Per Costing Method

The Per Costing Method option calculates material costs based on the costing method assigned to each item. A nonstandard costing method is any costing method other than Standard.

Inventory components with standard or nonstandard costing methods use the following cost-source sequence, except when their BOM Item Source is Purchase Order:

  1. Item location average cost.

  2. Item purchase price from the preferred vendor.

  3. Item purchase price.

  4. Item location default cost.

If a cost source is unavailable or zero, the SuiteApp checks the next source. If all sources are unavailable or zero, the cost is zero. Components with a BOM Item Source of Purchase Order follow the separate purchase-price sourcing rule.

Before transactional costing is available, the location average cost may reflect the location's Initial Average Cost. This value is used through the location average cost source; it does not override the preceding cost-source sequence.

For information about transaction-accounting behavior, see Initial Average Cost.

Note:

For nonstandard subassembly components whose BOM Item Source is neither Purchase Order nor Phantom, the Top Level Only setting determines how costs are calculated:

  • When the box is checked, the SuiteApp does not explode the subassembly's BOM. It uses the preceding cost-source sequence to determine the subassembly component's cost.

  • When the box is cleared, the SuiteApp explodes the subassembly's BOM and aggregates its component costs.

Purchased components and phantom assemblies follow additional rules. For more information, see Cost Types for Material Cost Calculation.

The following table describes Per Costing Method calculations by item type, costing method, BOM component source, and Top Level Only setting.

Top Level Only refers to the option available on the Costed Bill of Materials page. End assembly refers to the selected assembly on the Costed Bill of Materials page; subassemblies and inventory components are BOM components.

Item Type

Top Level

Costing Method

BOM Component Item Source

Cost Calculation

End assembly

Checked or cleared

Nonstandard

Not applicable

Calculate the end assembly's material cost by aggregating its BOM component costs.

Evaluate each component according to its costing method, BOM Item Source and the Top Level Only setting, using the rules below.

The selected end assembly's own Average/Purchase/Default price is not used directly to determine its material total.

End assembly

Checked or cleared

Standard

Not applicable

Display an alert message instead of generating cost results. To view the standard-cost breakdown, go to Transactions > Manufacturing > Costed Bill of Materials Inquiry.

Subassembly component

Checked or cleared

Standard

Neither Purchase Order nor Phantom

Explode the subassembly's BOM and aggregate its component costs.

Each exploded component uses its own applicable cost sources, not the parent subassembly's prices.

When Top Level Only is checked, hide the exploded child rows but include their calculated costs.

Subassembly component

Checked

Nonstandard

Neither Purchase Order nor Phantom

Do not explode the subassembly's BOM.

Use the subassembly's own cost sources:

  1. Item location average cost.

  2. Item purchase price from the preferred vendor.

  3. Item purchase price.

  4. Item location default cost.

  5. If all preceding sources are unavailable or zero, use zero.

Subassembly component

Cleared

Nonstandard

Neither Purchase Order nor Phantom

Explode the subassembly's BOM and aggregate its component costs.

Each exploded component uses its own applicable cost sources, not the parent subassembly's prices.

Subassembly component

Checked or cleared

Standard or nonstandard

Phantom

Recursively calculate and aggregate component costs.

Each component follows its own Item Source and applicable cost-source rules.

Stop explosion at a component whose Item Source is Purchase Order.

When Top Level Only is checked, hide child rows but include their calculated costs.

Subassembly component

Checked or cleared

Standard or nonstandard

Purchase Order

Use purchase-price sourcing:

  1. Item purchase price from the preferred vendor.

  2. Item location last purchase price.

  3. Item purchase price.

  4. If all preceding sources are unavailable or zero, use zero.

Do not explode the subassembly's BOM.

Inventory component

Checked or cleared

Standard

Not Purchase Order

  1. Item location average cost.

  2. Item purchase price from the preferred vendor.

  3. Item purchase price.

  4. Item location default cost.

  5. If all preceding sources are unavailable or zero, use zero.

Inventory component

Checked or cleared

Nonstandard

Not Purchase Order

  1. Item location average cost.

  2. Item purchase price from the preferred vendor.

  3. Item purchase price.

  4. Item location default cost.

  5. If all preceding sources are unavailable or zero, use zero.

Inventory component

Checked or cleared

Standard or nonstandard

Purchase Order

Use purchase-price sourcing:

  1. Item purchase price from the preferred vendor.

  2. Item location last purchase price.

  3. Item purchase price.

  4. If all preceding sources are unavailable or zero, use zero.

For information about how BOM item source and phantom assemblies affect cost calculations, see Cost Types for Material Cost Calculation.

Related Topics

General Notices