Production Control Board
The Production Control Board lets you review key work order information in one place. You can monitor production progress, identify work orders that need attention, and take available actions from one page.
The board includes WIP and non-WIP work orders. Use the Work Orders tab to review work orders and component shortages. Use the Insights tab to review production trends.
For information about using the Production Control Board, see the following topics:
Production Control Board Permissions
Refer to the following table for the permissions required to use the Production Control Board:
|
Permission |
Minimum Access Level |
|---|---|
|
Subsidiary |
View |
|
Work Order |
View |
|
Locations |
View |
Refer to the following table for the additional permissions required to view individual portlets:
|
Portlet |
Permission |
Minimum Access Level |
Requirements |
|---|---|---|---|
|
WIP Balance |
Work Order Issue |
View |
WIP must be enabled |
|
WIP Balance |
Work Order Completion |
View |
WIP must be enabled |
|
WIP Balance |
Work Order Close |
View |
WIP must be enabled |
|
WIP Balance |
Revalue Inventory Cost |
View |
Required if Standard Costing is enabled; WIP must be enabled |
|
Scrap Trend |
Work Order Completion |
View |
WIP must be enabled |
|
Top Produced Assemblies Trend by Volume |
Build Assemblies |
View |
- |
|
Top Produced Assemblies Trend by Volume |
Work Order Completion |
View |
Required if WIP is enabled |
|
Top Produced Assemblies Trend by Cost |
Build Assemblies |
View |
- |
|
Top Produced Assemblies Trend by Cost |
Work Order Completion |
View |
Required if WIP is enabled |
|
Top Produced Assemblies Trend by Cost |
Work Order Issue |
View |
Required if WIP is enabled |
|
Production Cost Trend |
Build Assemblies |
View |
- |
|
Production Cost Trend |
Work Order Completion |
View |
Required if WIP is enabled |
|
Production Cost Trend |
Work Order Issue |
View |
Required if WIP is enabled |
The following permissions are required to perform operations from the Actions menu in the work order (WO) grid and to close or release work orders in bulk:
|
Permission |
Minimum Access Level |
|---|---|
|
Work Orders |
Edit |
|
Mark Work Orders Released |
Edit |
|
Build Assemblies |
Create |
|
Work Order Issue |
Create |
|
Work Order Completion |
Create |
|
Work Order Close |
Create |
|
Close Work Orders |
Edit |
Opening the Production Control Board
-
Go to Transactions > Manufacturing > Production Control Board.
-
If you use NetSuite OneWorld, select a Subsidiary.
-
Select a Location.
-
Click Customize to select which charts appear on the Insights page.
-
To view a work order summary, search for or select a work order in the View Work Order Summary dropdown list. The Work Order Summary window displays the work order's status, risk indicators, production progress, quantities, and planned and actual production dates. Click the assembly name to open the related assembly record.
For work orders that use Manufacturing Routing, the Operation table shows each operation's work center, status, and completion progress. Click an operation name to open the corresponding operation task record.
Click Close to close the summary window and return to the Production Control Board.
Reviewing Production Insights
Use the Insights tab to review production volume, production cost, and scrap trends. The trend charts support daily, weekly, and monthly views.
The following portlets are available:
|
Portlet |
Description |
|---|---|
|
WIP Balance |
Total open work in process balance, with debit and credit amounts. This chart appears only when the Manufacturing WIP feature is enabled. |
|
Components with Shortage |
List of components with shortages across released work orders, with one row for each component. Expand a component row to view all work orders affected by that component shortage. The following details are available:
The list is sorted by Supply Required By Date, earliest first. If Supply Allocation is not enabled, the list is sorted by the related work order's Production Start Date, earliest first. |
|
Scrap Trend |
Scrap value over time, using the amounts on scrap lines from work-order completions. This chart appears when the Manufacturing WIP feature is enabled. |
|
Top Produced Assemblies Trend- Volume |
Production-volume trends for up to five of the most-produced assemblies.
Note:
When the MRP feature is enabled, the portlet includes only items whose replenishment method is MPS. |
|
Production Cost Trend |
Production cost over time, using assembly-build credit lines excluding variance lines, and credit lines from component issues and work-order completions. |
|
Top Produced Assemblies Trend- Cost |
Production-cost trends for up to five top-produced assemblies, based on cost.
Note:
When the MRP feature is enabled, the portlet includes only items whose replenishment method is MPS. |
Reviewing Work Orders
On the Work Orders tab, you can review work orders by category, such as active, at risk, in process, ready, recently completed work orders, and work orders to release.
|
Subtab |
Description |
|---|---|
|
Active |
Work orders with a Planned, Released, or In Process status, including those without production risks. Ordered by Production Start Date, earliest first. |
|
At Risk |
Only active work orders that meet the Late Start, Late Completion, or Component Shortage criteria. Ordered by Production Start Date, earliest first. |
|
Ready |
Work orders with a Released status whose buildable quantity equals the total work order quantity. Ordered by Production Start Date, earliest first. |
|
In Process |
Work orders with an In Process status. Ordered by Production Start Date, earliest first. |
|
Recently Completed |
Work orders with a Built or Closed status. Ordered by Actual Production End Date, latest first. |
|
Work Orders to Release |
Work orders with a Planned status. You can select multiple work orders to release them in bulk. Ordered by Production Start Date, earliest first.
Note:
You can select a maximum of 200 work orders for a single bulk release. |
|
Work Orders to Close |
WIP work orders with a Built status, or an In Process status when the built quantity is greater than or equal to the work order quantity. You can select multiple work orders to close them in bulk. Ordered by Production Start Date, earliest first.
Note:
You can select a maximum of 200 work orders for a single bulk close. |
The following work order details are available:
|
|
|
|---|---|
|
WO# |
The work-order number. |
|
Status |
The current work order status, such as Planned, Released, In Process, Built, or Closed. |
|
Risk |
Applicable risk indicators, such as Late Start, Late Completion, or Short. |
|
Assembly Item |
The assembly item being produced. |
|
Production Start Date |
The scheduled production start date. |
|
Production End Date |
The scheduled production end date. |
|
Demand |
A link to the originating sales order or work order. This column is populated when the work order was generated from one of those transactions. It is blank when the work order has no originating sales order or work order. |
|
Required by Date |
The date associated with the originating demand. If Supply Allocation is enabled, it displays the Supply Required By Date from the corresponding assembly line on the sales order or from the work order's header. When not enabled, it displays the Expected Ship Date from the corresponding sales order line or the Production Start Date from the parent work order. |
|
Built / Total Quantity |
The quantity built compared with the total work order quantity. |
|
Actions |
Actions available for the work order, including Preview, Release, Close, and applicable manufacturing transactions. |
For WIP work orders that use Manufacturing Routing, expand the work order row to review its operations. The expanded list shows the operation name, work center, status, completed quantity and total quantity, and start and end dates and times. Click an operation name to open its manufacturing operation task.
The Actions column provides the actions available for each work order. Manufacturing transaction actions follow the actions available on the work-order record:
-
Preview
-
Close
-
Issue Components
-
Enter Completion
-
Enter Completion with Backflush