Prerequisites for Installing Costed Bill of Materials
To use the Costed Bill of Materials SuiteApp, enable the features in the following table. For more information, see Enabling Features.
Subtab |
Feature Name |
---|---|
Items & Inventory |
Advanced Bill of Materials |
Assembly Items |
|
SuiteCloud |
Custom Records |
Server SuiteScript |
|
Client SuiteScript |
|
SuiteCloud Development Framework |
Following are some general information for the Costed Bill of Materials SuiteApp:
-
The currency of the cost displayed in the report is shown based on the default currency of the selected subsidiary.
-
The subassemblies should have a master default bill of materials and the default routing for location to get the detailed estimated cost.
-
The SuiteApp displays details in the Materials Costs, Assembled Costs, and Fully Exploded Costs subtabs irrespective of whether a work center, cost template, or routing is active or inactive.
-
The SuiteApp supports up to 900 levels of assembly items and up to 400 sub-assemblies in each level.