P6 - Activity / Primavera Activity

Description: Use this subject area to analyze project, WBS, and activity level details. This subject area includes earned value metrics and percent complete metrics, planned and actual units and hours, and project baseline comparisons.

Folder

Subfolder

Field Name

Dimension/ Fact / Lookup

Description

Values Derived From / Calculated By

Project

Budget - (Project)

Current Budget

Dimension

The Current Budget is the sum of the Original Budget and all approved budget changes in the Budget Change Log.

Value Derived From : Dim_W_PROJECT_D_Project.CURRENT_BUDGET

Project

Budget - (Project)

Current Variance

Dimension

The difference between the current budget and the total spending plan. This value is not rolled up. Calculated as Current Budget minus Total Spending Plan.

Value Derived From : Dim_W_PROJECT_D_Project.CURRENT_VARIANCE

Project

Budget - (Project)

Distributed Current Budget

Dimension

The sum of all budgets that were assigned to control accounts during baseline planning. These budgets are allocated for work and planning packages. Calculated as the sum of the Current Budget values from one level lower. Not rolled up.

Value Derived From : Dim_W_PROJECT_D_Project.DISTRIBUTED_CURRENT_BUDGET

Project

Budget - (Project)

Original Budget

Dimension

The estimate of the total amount you require for the selected project, including all contributed funds.

Value Derived From : Dim_W_PROJECT_D_Project.ORIGINAL_BUDGET

Project

Budget - (Project)

Proposed Budget

Dimension

The proposed budget for the project. Calculated as Original Budget plus the sum of the Approved and Pending Budgets from the budget log.

Value Derived From : Dim_W_PROJECT_D_Project.PROPOSED_BUDGET

Project

Budget - (Project)

Total Benefit Plan

Dimension

Sum of the Monthly Benefit Plan. Not rolled up.

Value Derived From : Dim_W_PROJECT_D_Project.TOTAL_BENEFIT_PLAN

Project

Budget - (Project)

Total Benefit Plan Tally

Dimension

Sum of the Monthly Benefit Plan Tally. Not rolled up.

Value Derived From : Dim_W_PROJECT_D_Project.TOTAL_BENEFIT_PLAN_TALLY

Project

Budget - (Project)

Total Funding

Dimension

The total amount of funding contributed to the project by your funding sources.

Value Derived From : Dim_W_PROJECT_D_Project.TOTAL_FUNDING

Project

Budget - (Project)

Total Spending Plan

Dimension

Sum of the Monthly Spending Plan. Not rolled up.

Value Derived From : Dim_W_PROJECT_D_Project.TOTAL_SPENDING_PLAN

Project

Budget - (Project)

Total Spending Plan Tally

Dimension

Sum of the Monthly Spending Plan Tally. Not rolled up.

Value Derived From : Dim_W_PROJECT_D_Project.TOTAL_SPENDING_PLAN_TALLY

Project

Budget - (Project)

Unallocated Budget

Dimension

Calculated as Total Current Budget - Distributed Current Budget.

Value Derived From : Dim_W_PROJECT_D_Project.UNALLOCATED_BUDGET

Project

Budget - (Project)

Undistributed Current Variance

Dimension

Computed as the Total Spending Plan minus the Total Spending Plan Tally. Not rolled up.

Value Derived From : Dim_W_PROJECT_D_Project.UNDISTRIBUTED_CURRENT_VARIANCE

Project

Dates - (Project)

Actual Finish Date

Dimension

Actual Finish Date

Value Derived From : Dim_W_PROJECT_D_Project.ACTUAL_FINISH_DATE

Project

Dates - (Project)

Actual Start Date

Dimension

Actual Start Date

Value Derived From : Dim_W_PROJECT_D_Project.ACTUAL_START_DATE

Project

Dates - (Project)

Anticipated Finish

Dimension

Anticipated finish date of WBS, Project and EPS elements. User-entered - not dependent upon any other fields. If there are no children, the anticipated finish date will be the Finish date displayed in the columns.

Value Derived From : Dim_W_PROJECT_D_Project.ANTICIPATED_FINISH_DATE

Project

Dates - (Project)

Anticipated Start

Dimension

Anticipated start date of WBS, Project and EPS elements. User-entered - not dependent upon any other fields. If there are no children, the anticipated start date will be the Start date displayed in the columns.

Value Derived From : Dim_W_PROJECT_D_Project.ANTICIPATED_START_DATE

Project

Dates - (Project)

Baseline Finish Date

Dimension

Baseline Finish Date

Value Derived From : Dim_W_PROJECT_D_Project.BASELINE_FINISH_DATE

Project

Dates - (Project)

Baseline Start Date

Dimension

Baseline Start Date

Value Derived From : Dim_W_PROJECT_D_Project.BASELINE_START_DATE

Project

Dates - (Project)

Data Date

Dimension

The current data date for the project. The project status is up to date as of the data date. The data date is modified when project actuals are applied.

Value Derived From : Dim_W_PROJECT_D_Project.DATA_DATE

Project

Dates - (Project)

Date Added

Dimension

The date this project was added

Value Derived From : Dim_W_PROJECT_D_Project.ADD_DATE

Project

Dates - (Project)

Finish

Dimension

The current finish date of the project. For not started and in-progress projects, this is the latest early finish date from all activities in the project. For completed projects, this is the latest actual finish date derived from all activities. For projects with no activities, the Finish Date is equal to the Anticipated Finish date if one is defined. For projects with no activities and no Anticipated Finish date, the Finish Date field is blank.

Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_FINISH_DATE

Project

Dates - (Project)

Forecast Finish Date

Dimension

The end date optionally used by the project scheduler

Value Derived From : Dim_W_PROJECT_D_Project.FORECAST_FINISH_DATE

Project

Dates - (Project)

Forecast Start Date

Dimension

The start date optionally used by the project scheduler

Value Derived From : Dim_W_PROJECT_D_Project.FORECAST_START_DATE

Project

Dates - (Project)

Must Finish By

Dimension

The optional date constraint you can specify for the project end date

Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_PLANNED_FINISH_DATE

Project

Dates - (Project)

Planned Finish

Dimension

The date the project is scheduled to start

Value Derived From : Dim_W_PROJECT_D_Project.PLANNED_FINISH_DATE

Project

Dates - (Project)

Planned Start

Dimension

The date the project is scheduled to start

Value Derived From : Dim_W_PROJECT_D_Project.PLANNED_START_DATE

Project

Dates - (Project)

Scheduled Finish

Dimension

The calculated latest early finish date, which is based on the schedule most recently generated for the project.

Value Derived From : Dim_W_PROJECT_D_Project.SCHEDULED_FINISH_DATE

Project

Dates - (Project)

Start

Dimension

The current start date of the project. For a not started project, this is the project's planned start date. For a project that has started or is complete, this is the project's actual start date. For projects with no activities, the start date is equal to the anticipated start date if one is defined; if no anticipated start is defined, then the start date is equal to the project's planned start date.

Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_START_DATE

Project

Durations - (Project)

Actual Duration

Dimension

Actual duration is the total time from the project actual start date to the actual finish date (for completed projects), or to the current data date (for in-progress projects).

Value Derived From : Dim_W_PROJECT_D_Project.ACTUAL_DURATION

Project

Durations - (Project)

At Completion Duration

Dimension

The duration at completion is the total time from the project current start date to the current finish date.

Value Derived From : Dim_W_PROJECT_D_Project.AT_COMPLETION_DURATION

Project

Durations - (Project)

Baseline Project Duration

Dimension

The duration of the baseline project.

Value Derived From : Dim_W_PROJECT_D_Project.ACTUAL_DURATION

Project

Durations - (Project)

Planned Duration

Dimension

Planned duration is the total time from the project planned start date to the planned finish date.

Value Derived From : Dim_W_PROJECT_D_Project.PLANNED_DURATION

Project

Durations - (Project)

Remaining Duration

Dimension

Remaining duration is the total time from the current data date to the current finish date.

Value Derived From : Dim_W_PROJECT_D_Project.REMAINING_DURATION

Project

Durations - (Project)

Variance - Baseline Project Duration

Dimension

The duration between the baseline project duration and the current project duration. Calculated as Planned Duration minus At Completion Duration.

Value Derived From : Dim_W_PROJECT_D_Project.DURATION_VARIANCE

Project

Durations - (Project)

Variance - Baseline Project Finish Date

Dimension

Variance - Baseline Project Finish Date

Value Derived From : Dim_W_PROJECT_D_Project.FINISH_DATE_VARIANCE

Project

General - (Project)

Added By

Dimension

The name of the user who added the project

Value Derived From : Dim_W_PROJECT_D_Project.ADDED_BY_NAME

Project

General - (Project)

Datasource Id

Dimension

A unique source Id created for the Primavera data source being used. Used to identify data sources when using multiple Primavera data sources.

Value Derived From : Dim_W_PROJECT_D_Project.DATASOURCE_ID

Project

General - (Project)

Datasource Type

Lookup

Datasource Type

LOOKUP(DENSE "P6Core"."Lookup - ETL Source Type"."Feature Desc", "P6Core"."Dim - Project"."Datasource Id")

Project

General - (Project)

Project Leveling Priority

Dimension

Priority for leveling

Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_PRIORITY

Project

General - (Project)

Project Score

Dimension

The Project score

Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_RISK_SCORE

Project

General - (Project)

Project Description

Dimension

The project description

Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_DESCRIPTION

Project

General - (Project)

Project Id

Dimension

The Project Id of the project

Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_ID

Project

General - (Project)

Project Name

Dimension

The project name

Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_NAME

Project

General - (Project)

Unique Project ID

Dimension

The Unique ID of the project

Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_OBJECT_ID

Project

General - (Project)

Project Owner

Dimension

Resource designated as owner of the project

Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_OWNER

Project

General - (Project)

Project Risk Exposure

Dimension

The calculated exposure value for the risk

Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_RISK_EXPOSURE

Project

General - (Project)

Project Risk Level

Dimension

Project risk level (1 - Very Low, 2 - Low, 3 - Medium, 4 - High, 5 - Very High)

Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_RISK_LEVEL

Project

General - (Project)

Project Risk Score

Dimension

The calculated score value of the impact values assigned to the risk

Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_RISK_SCORE

Project

General - (Project)

Unique Project WBS ID

Dimension

The Unique ID of the projects root level WBS

Value Derived From : Dim_W_PROJECT_D_Project.WBS_OBJECT_ID

Project

General - (Project)

Project Status

Dimension

The status of the project as active, inactive, planned or what-if

Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_STATUS

Project

General - (Project)

Strategic Priority

Dimension

Range 1 to 10,000

Value Derived From : Dim_W_PROJECT_D_Project.PROJECT_STRATEGIC_PRIORITY

Project

Location - (Project)

Address Line 1

Dimension

The first line of the address

Value Derived From : Dim_W_PROJECT_D_Project.ADDRESS_LINE1

Project

Location - (Project)

Address Line 2

Dimension

The second line of the address

Value Derived From : Dim_W_PROJECT_D_Project.ADDRESS_LINE2

Project

Location - (Project)

City Name

Dimension

The city name for this Location

Value Derived From : Dim_W_PROJECT_D_Project.CITY_NAME

Project

Location - (Project)

Country Code

Dimension

The country code for this Location

Value Derived From : Dim_W_PROJECT_D_Project.COUNTRY_CODE

Project

Location - (Project)

Country Name

Dimension

The country name for this Location

Value Derived From : Dim_W_PROJECT_D_Project.COUNTRY_NAME

Project

Location - (Project)

Latitude

Dimension

The latitude for this Location

Value Derived From : Dim_W_PROJECT_D_Project.LATITUDE

Project

Location - (Project)

Location Name

Dimension

The name of the location

Value Derived From : Dim_W_PROJECT_D_Project.LOCATION_NAME

Project

Location - (Project)

Location Type

Dimension

Location Type

Value Derived From : Dim_W_PROJECT_D_Project.LOCATION_TYPE

Project

Location - (Project)

Longitude

Dimension

The longitude for this Location

Value Derived From : Dim_W_PROJECT_D_Project.LONGITUDE

Project

Location - (Project)

Municipality Name

Dimension

The municipality name for this Location

Value Derived From : Dim_W_PROJECT_D_Project.MUNICIPALITY_NAME

Project

Location - (Project)

Postal Code

Dimension

The postal code for this Location

Value Derived From : Dim_W_PROJECT_D_Project.POSTAL_CODE

Project

Location - (Project)

State/Province Code

Dimension

The state abbreviation for this Location

Value Derived From : Dim_W_PROJECT_D_Project.STATE_CODE

Project

Location - (Project)

State/Province Name

Dimension

The state name for this Location

Value Derived From : Dim_W_PROJECT_D_Project.STATE_NAME

Project

P6 Links

 

 

Go to P6 Links

 

Project

P6 Links

Link to Activities

Dimension

Go to Project Activities

'<a target="_blank" href="' || VALUEOF(NQ_SESSION."DW_P6_LINK_BASE_URL") || VALUEOF("DW_P6_LINK_PROJECT_LIST_BASE_URL") || CAST (P6Core."Dim - Project"."Project WBS Object Id" AS VARCHAR ( 10 )) || '%26key%3Dactivities">' || 'Project Activities' || '</a>'

