8.7.7
- Integrity Analysis, 7.8
- single/multi-level bill, 8.7.1
- where used item, 8.7.5
- Review
-
- bills of material, 8.1
- Reviewers
-
- notifying, 14.7
- Reviewing
-
- bills of material, 8.3
- ECOs, 15.1
- working with lead times, 11.2
- Reviewing bills of material, 8.1
- Reviewing ECOs, 15.1
- Reviewing Future Bills of Material, 15.3
- Reviewing lead times, 11.2
- Reviewing operations
-
- by work centers, 9.3
- Reviewing operations by work center, 9.3
- Reviewing routing information, 10.6
- Reviewing trial balances by company, 7.1, 8.3, 9.1, 10, 10.2
- Revision levels
-
- locating ECO information, 8.2
- Overview for ECOs, 12.3
- Routing
-
- defining, 14.3
- overview, 10.1
- reviewing information, 10.6
- Routing Master Revisions - Z File program (P3003Z), 10.2
- Routings
-
- alternate operations, 5.6.4
- features, 5.6.1
- master, 5.6.2
S
- Setting up
-
- approval routing master, 13.4
- ECO reviewers, 13.4
- next numbers, 13.3
- Setting up an approval routing, 13.4
- Setting up discrete manufacturing, 6
- Setting up engineering change orders, 13.1
- Setting up next numbers for engineering change orders, 13.3
- Setup hours
-
- lead times, A.1.2
- Single/Multi-Level Bill reports, 8.7.1
T
- Text Messages form
-
- sample, 3.3.1
- Text Messages program (P0016), 3.3.1
U
- Updating
-
- bills of material, 16.3
- component scrap, 10.5
- Updating bills of material, 16.3
- Updating component scrap, 10.5
- User defined codes list
-
- Work Day Calendar, 6.6.2
V
- Verifying
-
- bills of material, 7.8
- Verifying bills of material, 7.8
- Verifying existing, 14.1
W
- What is an ECO?, 12.2.1
- Where Used Item report, 8.7.5
- Where Used Update, 7.7
- Work Center Rate Revisions Z File program (P30061Z), 9.2
- Work Center Revisions - Z File program (P3006Z), 9.1
- Work centers
-
- costing and accounting information
-
- entering, 9.2
- entering, 9.1
- features, 5.5
- reviewing operations by work center, 9.3
- working with, 9
- Work Centers
-
- overview, 5.5, 5.5.1
- Work day calendar
-
- choosing a code, 6.6.2
- Work with ECOs
-
- overview, 14
- Work with lead times, 11.1
-
- generating, 11.3
- reviewing, 11.2
- Working with bills of material, 7
-
- component locators, 7.5
- production information, 7.4
- Working with Bills of material
-
- components, 7.2
- Working with Bills of Material, 7
-
- planning bill and kit information, 7.3
- Working with component locators, 7.5
- Working with components, 7.2
- Working with ECOs, 14
- Working with generic text, 7.6, 10.4
- Working with lead times, 11.1
- Working with planning bill and kit information, 7.3
- Working with production information, 7.4
- Working with routings, 10.1
- Working with work centers, 9
Z
- Z file processing programs, 7, 9.1, 9.2, 10.2, 14.2, 14.4, C