Project

P6 Links

Link to Documents

Dimension

Go to Project Documents

'<a target="_blank" href="' || VALUEOF(NQ_SESSION."DW_P6_LINK_BASE_URL") || VALUEOF("DW_P6_LINK_PROJECT_LIST_BASE_URL") || CAST (P6Core."Dim - Project"."Project WBS Object Id" AS VARCHAR ( 10 )) || '%26key%3Ddocuments">' || 'Project Documents' || '</a>'

Project

P6 Links

Link to Issues

Dimension

Go to Project Issues

'<a target="_blank" href="' || VALUEOF(NQ_SESSION."DW_P6_LINK_BASE_URL") || '/action/pm/lwfissuemanagement?projectId=' || CAST (P6Core."Dim - Project"."Project Object Id" AS VARCHAR ( 10 )) || '&wbsId=' || CAST (P6Core."Dim - Project"."Project WBS Object Id" AS VARCHAR ( 10 )) || '&checkTabs=true">' || 'Project Issues' || '</a>'

Project

P6 Links

Link to Risks

Dimension

Go to Project Risks

'<a target="_blank" href="' || VALUEOF(NQ_SESSION."DW_P6_LINK_BASE_URL") || VALUEOF("DW_P6_LINK_PROJECT_LIST_BASE_URL") || CAST (P6Core."Dim - Project"."Project WBS Object Id" AS VARCHAR ( 10 )) || '%26key%3Drisks">' || 'Project Risks' || '</a>'

Project

Notebooks - (Project)

Link to Team Usage

Dimension

Go to Project Team Usage

'<a target="_blank" href="' || VALUEOF(NQ_SESSION."DW_P6_LINK_BASE_URL") || VALUEOF("DW_P6_LINK_PROJECT_LIST_BASE_URL") || CAST (P6Core."Dim - Project"."Project WBS Object Id" AS VARCHAR ( 10 )) || '%26key%3Dteamusage">' || 'Project Team Usage' || '</a>'

Project

Notebooks - (Project)

Create Date

Dimension

The date the notebook topic was created

Value Derived From : Dim_W_PROJECT_NOTE_D_Project_Note.W_CREATE_DT

Project

Notebooks - (Project)

Create User

Dimension

The user that created the notebook topic

Value Derived From : Dim_W_PROJECT_NOTE_D_Project_Note.W_CREATE_USER

Project

Notebooks - (Project)

Notebook Text

Lookup

The text of the notebook topic

Lookup(DENSE "P6Core"."Lookup - Project Note"."Raw Text", "P6Core"."Dim - Project Note"."Note Key", "P6Core"."Dim - Project Note"."Project Key")

Project

Notebooks - (Project)

Notebook Topic Name

Dimension

The name of the notebook topic

Value Derived From : Dim_W_PROJECT_NOTE_D_Project_Note.NOTEBOOK_TOPIC_NAME

Project

Notebooks - (Project)

Update Date

Dimension

The date the notebook topic was updated

Value Derived From : Dim_W_PROJECT_NOTE_D_Project_Note.W_UPDATE_DT

Project

Notebooks - (Project)

Update User

Dimension

The last user to update notebook topic

Value Derived From : Dim_W_PROJECT_NOTE_D_Project_Note.W_UPDATE_USER

 

 

 

 

 

 

Cost Breakdown Structure Folder

 

 

 

 

 

Cost Breakdown Structure

General - (CBS)

CBS Code

Dimension

The full cost code

Value Derived From : Dim_W_CBS_HIERARCHY_D_CbsHier.CBS_CODE

Cost Breakdown Structure

General - (CBS)

CBS Name

Dimension

The name of the CBS element

Value Derived From : Dim_W_CBS_HIERARCHY_D_CbsHier.CBS_NAME

Cost Breakdown Structure

General - (CBS)

Cost Status

Dimension

The status of the cost code

Value Derived From : Dim_W_CBS_HIERARCHY_D_CbsHier.CBS_STATUS

 

 

 

 

 

 

Time Folder

 

 

 

 

 

Time

Calendar

Calendar Date

Dimension

Calendar Date (01/01/2013 12:00am)

Value Derived From : Dim_W_DAY_D_Common.DAY_DT

Time

Calendar

Calendar Half

Dimension

Calendar Half (1-2)

Value Derived From : Dim_W_DAY_D_Common.CAL_HALF

Time

Calendar

Calendar Month

Dimension

Calendar Month (1-12)

Value Derived From : Dim_W_DAY_D_Common.CAL_MONTH

Time

Calendar

Calendar Quarter

Dimension

Calendar Quarter (1-4)

Value Derived From : Dim_W_DAY_D_Common.CAL_QTR

Time

Calendar

Calendar Week

Dimension

Calendar Week (1-53)

Value Derived From : Dim_W_DAY_D_Common.CAL_WEEK

Time

Calendar

Calendar Year

Dimension

Calendar Year (2013)

Value Derived From : Dim_W_DAY_D_Common.CAL_YEAR

Time

Calendar

Day Date

Dimension

Calendar Date (01/01/2013 12:00am)

Value Derived From : Dim_W_DAY_D_Common.DAY_DT

Time

Calendar

Day Name

Dimension

Full day name (January 1, 2013)

Value Derived From : Dim_W_DAY_D_Common.DAY_NAME

Time

Calendar

Day Of Month

Dimension

Day of the month (1 - 31)

Value Derived From : Dim_W_DAY_D_Common.DAY_OF_MONTH

Time

Calendar

Day Of Week

Dimension

Day of the week (1=Sunday, 7=Saturday)

Value Derived From : Dim_W_DAY_D_Common.DAY_OF_WEEK

Time

Calendar

Day Of Year

Dimension

Day of the year (1-365)

Value Derived From : Dim_W_DAY_D_Common."DAY_OF_YEAR"

Time

Calendar

Financial Period

Dimension

Financial Period (2013-01-01)

Value Derived From : Dim_W_DAY_D_Common.FIN_PERIOD_1

Time

Calendar

Short Day Name

Dimension

Day-Month (01-JAN)

Value Derived From : Dim_W_DAY_D_Common.SHORT_DAY_NAME

Time

Calendar

Half Name

Dimension

Year-Half name (2013-H1)

Value Derived From : Dim_W_DAY_D_Common.SORT_HALF_NAME

Time

Calendar

Month Name

Dimension

Year-Month name (2013-01)

Value Derived From : Dim_W_DAY_D_Common.SORT_MONTH_NAME

Time

Calendar

Quarter Name

Dimension

Year-Quarter name (2013-Q4)

Value Derived From : Dim_W_DAY_D_Common.SORT_QUARTER_NAME

Time

Calendar

Week Name

Dimension

First day of the week (2013-01-01)

Value Derived From : Dim_W_DAY_D_Common.SORT_WEEK_NAME

Time

Calendar

Year Name

Dimension

Year Name (2013)

Value Derived From : Dim_W_DAY_D_Common.YEAR_NAME

 

 

 

 

 

 

Fact - Primavera -Activity Folder

 

 

 

 

 

Fact - Primavera -Activity

Costs

Actual Expense Cost

Fact

The actual cost for all project expenses associated with the activity

Value calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.ACTUAL_EXPENSE_COST)

Fact - Primavera -Activity

Costs

Actual Labor Cost

Fact

The actual cost for all labor resources assigned to the activity. If no resources are assigned, computed as the activity Actual Labor Units * Project Default Price / Time.

Value calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.ACTUAL_LABOR_COST)

Fact - Primavera -Activity

Costs

Actual Material Cost

Fact

The actual cost for all material resources assigned to the activity

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.ACTUAL_MATERIAL_COST)

Fact - Primavera -Activity

Costs

Actual NonLabor Cost

Fact

The actual cost for all nonlabor resources assigned to the activity. If no resources are assigned, computed as the activity Actual Nonlabor Units * Project Default Price / Time.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.ACTUAL_NONLABOR_COST)

Fact - Primavera -Activity

Costs

Actual Total Cost

Fact

The Actual Total Cost for the activity, including labor resources, nonlabor resources, material resources, and project expenses. Actual Total Cost = Actual Labor Cost + Actual Nonlabor Cost + Actual Material Cost + Actual Expense Cost.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.ACTUAL_TOTAL_COST)

Fact - Primavera -Activity

Costs

At Completion Expense Cost

Fact

The expense cost at completion is the sum of the actual plus remaining cost for all expenses associated with the activity. Computed as Actual Expense Cost + Remaining Expense Cost.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.AT_COMPLETION_EXPENSE_COST)

Fact - Primavera -Activity

Costs

At Completion Labor Cost

Fact

The labor cost at completion is the sum of the actual plus remaining cost for all labor resources assigned to the activity. Computed as Actual Labor Cost + Remaining Labor Cost. Same as the budgeted labor cost if the activity is not started and the actual labor cost once the activity is completed.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.AT_COMPLETION_LABOR_COST)

Fact - Primavera -Activity

Costs

At Completion Material Cost

Fact

The material cost at completion is the sum of the actual plus remaining cost for all material resources assigned to the activity. Computed as Actual Material Cost + Remaining Material Cost. Same as the budgeted material cost if the activity is not started and the actual material cost once the activity is completed.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.AT_COMPLETION_MATERIAL_COST)

Fact - Primavera -Activity

Costs

At Completion Nonlabor Cost

Fact

The nonlabor cost at completion is the sum of the actual plus remaining cost for all nonlabor resources assigned to the activity. Computed as Actual Nonlabor Cost + Remaining Nonlabor Cost. Same as the budgeted nonlabor cost if the activity is not started and the actual nonlabor cost once the activity is completed.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.AT_COMPLETION_NONLABOR_COST)

Fact - Primavera -Activity

Costs

At Completion Total Cost

Fact

The total cost at completion for the activity, including labor resources, nonlabor resources, material resources, and project expenses. At Completion Total Cost = At Completion Labor Cost + At Completion Nonlabor Cost + At Completion Material Cost + At Completion Expense Cost.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.AT_COMPLETION_TOTAL_COST)

Fact - Primavera -Activity

Costs

Baseline Actual Expense Cost

Fact

The actual cost for all project expenses associated with the activity in the primary baseline

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_ACTUAL_EXPENSE_COST)

Fact - Primavera -Activity

Costs

Baseline Actual Labor Cost

Fact

The actual cost for all labor resources assigned to the activity in the project baseline. If no resources are assigned, computed as the activity Baseline Project Actual Labor Units * Project Default Price / Time.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_ACTUAL_LABOR_COST)

Fact - Primavera -Activity

Costs

Baseline Actual Material Cost

Fact

The actual cost for all material resources assigned to the activity in the project baseline

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_ACTUAL_MATERIAL_COST)

Fact - Primavera -Activity

Costs

Baseline Actual Nonlabor Cost

Fact

The actual cost for all nonlabor resources assigned to the activity in the project baseline. If no resources are assigned, computed as the activity Baseline Project Actual Nonlabor Units * Project Default Price / Time

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_ACTUAL_NONLABOR_COST)

Fact - Primavera -Activity

Costs

Baseline Actual Total Cost

Fact

The actual total cost for the activity in the project baseline, including labor resources, nonlabor resources, material resources and project expenses. Baseline Project Actual Total Cost = Baseline Project Actual Labor Cost + Baseline Project Actual Nonlabor Cost + Baseline Project Actual Material Cost + Baseline Project Actual Expense Cost

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_ACTUAL_TOTAL_COST)

Fact - Primavera -Activity

Costs

Baseline Project Expense Cost

Fact

The cost for all the project expenses associated with the activity in the project baseline.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_PLANNED_EXPENSE_COST)

Fact - Primavera -Activity

Costs

Baseline Project Labor Cost

Fact

The cost for all the labor resources assigned to an activity in the project baseline.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_PLANNED_LABOR_COST)

Fact - Primavera -Activity

Costs

Baseline Project Material Cost

Fact

Budgeted or (At Completion)cost for all material resources assigned to the activity in the project baseline.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_PLANNED_MATERIAL_COST)

Fact - Primavera -Activity

Costs

Baseline Project Nonlabor Cost

Fact

The cost for all the Nonlabor resources assigned to an activity in the project baseline

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_PLANNED_NONLABOR_COST)

Fact - Primavera -Activity

Costs

Baseline Project Total Cost

Fact

The total cost of the activity in the project baseline, including labor resources, non-labor resources, material resources, and project expenses.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_PLANNED_TOTAL_COST)

Fact - Primavera -Activity

Costs

Planned Expense Cost

Fact

The budgeted cost for all project expenses associated with the activity.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PLANNED_EXPENSE_COST)

Fact - Primavera -Activity

Costs

Planned Labor Cost

Fact

The budgeted costs for all labor resources assigned to the activity. If no resources are assigned, computed as the activity Budgeted Labor Units * Project Default Price / Time.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PLANNED_LABOR_COST)

Fact - Primavera -Activity

Costs

Planned Material Cost

Fact

The budgeted costs for all material resources assigned to the activity. If no resources are assigned, computed as the activity Budgeted Labor Units * Project Default Price / Time.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PLANNED_MATERIAL_COST)

Fact - Primavera -Activity

Costs

Planned Nonlabor Cost

Fact

The budgeted costs for all nonlabor resources assigned to the activity.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PLANNED_NONLABOR_COST)

Fact - Primavera -Activity

Costs

Planned Total Cost

Fact

The budgeted total cost for the activity, including labor resources, nonlabor resources, material resources, and project expenses. Budgeted Total Cost = Budgeted Labor Cost + Budgeted Nonlabor Cost + Budgeted Material Cost + Budgeted Expense Cost.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PLANNED_TOTAL_COST)

Fact - Primavera -Activity

Costs

Remaining Expense Cost

Fact

The remaining cost for all project expenses associated with the activity.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_EXPENSE_COST)

Fact - Primavera -Activity

Costs

Remaining Labor Cost

Fact

The remaining cost for all labor resources assigned to the activity. If no resources are assigned, computed as the activity Remaining Labor Units * Project Default Price / Time.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_LABOR_COST)

Fact - Primavera -Activity

Costs

Remaining Late Expense Cost

Fact

Remaining Late Expense Cost

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_LATE_EXPENSE_COST)

Fact - Primavera -Activity

Costs

Remaining Late Labor Cost

Fact

Remaining Late Labor Cost

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_LATE_LABOR_COST)

Fact - Primavera -Activity

Costs

Remaining Late Material Cost

Fact

Remaining Late Material Cost

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_LATE_MATERIAL_COST)

Fact - Primavera -Activity

Costs

Remaining Late Nonlabor Cost

Fact

Remaining Late Nonlabor Cost

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_LATE_NONLABOR_COST)

Fact - Primavera -Activity

Costs

Period Remaining Late Total Cost

Fact

The Remaining Late Total Cost for the period specified

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_LATE_TOTAL_COST)

Fact - Primavera -Activity

Costs

Remaining Material Cost

Fact

The remaining cost for all material resources assigned to the activity.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_MATERIAL_COST)

Fact - Primavera -Activity

Costs

Remaining Nonlabor Cost

Fact

The remaining cost for all nonlabor resources assigned to the activity. If no resources are assigned, computed as the activity Remaining Nonlabor Units * Project Default Price / Time.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_NONLABOR_COST)

Fact - Primavera -Activity

Costs

Remaining Total Cost

Fact

The remaining total cost for the activity, including labor resources, nonlabor resources, material resources, and project expenses. Remaining Total Cost = Remaining Labor Cost + Remaining Nonlabor Cost + Remaining Material Cost + Remaining Expense Cost.

Value Calculated by: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_TOTAL_COST)

Fact - Primavera -Activity

Earned Value (Cost)

Accounting Variance (Cost)

Fact

Accounting Variance is the Planned Value minus the Actual Cost. A negative value indicates that Actual Cost have exceeded the Planned Value

Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Planned Value Cost" - "P6Core"."Fact - Activity Spread"."Actual Cost"

Fact - Primavera -Activity

Earned Value (Cost)

Budget At Completion (Cost)

Fact

Budget at Completion is the baseline Labor Cost + baseline Nonlabor Cost + baseline Expense Cost + baseline Material Cost. Same as the baseline Total Cost.

Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Baseline Project Total Cost"

Fact - Primavera -Activity

Earned Value (Cost)

Cost Performance Index (Cost)

Fact

Cost Performance Index is the Earned Value divided by the Actual Cost. A value less than 1 indicates that Actual Cost have exceeded the Planned Value.

Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Earned Value Cost" / "P6Core"."Fact - Activity Spread"."Actual Cost"

Fact - Primavera -Activity

Earned Value (Cost)

Cost Schedule Index (Cost)

Fact

Cost Schedule Index By Cost

Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Cost Performance Index - (CPI)" * "P6Core"."Fact - Activity Spread"."Schedule Performance Index (SPI) - Cost"

Fact - Primavera -Activity

Earned Value (Cost)

Cost Variance (Cost)

Fact

Cost Variance is the Earned Value minus the Actual Cost. A negative value indicates that Actual Cost have exceeded the Planned Value.

Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Earned Value Cost" - "P6Core"."Fact - Activity Spread"."Actual Cos

Fact - Primavera -Activity

Earned Value (Cost)

Cost Variance Index (Cost)

Fact

Cost Variance Index is the Cost Variance divided by Earned Value.

Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Cost Variance" / "P6Core"."Fact - Activity Spread"."Earned Value Cost"

Fact - Primavera -Activity

Earned Value (Cost)

Earned Value (Cost)

Fact

Earned value cost for the project

Value Derived From: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.EARNED_VALUE_COST)

Fact - Primavera -Activity

Earned Value (Cost)

Estimate At Completion (Cost)

Fact

Estimate Cost at Completion is the Actual Cost plus the Estimate to Complete Cost. The method for computing Estimate to Complete depends on the Earned Value technique selected for the activity's WBS.

Value Derived From existing columns using expression: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.EST_AT_COMPLETION_COST)

Fact - Primavera -Activity

Earned Value (Cost)

Estimate to Complete (Cost)

Fact

Calculated Estimate To Complete using specified technique

Value Derived From existing columns using expression: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.EST_TO_COMPLETE_COST)

Fact - Primavera -Activity

Earned Value (Cost)

Planned Value (Cost)

Fact

Planned cost of work scheduled for the project

Value Derived From existing columns using expression: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PLANNED_VALUE_COST)

Fact - Primavera -Activity

Earned Value (Cost)

Schedule Performance Index (Cost)

Fact

Schedule Performance Index is the Earned Value divided by Planned Value. A value less than 1 indicates that less work was actually performed than was scheduled.

Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Earned Value Cost" / "P6Core"."Fact - Activity Spread"."Planned Value Cost"

Fact - Primavera -Activity

Earned Value (Cost)

Schedule Variance (Cost)

Fact

Schedule Variance is the Earned Value minus the Planned Value. A negative value indicates that less work was actually performed than was scheduled.

Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Earned Value Cost" - "P6Core"."Fact - Activity Spread"."Planned Value Cost"

Fact - Primavera -Activity

Earned Value (Cost)

Schedule Variance Index (Cost)

Fact

Schedule Variance Index is the Schedule Variance divided by Planned Value.

Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Schedule Variance - Cost" / "P6Core"."Fact - Activity Spread"."Planned Value Cost"

Fact - Primavera -Activity

Earned Value (Cost)

To Complete Performance Index - BAC (Cost)

Fact

The To Complete Performance Index is (Budget at Completion - Earned Value) / (Budget at Completion (BAC)- Actual Cost).

Value Derived From existing columns using expression: ("P6Core"."Fact - Activity Spread"."Baseline Project Total Cost" - "P6Core"."Fact - Activity Spread"."Earned Value Cost") / ("P6Core"."Fact - Activity Spread"."Baseline Project Total Cost" - "P6Core"."Fact - Activity Spread"."Actual Cost")

Fact - Primavera -Activity

Earned Value (Cost)

To Complete Performance Index - EAC (Cost)

Fact

The To Complete Performance Index is (Budget at Completion - Earned Value) / (Estimate at Completion - Actual Cost).

Value Derived From existing columns using expression: ("P6Core"."Fact - Activity Spread"."Baseline Project Total Cost" - "P6Core"."Fact - Activity Spread"."Earned Value Cost") / ("P6Core"."Fact - Activity Spread"."Estimate At Completion Cost" - "P6Core"."Fact - Activity Spread"."Actual Cost")

Fact - Primavera -Activity

Earned Value (Cost)

Variance At Completion (Cost)

Fact

Variance At Completion is the Budget At Completion (baseline total cost) minus Estimate At Completion.

Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Baseline Project Total Cost" - "P6Core"."Fact - Activity Spread"."Estimate At Completion Cost"

Fact - Primavera -Activity

Earned Value (Units)

Accounting Variance (Units)

Fact

Accounting Variance Labor Units is the Planned Value Labor Units minus the Actual Units. Negative value indicates that Actual Units have exceeded the Planned Value Labor Units.

Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Planned Value Labor Units" - "P6Core"."Fact - Activity Spread"."Actual Labor Units"

Fact - Primavera -Activity

Earned Value (Units)

Budget At Completion (Units)

Fact

Budget at Completion Labor Units is the baseline Labor Units + baseline Nonlabor Labor Units + baseline Expense Labor Units + baseline Material Labor Units. Same as the baseline Total Labor Units.

Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Baseline Project Labor Units"

Fact - Primavera -Activity

Earned Value (Units)

Cost Performance Index (Units)

Fact

Cost Performance Index Labor Units is the Earned Value Labor Units / Actual Labor Units.

Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Earned Value Labor Units" / "P6Core"."Fact - Activity Spread"."Actual Labor Units"

Fact - Primavera -Activity

Earned Value (Units)

Cost Schedule Index (Units)

Fact

Cost Schedule Index By Units

Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Cost Performance Index (CPI) - Labor Units" * "P6Core"."Fact - Activity Spread"."Schedule Performance Index (SPI) - Labor Units"

Fact - Primavera -Activity

Earned Value (Units)

Cost Variance (Units)

Fact

Cost Variance Labor Units is Earned Value Labor Units minus Actual Labor Units.

Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Earned Value Labor Units" - "P6Core"."Fact - Activity Spread"."Actual Labor Units"

Fact - Primavera -Activity

Earned Value (Units)

Cost Variance Index (Units)

Fact

Cost Variance Index is the Cost Variance divided by Earned Value.

Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Cost Variance - Labor Units" / "P6Core"."Fact - Activity Spread"."Earned Value Labor Units"

Fact - Primavera -Activity

Earned Value (Units)

Earned Value (Units)

Fact

Earned Value Labor Units Performed is the portion of the baseline Labor Units that is actually completed as of the project data date. Computed as baseline Labor Units * Performance % Complete. The Earned Value Labor Units is essentially the labor units earned value for the activity. The method for computing the Performance % Complete depends on the earned value technique selected for the activity's WBS. The baseline Labor Units is taken from the baseline.

Value Derived From existing columns using expression: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.EARNED_VALUE_LABOR_UNITS)

Fact - Primavera -Activity

Earned Value (Units)

Estimate At Completion (Units)

Fact

Estimate At Completion Labor Units is calculated as Actual Labor Units + Estimate To Complete Labor Units. (Estimate To Complete Labor Units is calculated based off of the Earned Value setting on the WBS.)

Value Derived From existing columns using expression: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.EST_AT_COMPLETION_LABOR_UNITS)

Fact - Primavera -Activity

Earned Value (Units)

Estimate To Complete (Units)

Fact

The estimated quantity to complete of the activity. Computed as either the remaining total units for the activity, or as Performance Factor * (Baseline Budgeted Labor Units - Budgeted Quantity of Work Performed), depending on the Earned Value Technique selected for the activity's WBS.

Value Derived From existing columns using expression: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.EST_TO_COMPLETE_LABOR_UNITS)

Fact - Primavera -Activity

Earned Value (Units)

Planned Value (Units)

Fact

Planned Value Labor Units Scheduled is the portion of the baseline Labor Units that is scheduled to be completed as of the project data date. For activities without resource assignments, and for activity resource assignments that do not have resource curves, computed as baseline Labor Units * Schedule % Complete. For activity resource assignments that do have resource curves, the curve distribution is additionally factored into the calculation. The Schedule % Complete specifies how much of the activity's baseline duration has been completed so far. The baseline Labor Units is taken from the baseline.

Value Derived From existing columns using expression: sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PLANNED_VALUE_LABOR_UNITS)

Fact - Primavera -Activity

Earned Value (Units)

Schedule Performance Index (Units)

Fact

Schedule Performance Index Labor Units is the Earned Value Labor Units divided by Planned Value Labor Units.

Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Earned Value Labor Units" / "P6Core"."Fact - Activity Spread"."Planned Value Labor Units"

Fact - Primavera -Activity

Earned Value (Units)

Schedule Variance (Units)

Fact

Schedule Variance Labor Units is the Earned Value Labor Units minus Planned Value Labor Units.

Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Earned Value Labor Units" - "P6Core"."Fact - Activity Spread"."Planned Value Labor Units"

Fact - Primavera -Activity

Earned Value (Units)

Schedule Variance Index (Units)

Fact

Schedule Variance Index is the Schedule Variance Labor Units divided by the Planned Value Labor Units.

Value Derived From existing columns using expression: "P6Core"."Fact - Activity Spread"."Schedule Variance - Labor Units" / "P6Core"."Fact - Activity Spread"."Planned Value Labor Units"

Fact - Primavera -Activity

Earned Value (Units)

To Complete Performance Index - BAC (Units)

Fact

The To Complete Performance Index is (Budget at Completion (BAC) - Earned Value Labor Units) / (Budget at Completion (BAC) - Actual Labor Units).

Value Derived From existing columns using expression: ("P6Core"."Fact - Activity Spread"."Budget At Completion (BAC) - Labor Units" - "P6Core"."Fact - Activity Spread"."Earned Value Labor Units") / ("P6Core"."Fact - Activity Spread"."Budget At Completion (BAC) - Labor Units" - "P6Core"."Fact - Activity Spread"."Actual Labor Units")

Fact - Primavera -Activity

Earned Value (Units)

To Complete Performance Index - EAC (Units)

Fact

The To Complete Performance Index is (Budget at Completion (EAC) - Earned Value Labor Units) / (Estimated at Completion - Actual Labor Units).

Value Derived From existing columns using expression: ("P6Core"."Fact - Activity Spread"."Budget At Completion (BAC) - Labor Units" - "P6Core"."Fact - Activity Spread"."Earned Value Labor Units") / ("P6Core"."Fact - Activity Spread"."Estimate At Completion - Labor Units" - "P6Core"."Fact - Activity Spread"."Actual Labor Units")

Fact - Primavera -Activity

Earned Value (Units)

Variance At Completion (Units)

Fact

Variance At Completion is the Planned Labor Units minus Estimate At Completion Labor Units.

"P6Core"."Fact - Activity Spread"."Baseline Project Labor Units" - "P6Core"."Fact - Activity Spread"."Estimate At Completion - Labor Units"

Fact - Primavera - Activity

Metrics

# Of Activities

Fact

# Of Activities

Value Derived From: count(distinct case when Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.ACTIVITY_WID > 0 then Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.ACTIVITY_WID else NULL end )

Fact - Primavera -Activity

Metrics

# Of Projects

Fact

# Of Projects

Value Derived From: count(distinct Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PROJECT_WID)

Fact - Primavera - Activity

Percent Completes

 

 

 

 

Fact - Primavera - Activity

Percent Completes

Cost % Complete

Fact

The percent complete of cost for all labor resources, nonlabor resources, material resources, and expenses for the activity. Computed as Actual Total Cost / At Completion Total Cost * 100. Always in the range 0 to 100.

P6Core."Fact - Activity Spread"."Actual Total Cost" / P6Core."Fact - Activity Spread"."At Completion Total Cost" * 100

Fact - Primavera - Activity

Percent Completes

Cost % of Planned

Fact

The proportion of the cost budget that has been spent. Computed as actual total cost / baseline total cost.

P6Core."Fact - Activity Spread"."Actual Cost" / P6Core."Fact - Activity Spread"."Budget at Completion" * 100

Fact - Primavera - Activity

Percent Completes

Expense Cost % Complete

Fact

The percent complete of cost for all expenses associated with the wbs. Computed as Actual Expense Cost / At Complete Expense Cost * 100. Always in the range 0 to 100.

P6Core."Fact - Activity Spread"."Actual Expense Cost" / P6Core."Fact - Activity Spread"."At Completion Expense Cost" * 100

Fact - Primavera - Activity

Percent Completes

Labor Cost % Complete

Fact

The percent complete of cost for all labor resources assigned to the wbs. Computed as Actual Labor Cost / At Complete Labor Cost * 100. Always in the range 0 to 100.

P6Core."Fact - Activity Spread"."Actual Labor Cost" / P6Core."Fact - Activity Spread"."At Completion Labor Cost" * 100

Fact - Primavera - Activity

Percent Completes

Labor Units % Complete

Fact

The percent complete of units for all labor resources for the activity. Computed as Actual Labor Units / At Completion Labor Units * 100. Always in the range 0 to 100.

P6Core."Fact - Activity Spread"."Actual Labor Units" / P6Core."Fact - Activity Spread"."At Completion Labor Units" * 100

Fact - Primavera - Activity

Percent Completes

Material Cost % Complete

Fact

The percent complete of cost for all material resources assigned to the wbs. Computed as Actual Material Cost / At Complete Material Cost * 100. Always in the range 0 to 100.

P6Core."Fact - Activity Spread"."Actual Material Cost" / P6Core."Fact - Activity Spread"."At Completion Material Cost" * 100

Fact - Primavera - Activity

Percent Completes

Nonlabor Cost % Complete

Fact

The percent complete of cost for all nonlabor resources assigned to the wbs. Computed as Actual Nonlabor Cost / At Complete Nonlabor Cost * 100. Always in the range 0 to 100.

P6Core."Fact - Activity Spread"."Actual Nonlabor Cost" / P6Core."Fact - Activity Spread"."At Completion Nonlabor Cost" * 100

Fact - Primavera - Activity

Percent Completes

Nonlabor Units % Complete

Fact

The percent complete of units for all nonlabor resources for the activity. Computed as Actual Nonlabor Units / At Completion Nonlabor Units * 100. Always in the range 0 to 100.

P6Core."Fact - Activity Spread"."Actual Nonlabor Units" / P6Core."Fact - Activity Spread"."At Completion Nonlabor Units" * 100

Fact - Primavera - Activity

Percent Completes

Performance % Complete

Fact

The activity performance percent complete. The performance percent complete is used to compute earned value and may be based on the Activity % Complete, on the 0/100 rule, on the 50/50 rule, etc., depending on the technique for computing earned-value percent complete for the activity's WBS. The Performance % Complete specifies what percentage of the activity's planned worth has been earned so far.

P6Core."Fact - Activity Spread"."Earned Value Cost" / P6Core."Fact - Activity Spread"."Budget at Completion" * 100

Fact - Primavera - Activity

Percent Completes

Perfomance % Complete (Units)

Fact

Perfomance % Complete (Units)

IFNULL(P6Core."Fact - Activity Spread"."Earned Value Labor Units", 0) / IFNULL(P6Core."Fact - Activity Spread"."Budget At Completion (BAC) - Labor Units", 0) * 100

Fact - Primavera - Activity

Percent Completes

Schedule % Complete

Fact

Schedule % Complete

P6Core."Fact - Activity Spread"."Planned Value Cost" / P6Core."Fact - Activity Spread"."Budget at Completion" * 100

Fact - Primavera - Activity

Percent Completes

Schedule % Complete (Units)

Fact

Schedule % Complete (Units)

IFNULL(P6Core."Fact - Activity Spread"."Planned Value Labor Units", 0) / IFNULL(P6Core."Fact - Activity Spread"."Budget At Completion (BAC) - Labor Units", 0) * 100

Fact - Primavera - Activity

Percent Completes

Units % Complete

Fact

The percent complete of units for all labor and nonlabor resources assigned to the activity. Computed as Actual Units / At Completion Units * 100. Always in the range 0 to 100.

( IFNULL(P6Core."Fact - Activity Spread"."Actual Labor Units", 0) + IFNULL(P6Core."Fact - Activity Spread"."Actual Nonlabor Units", 0)) / ( IFNULL(P6Core."Fact - Activity Spread"."At Completion Labor Units", 0) + IFNULL(P6Core."Fact - Activity Spread"."At Completion Nonlabor Units", 0)) * 100

Fact - Primavera - Activity

Units

 

 

Units

 

Fact - Primavera - Activity

Units

Actual Labor Units

Fact

The actual units for all labor resources assigned to the activity

sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.ACTUAL_LABOR_UNITS)

Fact - Primavera - Activity

Units

Actual Nonlabor Units

Fact

The actual units for all nonlabor resources assigned to the activity

sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.ACTUAL_NONLABOR_UNITS)

Fact - Primavera - Activity

Units

At Completion Labor Units

Fact

The labor units at completion is the sum of the actual plus remaining units for all labor resources assigned to the activity. Computed as Actual Labor Units + Remaining Labor Units. Same as the budgeted labor units if the activity is not started and the actual labor units once the activity is completed.

sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.AT_COMPLETION_LABOR_UNITS)

Fact - Primavera - Activity

Units

At Completion Nonlabor Units

Fact

The nonlabor units at completion is the sum of the actual plus remaining units for all nonlabor resources assigned to the activity. Computed as Actual Nonlabor Units + Remaining Nonlabor Units. Same as the budgeted nonlabor units if the activity is not started and the actual nonlabor units once the activity is completed.

sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.AT_COMPLETION_NONLABOR_UNITS)

Fact - Primavera - Activity

Units

Baseline Actual Labor Units

Fact

The actual units for all labor resources assigned to the activity in the project baseline

sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_ACTUAL_LABOR_UNITS)

Fact - Primavera - Activity

Units

Baseline Actual Nonlabor Units

Fact

The actual units for all nonlabor resources assigned to the activity in the project baseline

sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_ACTUAL_NONLABOR_UNITS)

Fact - Primavera - Activity

Units

Baseline Project Labor Units

Fact

The sum of the Budgeted (or At Completion) units for all labor resources assigned to the activity in the project baseline.

sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_PLANNED_LABOR_UNITS)

Fact - Primavera - Activity

Units

Baseline Project Nonlabor Units

Fact

The sum of the Budgeted (or At Completion) units for all nonlabor resources assigned to the activity in the project baseline

sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.BL_PLANNED_NONLABOR_UNITS)

Fact - Primavera - Activity

Units

Planned Labor Units

Fact

The budgeted units for all labor resources assigned to the activity

sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PLANNED_LABOR_UNITS)

Fact - Primavera - Activity

Units

Planned Nonlabor Units

Fact

The budgeted units for all nonlabor resources assigned to the activity

sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.PLANNED_NONLABOR_UNITS)

Fact - Primavera - Activity

Units

Remaining Labor Units

Fact

The remaining units for all labor resources assigned to the activity. The remaining units reflects the work remaining to be done for the activity. Before the activity is started, the remaining units are the same as the budgeted units. After the activity is completed, the remaining units are zero.

sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_LABOR_UNITS)

Fact - Primavera - Activity

Units

Remaining Late Labor Units

Fact

Remaining Late Labor Units

sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_LATE_LABOR_UNITS)

Fact - Primavera - Activity

Units

Remaining Late Nonlabor Units

Fact

Remaining Late Nonlabor Units

sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_LATE_NONLABOR_UNITS)

Fact - Primavera - Activity

Units

Remaining Nonlabor Units

Fact

The remaining units for all nonlabor resources assigned to the activity. The remaining units reflects the work remaining to be done for the activity. Before the activity is started, the remaining units are the same as the budgeted units. After the activity is completed, the remaining units are zero.

sum(Fact_W_ACTIVITY_SPREAD_F_Activity_Spread.REMAINING_NONLABOR_UNITS)

 

 

 

 

 

 

Activity Folder

 

 

 

 

 

Activity

Dates - (Activity)

Actual Finish

Dimension

The date on which the activity actually finished

Value Derived From : Dim_W_ACTIVITY_D_Activity.ACTUAL_FINISH_DATE

Activity

Dates - (Activity)

Actual Start

Dimension

The date on which the activity actually started

Value Derived From : Dim_W_ACTIVITY_D_Activity.ACTUAL_START_DATE

Activity

Dates - (Activity)

Baseline Project Finish

Dimension

The Project Baseline Planned Finish Date

Value Derived From : Dim_W_ACTIVITY_D_Activity.BASELINE_FINISH_DATE

Activity

Dates - (Activity)

Baseline Project Start

Dimension

The Project Baseline Planned Start Date

Value Derived From : Dim_W_ACTIVITY_D_Activity.BASELINE_START_DATE

Activity

Dates - (Activity)

Data Date

Dimension

The current data date for the project. The project status is up to date as of the data date. The data date is modified when project actuals are applied.

Value Derived From : Dim_W_ACTIVITY_D_Activity.DATA_DATE

Activity

Dates - (Activity)

Early Finish

Dimension

The earliest possible date the activity can finish. This date is calculated by the project scheduler based on activity relationships, schedule constraints, and resource availability.

Value Derived From : Dim_W_ACTIVITY_D_Activity.EARLY_FINISH_DATE

Activity

Dates - (Activity)

Early Start

Dimension

The earliest possible date the remaining work for the activity can begin. This date is calculated by the project scheduler based on activity relationships, schedule constraints, and resource availability.

Value Derived From : Dim_W_ACTIVITY_D_Activity.EARLY_START_DATE

Activity

Dates - (Activity)

Expected Finish

Dimension

The date the activity is expected to finish. Typically, this date is entered in the Timesheets module by the primary resource.

Value Derived From : Dim_W_ACTIVITY_D_Activity.EXPECT_FINISH_DATE

Activity

Dates - (Activity)

External Early Start

Dimension

The External Early Start date is the earliest finish date of all lost external relationships. This field is populated only during import when a relationship is lost because it does not exist in the current database. This date may be used to calculate the start date of the current activity in place of the true relationship when scheduling.

Value Derived From : Dim_W_ACTIVITY_D_Activity.EXTERNAL_EARLY_START_DATE

Activity

Dates - (Activity)

External Late Finish

Dimension

The External Late Finish date is the latest start date of all lost external relationships. This field is populated only during import when a relationship is lost because it does not exist in the current database. This date may be used to calculate the finish date of the current activity in place of the true relationship when scheduling.

Value Derived From : Dim_W_ACTIVITY_D_Activity.EXTERNAL_LATE_FINISH_DATE

Activity

Dates - (Activity)

Finish

Dimension

The current finish date of the activity. Set to the activity remaining early finish date while the activity is not started or in progress, and the actual finish date once the activity is completed.

Value Derived From : Dim_W_ACTIVITY_D_Activity.FINISH_DATE

Activity

Dates - (Activity)

Late Finish

Dimension

The latest possible date the activity must finish without delaying the project finish date. This date is calculated by the project scheduler based on activity relationships, schedule constraints, and resource availability.

Value Derived From : Dim_W_ACTIVITY_D_Activity.LATE_FINISH_DATE

Activity

Dates - (Activity)

Late Start

Dimension

The latest possible date the remaining work for the activity must begin without delaying the project finish date. This date is computed by the project scheduler based on network logic, schedule constraints, and resource availability.

Value Derived From : Dim_W_ACTIVITY_D_Activity.LATE_START_DATE

Activity

Dates - (Activity)

Planned Finish

Dimension

The date the activity is scheduled to finish. This date is computed by the project scheduler but can be updated manually by the project manager. This date is not changed by the project scheduler after the activity has been started.

Value Derived From : Dim_W_ACTIVITY_D_Activity.PLANNED_FINISH_DATE

Activity

Dates - (Activity)

Planned Start

Dimension

The date the activity is scheduled to begin. This date is computed by the project scheduler but can be updated manually by the project manager. This date is not changed by the project scheduler after the activity has been started.

Value Derived From : Dim_W_ACTIVITY_D_Activity.PLANNED_START_DATE

Activity

Dates - (Activity)

Primary Constraint Date

Dimension

The constraint date for the activity, if the activity has a constraint. The activity's constraint type determines whether this is a start date or finish date. Activity constraints are used by the project scheduler.

Value Derived From : Dim_W_ACTIVITY_D_Activity.PRIMARY_CONSTRAINT_DATE

Activity

Dates - (Activity)

Remaining Early Finish

Dimension

The date the remaining work for the activity is scheduled to finish. This date is computed by the project scheduler but can be updated manually by the project manager. Before the activity is started, the remaining finish date is the same as the planned finish date. This is the finish date that Progress Reporter users follow.

Value Derived From : Dim_W_ACTIVITY_D_Activity.REMAINING_FINISH_DATE

Activity

Dates - (Activity)

Remaining Early Start

Dimension

The date the remaining work for the activity is scheduled to begin. This date is computed by the project scheduler but can be updated manually by the project manager. Before the activity is started, the remaining start date is the same as the planned start date. This is the start date that Progress Reporter users follow.

Value Derived From : Dim_W_ACTIVITY_D_Activity.REMAINING_START_DATE

Activity

Dates - (Activity)

Remaining Late Finish

Dimension

Remaining late end date as calculated by the scheduler

Value Derived From : Dim_W_ACTIVITY_D_Activity.REMAINING_LATE_FINISH_DATE

Activity

Dates - (Activity)

Remaining Late Start

Dimension

Remaining late start date as calculated by the scheduler

Value Derived From : Dim_W_ACTIVITY_D_Activity.REMAINING_LATE_START_DATE

Activity

Dates - (Activity)

Resume Date

Dimension

The date progress is resumed on an activity

Value Derived From : Dim_W_ACTIVITY_D_Activity.RESUME_DATE

Activity

Dates - (Activity)

Secondary Constraint Date

Dimension

The second constraint date for the activity, if the activity has a constraint

Value Derived From : Dim_W_ACTIVITY_D_Activity.SECONDARY_CONSTRAINT_DATE

Activity

Dates - (Activity)

Start

Dimension

The current start date of the activity. Set to the activity remaining early start date while the activity is not started, and the actual start date once the activity is started.

Value Derived From : Dim_W_ACTIVITY_D_Activity.START_DATE

Activity

Dates - (Activity)

Suspend Date

Dimension

The date progress is suspended on an activity

Value Derived From : Dim_W_ACTIVITY_D_Activity.SUSPEND_DATE

Activity

Durations - (Activity)

Actual Duration

Dimension

Actual duration is the total working time from the activity actual start date to the actual finish date (for completed activities), or to the current data date (for in-progress activities). The actual working time is computed using the activity's calendar.

Value Derived From : Dim_W_ACTIVITY_D_Activity.ACTUAL_DURATION

Activity

Durations - (Activity)

At Completion Duration

Dimension

The duration at completion is the total working time from the activity's current start date to the current finish date. The current start date is the planned start date until the activity is started, then it is the actual start date. The current finish date is the activity planned finish date while the activity is not started, the remaining finish date while the activity is in progress, and the actual finish date once the activity is completed. The total working time is computed using the activity's calendar.

Value Derived From : Dim_W_ACTIVITY_D_Activity.AT_COMPLETION_DURATION

Activity

Durations - (Activity)

Baseline Project Duration

Dimension

The duration for the activity in the primary baseline

Value Derived From : Dim_W_ACTIVITY_D_Activity.ACTUAL_DURATION

Activity

Durations - (Activity)

Baseline Planned Duration

Dimension

Baseline Planned Duration is the total working time from the baseline activity planned start date to the baseline planned finish date. The baseline planned working time is computed using the activity's calendar.

Value Derived From : Dim_W_ACTIVITY_D_Activity.BASELINE_PLANNED_DURATION

Activity

Durations - (Activity)

Free Float

Dimension

The amount of time the activity can be delayed before delaying the start date of any successor activity.

Value Derived From : Dim_W_ACTIVITY_D_Activity.FREE_FLOAT

Activity

Durations - (Activity)

Original Duration

Dimension

Original Duration is the total working time from the activity planned start date to the planned finish date. The planned working time is computed using the activity's calendar.

Value Derived From : Dim_W_ACTIVITY_D_Activity.PLANNED_DURATION

Activity

Durations - (Activity)

Remaining Duration

Dimension

Remaining duration is the total working time from the activity remaining start date to the remaining finish date. The remaining working time is computed using the activity's calendar. Before the activity is started, the remaining duration is the same as the Original Duration. After the activity is completed the remaining duration is zero.

Value Derived From : Dim_W_ACTIVITY_D_Activity.REMAINING_DURATION

Activity

Durations - (Activity)

Remaining Float

Dimension

The amount of time remaining by which the activity can be delayed before delaying the project finish date. Computed as Late Finish - Remaining Finish. If the remaining finish is the same as the early finish ( in general, when the activity is not started), then the remaining float is the same as the total float.

Value Derived From : Dim_W_ACTIVITY_D_Activity.REMAINING_FLOAT

Activity

Durations - (Activity)

Total Float

Dimension

The amount of time the activity can be delayed before delaying the project finish date. Total float can be computed as Late Start - Early Start or as Late Finish - Early Finish; this option can be set when running the project scheduler.

Value Derived From : Dim_W_ACTIVITY_D_Activity.TOTAL_FLOAT

Activity

Durations - (Activity)

Variance - Baseline Project Duration

Dimension

The duration between the activity's baseline duration and the at completion duration. Calculated as Planned Duration minus At Completion Duration.

Value Derived From : Dim_W_ACTIVITY_D_Activity.DURATION_VARIANCE

Activity

Durations - (Activity)

Variance - Baseline Project Finish Date

Dimension

The duration between the current project finish date and the baseline project finish date. Calculated as Finish minus Baseline Project Finish.

Value Derived From : Dim_W_ACTIVITY_D_Activity.FINISH_DATE_VARIANCE

Activity

Durations - (Activity)

Variance - Baseline Project Start Date

Dimension

The duration between the current project start date and the baseline start date. Calculated as Start minus Baseline Project Start.

Value Derived From : Dim_W_ACTIVITY_D_Activity.START_DATE_VARIANCE

Activity

General - (Activity)

Activity ID

Dimension

A short ID which uniquely identifies the activity within the project.

Value Derived From : Dim_W_ACTIVITY_D_Activity.ACTIVITY_ID

Activity

General - (Activity)

Activity Name

Dimension

The name of the activity. The activity name does not have to be unique.

Value Derived From : Dim_W_ACTIVITY_D_Activity.ACTIVITY_NAME

Activity

General - (Activity)

Activity Owner

Dimension

User who owns the activity

Value Derived From : Dim_W_ACTIVITY_D_Activity.ACTIVITY_OWNER

Activity

General - (Activity)

Activity Status

Dimension

The current status of the activity, either Not Started, In Progress, or Completed.

Value Derived From : Dim_W_ACTIVITY_D_Activity.ACTIVITY_STATUS

Activity

General - (Activity)

Activity Type

Dimension

The type of activity, either 'Task Dependent', 'Resource Dependent', 'Level of Effort', 'Start Milestone' or 'Finish Milestone'. A Task Dependent activity is scheduled using the activity's calendar rather than the calendars of the assigned resources. A Resource Dependent activity is scheduled using the calendars of the assigned resources. This type is used when several resources are assigned to the activity, but they may work separately. A Start/Finish Milestone is a zero-duration activity, marking a significant start/end of project event. A Level of Effort activity has a duration which is determined by its dependent activities. Administration-type activities are typically level of effort.

Value Derived From : Dim_W_ACTIVITY_D_Activity.ACTIVITY_TYPE

Activity

General - (Activity)

Auto Compute Actuals

Dimension

Identifies whether the actual and remaining units, start date, finish date, and percent complete for the activity are computed automatically using the planned dates, budgeted units and the activity's schedule percent complete. If this option is selected, the actual/remaining units and actual dates are automatically updated when project actuals are applied. This assumes that all work for the activity proceeds according to plan.

Value Derived From : Dim_W_ACTIVITY_D_Activity.AUTO_COMPUTE_ACTUALS_FLAG

Activity

General - (Activity)

Calendar Name

Dimension

The calendar assigned to the activity. Activity calendars can be assigned from the global calendar pool or the project calendar pool.

Value Derived From : Dim_W_ACTIVITY_D_Activity.CALENDAR_NAME

Activity

General - (Activity)

Criticality Index

Dimension

Criticality Index

Value Derived From : Dim_W_ACTIVITY_D_Activity.CRITICALITY_INDEX

Activity

General - (Activity)

Duration Type

Dimension

The duration type of the activity. One of Fixed Units per Time, Fixed Duration, or Fixed Units. For Fixed Units per Time activities, the resource units per time are constant when the activity duration or units are changed. This type is used when an activity has fixed resources with fixed productivity output per time period. For Fixed Duration activities, the activity duration is constant as the units or resource units per time are changed. This type is used when the activity is to be completed within a fixed time period regardless of the resources assigned. For Fixed Units activities, the activity units are constant when the duration or resource units per time are changed. This type is used when the total amount of work is fixed, and increasing the resources can decrease the activity duration.

Value Derived From : Dim_W_ACTIVITY_D_Activity.DURATION_TYPE

Activity

General - (Activity)

Critical

Dimension

Indicates whether the activity is critical. An activity is critical when its Total Float is below the critical duration specified for the project. Delaying critical activities will delay the finish date of the project.

Value Derived From : Dim_W_ACTIVITY_D_Activity.IS_CRITICAL

Activity

General - (Activity)

Longest Path

Dimension

Indicates whether an activity is on the longest path. The longest path is defined as activities that are on the critical path and determine the end date of the project. Defining critical activities based on the longest path in the project provides an alternative to viewing critical activities based on float.

Value Derived From : Dim_W_ACTIVITY_D_Activity.IS_LONGEST_PATH

Activity

General - (Activity)

Activity Leveling Priority

Dimension

The activity priority can be used to prioritize activities in a project when performing resource leveling.

Value Derived From : Dim_W_ACTIVITY_D_Activity.LEVELING_PRIORITY

Activity

General - (Activity)

Percent Complete Type

Dimension

The activity percent complete type is one of Duration, Units, or Physical. The percent complete type controls whether the Activity % Complete is tied to the Duration % Complete, the Units % Complete, or the Physical % Complete for the activity. Set the percent complete type to Duration for activities which are duration driven, for example, administration tasks and training classes. Set the percent complete type to Physical for activities which are work-product driven, for example, creating a document or a product. Set the percent complete type to Units for activities which are work effort driven, for example, providing a consulting service.

Value Derived From : Dim_W_ACTIVITY_D_Activity.COMPLETE_PCT_TYPE

Activity

General - (Activity)

Primary Constraint

Dimension

The type of constraint applied to the activity start or finish date. Activity constraints are used by the project scheduler. Start date constraints are 'Start On', 'Start On or Before', 'Start On or After' and 'Mandatory Start'. Finish date constraints are 'Finish On', 'Finish On or Before', 'Finish On or After' and 'Mandatory Finish'. Another type of constraint, 'As Late as Possible', schedules the activity as late as possible based on the available free float.

Value Derived From : Dim_W_ACTIVITY_D_Activity.PRIMARY_CONSTRAINT_TYPE

Activity

General - (Activity)

Primary Resource

Dimension

The primary resource for the activity. The primary resource is responsible for the overall work on the activity and updates the activity status using Progress Reporter.

Value Derived From : Dim_W_ACTIVITY_D_Activity.PRIMARY_RESOURCE_NAME

Activity

General - (Activity)

Secondary Constraint

Dimension

The second type of constraint applied to the activity start or finish date.

Value Derived From : Dim_W_ACTIVITY_D_Activity.SECONDARY_CONSTRAINT_TYPE

Activity

General - (Activity)

WBS Code

Dimension

The Work Breakdown Structure Code for the activity

Value Derived From : Dim_W_ACTIVITY_D_Activity.WBS_CODE

Activity

General - (Activity)

WBS Name

Dimension

The Work Breakdown Structure Name for the activity

Value Derived From : Dim_W_ACTIVITY_D_Activity.WBS_NAME

Activity

Location - (Activity)

Address Line 1

Dimension

The first line of the address

Value Derived From : Dim_W_ACTIVITY_D_Activity.ADDRESS_LINE1

Activity

Location - (Activity)

Address Line 2

Dimension

The second line of the address

Value Derived From : Dim_W_ACTIVITY_D_Activity.ADDRESS_LINE2

Activity

Location - (Activity)

City Name

Dimension

The city name for this Location

Value Derived From : Dim_W_ACTIVITY_D_Activity.CITY_NAME

Activity

Location - (Activity)

Country Code

Dimension

The country code for this Location

Value Derived From : Dim_W_ACTIVITY_D_Activity.COUNTRY_CODE

Activity

Location - (Activity)

Country Name

Dimension

The country name for this Location

Value Derived From : Dim_W_ACTIVITY_D_Activity.COUNTRY_NAME

Activity

Location - (Activity)

Latitude

Dimension

The latitude for this Location

Value Derived From : Dim_W_ACTIVITY_D_Activity.LATITUDE

Activity

Location - (Activity)

Location Name

Dimension

The name of the location

Value Derived From : Dim_W_ACTIVITY_D_Activity.LOCATION_NAME

Activity

Location - (Activity)

Location Type

Dimension

Location Type

Value Derived From : Dim_W_ACTIVITY_D_Activity.LOCATION_TYPE

Activity

Location - (Activity)

Longitude

Dimension

The longitude for this Location

Value Derived From : Dim_W_ACTIVITY_D_Activity.LONGITUDE

Activity

Location - (Activity)

Municipality Name

Dimension

The municipality name for this Location

Value Derived From : Dim_W_ACTIVITY_D_Activity.MUNICIPALITY_NAME

Activity

Location - (Activity)

Postal Code

Dimension

The postal code for this Location

Value Derived From : Dim_W_ACTIVITY_D_Activity.POSTAL_CODE

Activity

Location - (Activity)

State/Province Code

Dimension

The state abbreviation for this Location

Value Derived From : Dim_W_ACTIVITY_D_Activity.STATE_CODE

Activity

Location - (Activity)

State/Province Name

Dimension

The state name for this Location

Value Derived From : Dim_W_ACTIVITY_D_Activity.STATE_NAME

Activity

Multiple Float Paths - (Activity)

Float Path

Dimension

The project scheduler determines the most critical and sub-critical paths. The float path field identifies the critical path that each activity is on. The number starts from 1 (where 1 is most critical) to the max number of float paths identified by the scheduler. This field is used when determining multiple float paths using the Free Float and Total Float method.

Value Derived From : Dim_W_ACTIVITY_D_Activity.FLOAT_PATH

Activity

Multiple Float Paths - (Activity)

Float Path Order

Dimension

This field is computed by the project scheduler and identifies the order in which the activities were processed within the float path.

Value Derived From : Dim_W_ACTIVITY_D_Activity.FLOAT_PATH_ORDER

Activity

Notebooks - (Activity)

Create Date

Dimension

The date the notebook topic was created

Value Derived From : Dim_W_ACTIVITY_NOTE_D_Activity_Note.W_CREATE_DT

Activity

Notebooks - (Activity)

Create User

Dimension

The user that created the notebook topic

Value Derived From : Dim_W_ACTIVITY_NOTE_D_Activity_Note.W_CREATE_USER

Activity

Notebooks - (Activity)

Notebook Topic Name

Dimension

The name of the notebook topic

Value Derived From : Dim_W_ACTIVITY_NOTE_D_Activity_Note.NOTEBOOK_TOPIC_NAME

Activity

Notebooks - (Activity)

Notebook Text

Lookup

The text of the notebook topic

Value Derived From : LOOKUP(DENSE "P6Core"."Lookup - Activity Note"."Raw Text", "P6Core"."Dim - Activity Note"."Note Key", "P6Core"."Dim - Activity Note"."Activity Key")

Activity

Notebooks - (Activity)

Update Date

Dimension

The date the notebook topic was updated

Value Derived From : Dim_W_ACTIVITY_NOTE_D_Activity_Note.W_UPDATE_DT

Activity

Notebooks - (Activity)

Update User

Dimension

The last user to update notebook topic

Value Derived From : Dim_W_ACTIVITY_NOTE_D_Activity_Note.W_UPDATE_USER

Activity

Steps - (Activity)

Activity Step Object ID

Dimension

The Unique ID of the activity step

Value Derived From Physical Mapping: Dim_W_ACTIVITY_STEP_D_Activity_Step.ACTIVITY_STEP_OBJECT_ID

Activity

Steps - (Activity)

Step Name

Dimension

The name of the step

Value Derived From Physical Mapping: Dim_W_ACTIVITY_STEP_D_Activity_Step.STEP_NAME

Activity

Steps - (Activity)

Step Weight

Dimension

Step weight determines the importance of this step in relation to other steps assigned to the activity.

Value Derived From Physical Mapping: Dim_W_ACTIVITY_STEP_D_Activity_Step.STEP_WEIGHT

Activity

Steps - (Activity)

Weight Complete

Dimension

Step weight associated percent complete.

Value Derived From Physical Mapping: Dim_W_ACTIVITY_STEP_D_Activity_Step.WEIGHT_COMPLETE

Activity

Steps - (Activity)

Step Percent Complete

Dimension

The percent complete of this specific step. This is manually entered.

Value Derived From Physical Mapping: Dim_W_ACTIVITY_STEP_D_Activity_Step.STEP_PERCENT_COMPLETE

Activity

Percent Completes - (Activity)

Duration % Of Planned

Dimension

The percent complete of the activity duration. Computed as (Planned Duration - Remaining Duration)/Original Duration * 100. Always in the range 0 to 100. The Planned Duration is taken from the current plan, not from the baseline.

Value Derived From : Dim_W_ACTIVITY_D_Activity.DURATION_PCT_OF_PLANNED

Activity

Percent Completes - (Activity)

Duration % Complete

Dimension

The percent complete of the activity duration. Computed as (Original Duration - Remaining Duration)/Original Duration * 100. Always in the range 0 to 100. The Original Duration is taken from the current plan, not from the baseline.

Value Derived From : Dim_W_ACTIVITY_D_Activity.DURATION_PCT_COMPLETE

Activity

Percent Completes - (Activity)

Expense Cost % Complete

Dimension

Percent complete of cost for all expenses associated with an activity. Computed as Actual Expense Cost / At Completion Expense Cost* 100. Always in the range 0 to 100.

Value Derived From : Dim_W_ACTIVITY_D_Activity.EXPENSE_COST_PCT_COMPLETE

Activity

Percent Completes - (Activity)

Labor Units % Complete

Dimension

The percent complete of units for all labor resources for the activity. Computed as Actual Labor Units / At Completion Labor Units * 100. Always in the range 0 to 100.

Value Derived From : Dim_W_ACTIVITY_D_Activity.LABOR_UNITS_PCT_COMPLETE

Activity

Percent Completes - (Activity)

Nonlabor Cost % Complete

Dimension

The percent complete of cost for all nonlabor resources assigned to the activity. Computed as Actual Nonlabor Cost / At Completion Nonlabor Cost * 100. Always in the range 0 to 100.

Value Derived From : Dim_W_ACTIVITY_D_Activity.NONLABOR_COST_PCT_COMPLETE

Activity

Percent Completes - (Activity)

Nonlabor Units % Complete

Dimension

The percent complete of units for all nonlabor resources for the activity. Computed as Actual Nonlabor Units / At Completion Nonlabor Units * 100. Always in the range 0 to 100.

Value Derived From : Dim_W_ACTIVITY_D_Activity.NONLABOR_UNITS_PCT_COMPLETE

Activity

Percent Completes - (Activity)

Percent Complete

Dimension

The activity percent complete. This value is tied to the activity Duration % Complete, Units % Complete, or Physical % Complete, depending on the setting for the activity's Percent Complete Type, which is one of Duration, Units, or Physical. Always in the range 0 to 100.

Value Derived From : Dim_W_ACTIVITY_D_Activity.PERCENT_COMPLETE

Activity

Percent Completes - (Activity)

Performance % Complete

Dimension

The activity performance percent complete. The performance percent complete is used to compute earned value and may be based on the Activity % Complete, on the 0/100 rule, on the 50/50 rule, etc., depending on the technique for computing earned-value percent complete for the activity's WBS. The Performance % Complete specifies what percentage of the activity's planned worth has been earned so far.

Value Derived From : Dim_W_ACTIVITY_D_Activity.PERFORMANCE_PCT_COMPLETE

Activity

Percent Completes - (Activity)

Physical % Complete

Dimension

The physical percent complete can either be user entered or calculated from the activity's weighted steps. There is a project setting specifying this.

Value Derived From : Dim_W_ACTIVITY_D_Activity.PHYSICAL_PCT_COMPLETE

Activity

Percent Completes - (Activity)

Schedule % Complete

Dimension

The activity schedule percent complete. The Schedule % Complete specifies how much of the activity's baseline duration has been completed so far. Computed based on where the current data date falls between the activity's baseline start and finish dates. If the data date is earlier than the baseline Start, the Schedule % Complete is 0. If the data date is later than the baseline Finish, the Schedule % Complete is 100. The Schedule % Complete indicates how much of the activity duration should be currently completed, relative to the selected baseline.

Value Derived From : Dim_W_ACTIVITY_D_Activity.SCHEDULE_PCT_COMPLETE

Activity

Percent Completes - (Activity)

Units % Complete

Dimension

The percent complete of units for all labor and nonlabor resources assigned to the activity. Computed as Actual Units / At Completion Units * 100. Always in the range 0 to 100.

Value Derived From : Dim_W_ACTIVITY_D_Activity.UNITS_PCT_COMPLETE

Activity

Relationships - (Activity)

 

 

Relationships Activity Information

 

Activity

Relationships - (Activity)

Lag

Dimension

The lag assigned to the relationship.

Value Derived From : Dim_W_RELATIONSHIP_D_Relationship.LAG

Activity

Relationships - (Activity)

Predecessor Activity ID

Dimension

The ID of the predecessor activity.

Value Derived From : Dim_W_RELATIONSHIP_D_Relationship.PRED_ACT_ID

Activity

Relationships - (Activity)

Predecessor Activity Name

Dimension

The name of the predecessor activity.

Value Derived From : Dim_W_RELATIONSHIP_D_Relationship.PRED_ACT_NAME

Activity

Relationships - (Activity)

Relationship Type

Dimension

The relationship type (Finish to Start, Start to Start, etc.).

Value Derived From : Dim_W_RELATIONSHIP_D_Relationship.RELATIONSHIP_TYPE

Activity

Relationships - (Activity)

Successor Activity ID

Dimension

The ID of the successor activity.

Value Derived From : Dim_W_RELATIONSHIP_D_Relationship.SUCC_ACT_ID

Activity

Relationships - (Activity)

Successor Activity Name

Dimension

The name of the successor activity.

Value Derived From : Dim_W_RELATIONSHIP_D_Relationship.SUCC_ACT_NAME

Activity

Relationships - (Activity)

Type

Dimension

The type of the activity based on the relationship (predecessor, successor, or orphan).

Value Derived From : Dim_W_RELATIONSHIP_D_Relationship.TYPE

 

 

 

 

 

 

EPS Folder

 

 

 

 

 

EPS

 

EPS Id Level 1

Dimension

EPS Id Level 1

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV1

EPS

 

EPS Id Level 10

Dimension

EPS Id Level 10

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV10

EPS

 

EPS Id Level 11

Dimension

EPS Id Level 11

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV11

EPS

 

EPS Id Level 12

Dimension

EPS Id Level 12

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV12

EPS

 

EPS Id Level 13

Dimension

EPS Id Level 13

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV13

EPS

 

EPS Id Level 14

Dimension

EPS Id Level 14

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV14

EPS

 

EPS Id Level 15

Dimension

EPS Id Level 15

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV15

EPS

 

EPS Id Level 16

Dimension

EPS Id Level 16

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV16

EPS

 

EPS Id Level 17

Dimension

EPS Id Level 17

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV17

EPS

 

EPS Id Level 2

Dimension

EPS Id Level 2

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV2

EPS

 

EPS Id Level 3

Dimension

EPS Id Level 3

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV3

EPS

 

EPS Id Level 4

Dimension

EPS Id Level 4

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV4

EPS

 

EPS Id Level 5

Dimension

EPS Id Level 5

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV5

EPS

 

EPS Id Level 6

Dimension

EPS Id Level 6

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV6

EPS

 

EPS Id Level 7

Dimension

EPS Id Level 7

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV7

EPS

 

EPS Id Level 8

Dimension

EPS Id Level 8

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV8

EPS

 

EPS Id Level 9

Dimension

EPS Id Level 9

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_ID_LV9

EPS

 

EPS Name Level 1

Dimension

EPS Name Level 1

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV1

EPS

 

EPS Name Level 10

Dimension

EPS Name Level 10

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV10

EPS

 

EPS Name Level 11

Dimension

EPS Name Level 11

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV11

EPS

 

EPS Name Level 12

Dimension

EPS Name Level 12

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV12

EPS

 

EPS Name Level 13

Dimension

EPS Name Level 13

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV13

EPS

 

EPS Name Level 14

Dimension

EPS Name Level 14

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV14

EPS

 

EPS Name Level 15

Dimension

EPS Name Level 15

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV15

EPS

 

EPS Name Level 16

Dimension

EPS Name Level 16

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV16

EPS

 

EPS Name Level 17

Dimension

EPS Name Level 17

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV17

EPS

 

EPS Name Level 2

Dimension

EPS Name Level 2

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV2

EPS

 

EPS Name Level 3

Dimension

EPS Name Level 3

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV3

EPS

 

EPS Name Level 4

Dimension

EPS Name Level 4

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV4

EPS

 

EPS Name Level 5

Dimension

EPS Name Level 5

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV5

EPS

 

EPS Name Level 6

Dimension

EPS Name Level 6

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV6

EPS

 

EPS Name Level 7

Dimension

EPS Name Level 7

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV7

EPS

 

EPS Name Level 8

Dimension

EPS Name Level 8

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV8

EPS

 

EPS Name Level 9

Dimension

EPS Name Level 9

Value Derived From : Dim_W_EPS_HIERARCHY_D_EpsHier.EPS_NAME_LV9

 

 

 

 

 

 

EPS

Notebooks - (EPS)

Create Date

Dimension

The date the notebook topic was created

Value Derived From Physical Mapping: Dim_W_EPS_NOTE_D_EPS_Note.W_CREATE_DT

EPS

Notebooks - (EPS)

Create User

Dimension

The user that created the notebook topic

Value Derived From Physical Mapping: Dim_W_EPS_NOTE_D_EPS_Note.W_CREATE_USER

EPS

Notebooks - (EPS)

Notebook Text

Dimension

The text of the notebook topic

Value Derived From Physical Mapping: Dim_W_EPS_NOTE_D_EPS_Note.NOTEBOOK_TOPIC_NAME

EPS

Notebooks - (EPS)

Notebook Topic Name

Dimension

The name of the notebook topic

Value Derived From existing columns using expression: "P6Core"."Lookup - EPS Note"."Raw Text" "P6Core"."Dim - EPS Note"."Note Key" "P6Core"."Dim - EPS Note"."EPS Key"

EPS

Notebooks - (EPS)

Update Date

Dimension

The date the notebook topic was updated

Value Derived From Physical Mapping: Dim_W_EPS_NOTE_D_EPS_Note.W_UPDATE_DT

EPS

Notebooks - (EPS)

Update User

Dimension

The last user to update notebook topic

Value Derived From Physical Mapping: Dim_W_EPS_NOTE_D_EPS_Note.W_UPDATE_USER

 

 

 

 

 

 

Expense Folder

 

 

 

 

 

Expense

 

Accrual Type

Dimension

The accrual type of the expense. Valid values are 'Start of Activity', 'End of Activity', and 'Uniform over Activity'.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.ACCRUAL_TYPE

Expense

 

Actual Cost

Dimension

The actual cost of the expense.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.ACTUAL_COST

Expense

 

Actual Units

Dimension

The actual units for the expense.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.ACTUAL_UNITS

Expense

 

At Completion Cost

Dimension

The at completion cost of the expense.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.AT_COMPLETION_COST

Expense

 

At Completion Units

Dimension

The at completion units for the expense.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.AT_COMPLETION_UNITS

Expense

 

Auto Compute

Dimension

Identifies whether the percent complete and actual/remaining units and costs for the expense are computed automatically using the status and percent complete of the associated activity. If this option is selected, the percent complete and actual/remaining units and costs are automatically updated when project actuals are applied.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.AUTO_COMPUTE

Expense

 

CBS Code

Dimension

The full cost code associated with the expense.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.CBS_CODE

Expense

 

CBS Name

Dimension

The name of the cost code associated with the expense.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.CBS_NAME

Expense

 

Cost Account ID

Dimension

The ID of the cost account associated with the expense.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.COST_ACCOUNT_ID

Expense

 

Cost Account Name

Dimension

The name of the cost account associated with the expense.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.COST_ACCOUNT_NAME

Expense

 

Document Number

Dimension

The document number for the expense.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.DOCUMENT_NUMBER

Expense

 

Expense Category Name

Dimension

The category name of the expense.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.EXPENSE_CAT_NAME

Expense

 

Expense Item

Dimension

The name of the expense

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.EXPENSE_ITEM

Expense

 

Unique Expense ID

Dimension

The unique ID of the expense

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.ACTIVITY_EXPENSE_OBJECT_ID

Expense

 

Expense Percent Complete

Dimension

The percent complete for the expense.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.EXPENSE_PERCENT_COMPLETE

Expense

 

Over Budget

Dimension

Identifies whether actual cost exceeds the budgeted cost for the expense.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.OVER_BUDGET

Expense

 

Planned Cost

Dimension

The planned cost of the expense.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.PLANNED_COST

Expense

 

Planned Units

Dimension

The planned units for the expense.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.PLANNED_UNITS

Expense

 

Price Per Unit

Dimension

The price per unit for the expense.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.PRICE_PER_UNIT

Expense

 

Remaining Cost

Dimension

The remaining cost of the expense.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.REMAINING_COST

Expense

 

Remaining Units

Dimension

The remaining units for the expense.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.REMAINING_UNITS

Expense

 

Unit Of Measure

Dimension

The unit of measure for the expense.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.UNIT_OF_MEASURE

Expense

 

Vendor Name

Dimension

The name of the vendor associated with the expense.

Value Derived From : Dim_W_ACTIVITY_EXPENSE_D_Activity_Expense.VENDOR_NAME

 

 

 

 

 

 

Resource Folder

 

 

 

 

 

Resource

General - (Resource)

Active

Dimension

Indicates whether the resource is currently active. Nonactive resources may have left the organization but are not deleted from the system since they may have actual hours.

Value Derived From : Dim_W_RESOURCE_D_Resource.ACTIVE_FLAG

Resource

General - (Resource)

Datasource Id

Dimension

A unique source Id created for the Primavera data source being used. Used to identify data sources when using multiple Primavera data sources.

Value Derived From : Dim_W_RESOURCE_D_Resource.DATASOURCE_ID

Resource

General - (Resource)

Primary Role Name

Dimension

The name of the role that is assigned as the resource's primary role

Value Derived From : Dim_W_RESOURCE_D_Resource.PRIMARY_ROLE_NAME

Resource

General - (Resource)

Unique Primary Role Id

Dimension

The unique Id of the role that is assigned as the resource's primary role

Value Derived From : Dim_W_RESOURCE_D_Resource.PRIMARY_ROLE_OBJECT_ID

Resource

General - (Resource)

Primary Resource ID

Dimension

A short code which uniquely identifies the resource

Value Derived From : Dim_W_RESOURCE_D_Resource.RESOURCE_ID

Resource

General - (Resource)

Primary Resource Name

Dimension

The name of the resource

Value Derived From : Dim_W_RESOURCE_D_Resource.RESOURCE_NAME

Resource

General - (Resource)

Title

Dimension

The title of the resource

Value Derived From : Dim_W_RESOURCE_D_Resource.RESOURCE_TITLE

Resource

General - (Resource)

Resource Type

Dimension

Indicates whether the resource is labor, nonlabor, or material

Value Derived From : Dim_W_RESOURCE_D_Resource.RESOURCE_TYPE

Resource

Location - (Resource)

Address Line 1

Dimension

The first line of the address

Value Derived From : Dim_W_RESOURCE_D_Resource.ADDRESS_LINE1

Resource

Location - (Resource)

Address Line 2

Dimension

The second line of the address

Value Derived From : Dim_W_RESOURCE_D_Resource.ADDRESS_LINE2

Resource

Location - (Resource)

City Name

Dimension

The city name for this Location

Value Derived From : Dim_W_RESOURCE_D_Resource.CITY_NAME

Resource

Location - (Resource)

Country Code

Dimension

The country code for this Location

Value Derived From : Dim_W_RESOURCE_D_Resource.COUNTRY_CODE

Resource

Location - (Resource)

Country Name

Dimension

The country name for this Location

Value Derived From : Dim_W_RESOURCE_D_Resource.COUNTRY_NAME

Resource

Location - (Resource)

Latitude

Dimension

The latitude for this Location

Value Derived From : Dim_W_RESOURCE_D_Resource.LATITUDE

Resource

Location - (Resource)

Location Name

Dimension

The name of the location

Value Derived From : Dim_W_RESOURCE_D_Resource.LOCATION_NAME

Resource

Location - (Resource)

Location Type

Dimension

Location Type

Value Derived From : Dim_W_RESOURCE_D_Resource.LOCATION_TYPE

Resource

Location - (Resource)

Longitude

Dimension

The longitude for this Location

Value Derived From : Dim_W_RESOURCE_D_Resource.LONGITUDE

Resource

Location - (Resource)

Municipality Name

Dimension

The municipality name for this Location

Value Derived From : Dim_W_RESOURCE_D_Resource.MUNICIPALITY_NAME

Resource

Location - (Resource)

Postal Code

Dimension

The postal code for this Location

Value Derived From : Dim_W_RESOURCE_D_Resource.POSTAL_CODE

Resource

Location - (Resource)

State/Province Code

Dimension

The state abbreviation for this Location

Value Derived From : Dim_W_RESOURCE_D_Resource.STATE_CODE

Resource

Location - (Resource)

State/Province Name

Dimension

The state name for this Location

Value Derived From : Dim_W_RESOURCE_D_Resource.STATE_NAME

Resource

Resource Hierarchy - (Resource)

 

Dimension

Resource Hierarchy

 

Resource

Resource Hierarchy - (Resource)

Full Path Name

Dimension

Full Path Name

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.FULL_PATH_NAME

Resource

Resource Hierarchy - (Resource)

Resource ID

Dimension

Resource ID

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID

Resource

Resource Hierarchy - (Resource)

Resource ID Level 1

Dimension

Resource ID Level 1

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV1

Resource

Resource Hierarchy - (Resource)

Resource ID Level 10

Dimension

Resource ID Level 10

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV10

Resource

Resource Hierarchy - (Resource)

Resource ID Level 11

Dimension

Resource ID Level 11

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV11

Resource

Resource Hierarchy - (Resource)

Resource ID Level 12

Dimension

Resource ID Level 12

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV12

Resource

Resource Hierarchy - (Resource)

Resource ID Level 13

Dimension

Resource ID Level 13

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV13

Resource

Resource Hierarchy - (Resource)

Resource ID Level 14

Dimension

Resource ID Level 14

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV14

Resource

Resource Hierarchy - (Resource)

Resource ID Level 15

Dimension

Resource ID Level 15

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV15

Resource

Resource Hierarchy - (Resource)

Resource ID Level 16

Dimension

Resource ID Level 16

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV16

Resource

Resource Hierarchy - (Resource)

Resource ID Level 17

Dimension

Resource ID Level 17

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV17

Resource

Resource Hierarchy - (Resource)

Resource ID Level 18

Dimension

Resource ID Level 18

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV18

Resource

Resource Hierarchy - (Resource)

Resource ID Level 19

Dimension

Resource ID Level 19

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV19

Resource

Resource Hierarchy - (Resource)

Resource ID Level 2

Dimension

Resource ID Level 2

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV2

Resource

Resource Hierarchy - (Resource)

Resource ID Level 20

Dimension

Resource ID Level 20

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV20

Resource

Resource Hierarchy - (Resource)

Resource ID Level 21

Dimension

Resource ID Level 21

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV21

Resource

Resource Hierarchy - (Resource)

Resource ID Level 22

Dimension

Resource ID Level 22

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV22

Resource

Resource Hierarchy - (Resource)

Resource ID Level 23

Dimension

Resource ID Level 23

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV23

Resource

Resource Hierarchy - (Resource)

Resource ID Level 24

Dimension

Resource ID Level 24

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV24

Resource

Resource Hierarchy - (Resource)

Resource ID Level 3

Dimension

Resource ID Level 3

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV3

Resource

Resource Hierarchy - (Resource)

Resource ID Level 4

Dimension

Resource ID Level 4

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV4

Resource

Resource Hierarchy - (Resource)

Resource ID Level 5

Dimension

Resource ID Level 5

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV5

Resource

Resource Hierarchy - (Resource)

Resource ID Level 6

Dimension

Resource ID Level 6

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV6

Resource

Resource Hierarchy - (Resource)

Resource ID Level 7

Dimension

Resource ID Level 7

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV7

Resource

Resource Hierarchy - (Resource)

Resource ID Level 8

Dimension

Resource ID Level 8

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV8

Resource

Resource Hierarchy - (Resource)

Resource ID Level 9

Dimension

Resource ID Level 9

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_ID_LV9

Resource

Resource Hierarchy - (Resource)

Resource Level

Dimension

Resource Level

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.LVL

Resource

Resource Hierarchy - (Resource)

Resource Name

Dimension

Resource Name

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME

Resource

Resource Hierarchy - (Resource)

Resource Name Level 1

Dimension

Resource Name Level 1

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV1

Resource

Resource Hierarchy - (Resource)

Resource Name Level 10

Dimension

Resource Name Level 10

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV10

Resource

Resource Hierarchy - (Resource)

Resource Name Level 11

Dimension

Resource Name Level 11

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV11

Resource

Resource Hierarchy - (Resource)

Resource Name Level 12

Dimension

Resource Name Level 12

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV12

Resource

Resource Hierarchy - (Resource)

Resource Name Level 13

Dimension

Resource Name Level 13

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV13

Resource

Resource Hierarchy - (Resource)

Resource Name Level 14

Dimension

Resource Name Level 14

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV14

Resource

Resource Hierarchy - (Resource)

Resource Name Level 15

Dimension

Resource Name Level 15

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV15

Resource

Resource Hierarchy - (Resource)

Resource Name Level 16

Dimension

Resource Name Level 16

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV16

Resource

Resource Hierarchy - (Resource)

Resource Name Level 17

Dimension

Resource Name Level 17

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV17

Resource

Resource Hierarchy - (Resource)

Resource Name Level 18

Dimension

Resource Name Level 18

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV18

Resource

Resource Hierarchy - (Resource)

Resource Name Level 19

Dimension

Resource Name Level 19

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV19

Resource

Resource Hierarchy - (Resource)

Resource Name Level 2

Dimension

Resource Name Level 2

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV2

Resource

Resource Hierarchy - (Resource)

Resource Name Level 20

Dimension

Resource Name Level 20

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV20

Resource

Resource Hierarchy - (Resource)

Resource Name Level 21

Dimension

Resource Name Level 21

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV21

Resource

Resource Hierarchy - (Resource)

Resource Name Level 22

Dimension

Resource Name Level 22

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV22

Resource

Resource Hierarchy - (Resource)

Resource Name Level 23

Dimension

Resource Name Level 23

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV23

Resource

Resource Hierarchy - (Resource)

Resource Name Level 24

Dimension

Resource Name Level 24

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV24

Resource

Resource Hierarchy - (Resource)

Resource Name Level 3

Dimension

Resource Name Level 3

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV3

Resource

Resource Hierarchy - (Resource)

Resource Name Level 4

Dimension

Resource Name Level 4

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV4

Resource

Resource Hierarchy - (Resource)

Resource Name Level 5

Dimension

Resource Name Level 5

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV5

Resource

Resource Hierarchy - (Resource)

Resource Name Level 6

Dimension

Resource Name Level 6

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV6

Resource

Resource Hierarchy - (Resource)

Resource Name Level 7

Dimension

Resource Name Level 7

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV7

Resource

Resource Hierarchy - (Resource)

Resource Name Level 8

Dimension

Resource Name Level 8

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV8

Resource

Resource Hierarchy - (Resource)

Resource Name Level 9

Dimension

Resource Name Level 9

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_NAME_LV9

Resource

Resource Hierarchy - (Resource)

Resource Unique ID

Dimension

Resource Unique ID

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 1

Dimension

Resource Unique ID Level 1

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV1

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 10

Dimension

Resource Unique ID Level 10

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV10

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 11

Dimension

Resource Unique ID Level 11

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV11

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 12

Dimension

Resource Unique ID Level 12

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV12

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 13

Dimension

Resource Unique ID Level 13

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV13

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 14

Dimension

Resource Unique ID Level 14

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV14

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 15

Dimension

Resource Unique ID Level 15

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV15

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 16

Dimension

Resource Unique ID Level 16

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV16

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 17

Dimension

Resource Unique ID Level 17

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV17

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 18

Dimension

Resource Unique ID Level 18

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV18

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 19

Dimension

Resource Unique ID Level 19

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV19

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 2

Dimension

Resource Unique ID Level 2

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV2

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 20

Dimension

Resource Unique ID Level 20

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV20

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 21

Dimension

Resource Unique ID Level 21

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV21

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 22

Dimension

Resource Unique ID Level 22

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV22

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 23

Dimension

Resource Unique ID Level 23

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV23

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 24

Dimension

Resource Unique ID Level 24

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV24

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 3

Dimension

Resource Unique ID Level 3

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV3

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 4

Dimension

Resource Unique ID Level 4

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV4

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 5

Dimension

Resource Unique ID Level 5

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV5

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 6

Dimension

Resource Unique ID Level 6

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV6

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 7

Dimension

Resource Unique ID Level 7

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV7

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 8

Dimension

Resource Unique ID Level 8

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV8

Resource

Resource Hierarchy - (Resource)

Resource Unique ID Level 9

Dimension

Resource Unique ID Level 9

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.RESOURCE_OBJECT_ID_LV9

Resource

Resource Hierarchy - (Resource)

Root Level Resource ID

Dimension

Root Level Resource ID

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.ROOT_LEVEL_RESOURCE_ID

Resource

Resource Hierarchy - (Resource)

Root Level Resource Name

Dimension

Root Level Resource Name

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.ROOT_LEVEL_RESOURCE_NAME

Resource

Resource Hierarchy - (Resource)

Root Level Resource Unique ID

Dimension

Root Level Resource Unique ID

Value Derived From : Dim_W_RESOURCE_HIERARCHY_D_ResourceHierarchy.ROOT_LEVEL_RESOURCE_ID

 

 

 

 

 

 

Portfolio Folder

 

 

 

 

 

Portfolio

 

 

 

Portfolios consist of projects grouped together in a meaningful way. Portfolios are used to do project analysis across the enterprise.

 

Portfolio

 

Portfolio Description

Dimension

The description of the portfolio

Value Derived From : Dim_W_PROJECT_PORTFOLIO_D_Project_Portfolio.PROJECT_PORTFOLIO_DESCR

Portfolio

 

Portfolio Name

Dimension

The name of the portfolio

Value Derived From : Dim_W_PROJECT_PORTFOLIO_D_Project_Portfolio.PROJECT_PORTFOLIO_NAME

 

 

 

 

 

 

Risk Folder

 

 

 

 

 

Risk

 

 

 

Risks are any uncertain events or conditions that, if they occur, have a positive or negative effect on project objectives.

 

Risk

 

Added By

Dimension

The user the risk was last modified by

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.ADDED_BY

Risk

 

Added Date

Dimension

The date the risk was last modified

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.W_CREATE_DT

Risk

 

Risk Category

Dimension

The name for a particular type of risk classification

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.CATEGORY

Risk

 

Cause

Dimension

The Cause the risk was identified

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.CAUSE

Risk

 

Description

Dimension

The risk description

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.DESCRIPTION

Risk

 

Effect

Dimension

The Effect of the risk was identified

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.EFFECT

Risk

 

Risk Exposure

Dimension

The calculated exposure value for the risk

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.Exposure

Risk

 

Risk Exposure Finish

Dimension

Risk Exposure Finish Date

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.EXPOSURE_FINISH

Risk

 

Risk Exposure Start

Dimension

Risk Exposure Start Date

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.EXPOSURE_START

Risk

 

Identified By Resource Id

Dimension

The short code of the resource that identified the risk

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.IDENTIFIED_BY_RESOURCE_ID

Risk

 

Identified By Resource Name

Dimension

The name of the resource that identified the risk

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.IDENTIFIED_BY_RESOURCE_NAME

Risk

 

Identified Date

Dimension

The date the risk was identified

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.IDENTIFIED_DATE

Risk

 

Last Modified By

Dimension

The user the risk was last modified by

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.LAST_MODIFIED_BY

Risk

 

Last Modified Date

Dimension

The date the risk was last modified

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.W_UPDATE_DT

Risk

 

Owner

Dimension

The resource who has ownership of the risk

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.OWNER

Risk

 

Risk Id

Dimension

The unique ID of the associated risk

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.RISK_ID

Risk

 

Risk Name

Dimension

The name of the risk

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.RISK_NAME

Risk

 

Risk Status

Dimension

The current status of the Risk. Valid values are 'Proposed', 'Open', 'Rejected', 'Managed', and 'Impacted'.

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.RISK_STATUS

Risk

 

Risk Type

Dimension

Determines whether a risk is a threat or an opportunity. A threat will have a negative impact on your project, while an opportunity can have a perceived benefit to the project.

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.RISK_TYPE

Risk

 

Risk Score

Dimension

The calculated score value of the impact values assigned to the risk.

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.SCORE

Risk

 

Risk Score Color

Dimension

Risk Score Color

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.SCORE_COLOR

Risk

 

Risk Score Text

Dimension

Risk Score Text

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.SCORE_TEXT

Risk

 

Risk Total Cost

Dimension

The total estimated cost for the risk. If the risk has an associated response plan, the cost is calculated from the risk response actions for the response plan. Not available if user does not have View Project Costs-Financial privilege.

Value Derived From : Dim_W_ACTIVITY_RISK_D_Activity_Risk.TOTAL_COST

 

 

 

 

 

 

WBS Folder

 

 

 

 

 

WBS

WBS Hierarchy - (WBS)

Full Path Name

Dimension

Full path for wbs hierarchy

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.FULL_PATH_NAME

WBS

WBS Hierarchy - (WBS)

WBS Code (Project Level)

Dimension

A short code assigned to each WBS element for identification. Each WBS element is uniquely identified by concatenating its own code together with its parents codes

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.PROJ_LEVEL_SHORT_NAME

WBS

WBS Hierarchy - (WBS)

WBS Name (Project Level)

Dimension

The name of the WBS element

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.PROJ_LEVEL_NAME

WBS

WBS Hierarchy - (WBS)

WBS ID Level 1

Dimension

WBS ID Level 1

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV1

WBS

WBS Hierarchy - (WBS)

WBS ID Level 10

Dimension

WBS ID Level 10

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV10

WBS

WBS Hierarchy - (WBS)

WBS ID Level 11

Dimension

WBS ID Level 11

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV11

WBS

WBS Hierarchy - (WBS)

WBS ID Level 12

Dimension

WBS ID Level 12

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV12

WBS

WBS Hierarchy - (WBS)

WBS ID Level 13

Dimension

WBS ID Level 13

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV13

WBS

WBS Hierarchy - (WBS)

WBS ID Level 14

Dimension

WBS ID Level 14

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV14

WBS

WBS Hierarchy - (WBS)

WBS ID Level 15

Dimension

WBS ID Level 15

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV15

WBS

WBS Hierarchy - (WBS)

WBS ID Level 16

Dimension

WBS ID Level 16

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV16

WBS

WBS Hierarchy - (WBS)

WBS ID Level 17

Dimension

WBS ID Level 17

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV17

WBS

WBS Hierarchy - (WBS)

WBS ID Level 2

Dimension

WBS ID Level 2

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV2

WBS

WBS Hierarchy - (WBS)

WBS ID Level 3

Dimension

WBS ID Level 3

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV3

WBS

WBS Hierarchy - (WBS)

WBS ID Level 4

Dimension

WBS ID Level 4

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV4

WBS

WBS Hierarchy - (WBS)

WBS ID Level 5

Dimension

WBS ID Level 5

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV5

WBS

WBS Hierarchy - (WBS)

WBS ID Level 6

Dimension

WBS ID Level 6

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV6

WBS

WBS Hierarchy - (WBS)

WBS ID Level 7

Dimension

WBS ID Level 7

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV7

WBS

WBS Hierarchy - (WBS)

WBS ID Level 8

Dimension

WBS ID Level 8

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV8

WBS

WBS Hierarchy - (WBS)

WBS ID Level 9

Dimension

WBS ID Level 9

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_ID_LV9

WBS

WBS Hierarchy - (WBS)

WBS Name Level 1

Dimension

WBS Name Level 1

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV1

WBS

WBS Hierarchy - (WBS)

WBS Name Level 10

Dimension

WBS Name Level 10

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV10

WBS

WBS Hierarchy - (WBS)

WBS Name Level 11

Dimension

WBS Name Level 11

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV11

WBS

WBS Hierarchy - (WBS)

WBS Name Level 12

Dimension

WBS Name Level 12

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV12

WBS

WBS Hierarchy - (WBS)

WBS Name Level 13

Dimension

WBS Name Level 13

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV13

WBS

WBS Hierarchy - (WBS)

WBS Name Level 14

Dimension

WBS Name Level 14

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV14

WBS

WBS Hierarchy - (WBS)

WBS Name Level 15

Dimension

WBS Name Level 15

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV15

WBS

WBS Hierarchy - (WBS)

WBS Name Level 16

Dimension

WBS Name Level 16

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV16

WBS

WBS Hierarchy - (WBS)

WBS Name Level 17

Dimension

WBS Name Level 17

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV17

WBS

WBS Hierarchy - (WBS)

WBS Name Level 2

Dimension

WBS Name Level 2

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV2

WBS

WBS Hierarchy - (WBS)

WBS Name Level 3

Dimension

WBS Name Level 3

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV3

WBS

WBS Hierarchy - (WBS)

WBS Name Level 4

Dimension

WBS Name Level 4

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV4

WBS

WBS Hierarchy - (WBS)

WBS Name Level 5

Dimension

WBS Name Level 5

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV5

WBS

WBS Hierarchy - (WBS)

WBS Name Level 6

Dimension

WBS Name Level 6

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV6

WBS

WBS Hierarchy - (WBS)

WBS Name Level 7

Dimension

WBS Name Level 7

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV7

WBS

WBS Hierarchy - (WBS)

WBS Name Level 8

Dimension

WBS Name Level 8

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV8

WBS

WBS Hierarchy - (WBS)

WBS Name Level 9

Dimension

WBS Name Level9

Value Derived From : Dim_W_WBS_HIERARCHY_D_WbsHier.WBS_NAME_LV9

WBS

Notebooks - (WBS)

 

 

WBS level notebook topics.

 

WBS

Notebooks - (WBS)

Create Date

Dimension

The date the notebook topic was created

Value Derived From : The date the notebook topic was created

WBS

Notebooks - (WBS)

Create User

Dimension

The user that created the notebook topic

Value Derived From : The user that created the notebook topic

WBS

Notebooks - (WBS)

Notebook Text

Lookup

The text of the notebook topic

P6Core."Lookup - WBS Note"."Notebook Text"

WBS

Notebooks - (WBS)

Notebook Topic Name

Dimension

The name of the notebook topic

Value Derived From : The name of the notebook topic

WBS

Notebooks - (WBS)

Update Date

Dimension

The date the notebook topic was updated

Value Derived From : The date the notebook topic was updated

WBS

Notebooks - (WBS)

Update User

Dimension

The last user to update notebook topic

Value Derived From : The last user to update notebook topic

Related Topics

P6 EPPM Subject Areas

P6 - Activity History / Primavera - Activity History

P6 - Activity Period Actuals / Primavera - Activity Period Actuals

P6 - Burn Down / Primavera - Burn Down

P6 - Project History / Primavera - Project History

P6 - Resource Assignment / Primavera - Resource Assignment

P6 - Resource Assignment History / Primavera - Resource Assignment History

P6 - Resource Period Actuals / Primavera - Resource Period Actuals

P6 - Resource Utilization / Primavera - Resource Utilization

P6 - Role Utilization / Primavera - Role Utilization

P6 - Spread Snapshot History / Primavera - Spread Snapshot History

P6 - Work Planning / Primavera - Work Planning



Last Published Friday, December 8, 2023