Cost Types for Material Cost Calculation

You can select the cost type from the Material Cost field in the Costed Bill of Materials page.

Following are the cost types.

Note:

Following information is applicable to all cost types:

  • Item location average cost, item location last purchase price, and item location default cost are sourced from the Costed Bill of Materials report's selected Location.

  • Preferred-vendor purchase prices are sourced from the item's preferred vendor for the selected subsidiary. Nonpreferred vendors are ignored. If the preferred-vendor price is unavailable or zero, the SuiteApp checks the next cost source.

  • Item purchase prices, including preferred-vendor purchase prices, are converted to the selected subsidiary's currency when the source currency differs.

  • Service, noninventory, and charge items do not have an associated costing method. Their costs are sourced from the item purchase price.

  • Quantities and costs must use compatible units of measure. The displayed component unit cost corresponds to the unit specified on the BOM line. A cost source is not necessarily expressed in purchase units.

  • The Costed Bill of Materials report's Date/Effective Date determines which BOM revision is selected. Item costs are sourced from available values according to the applicable cost-source sequence.

  • If an assembly component has no available BOM or BOM revision, its material cost is sourced using the applicable inventory-item cost-source sequence. This fallback does not bypass the restrictions on a selected standard-cost end assembly.

  • An available BOM revision with no components is different from a missing BOM or revision. When the applicable costing rule requires the subassembly's BOM to be exploded, an empty BOM revision produces a material cost of zero. This rule does not apply when the calculation uses the subassembly's own purchase price. If a default routing is associated with the component, eligible conversion costs can still be calculated.

  • Conversion cost values are blank when the corresponding costs, such as labor setup or machine run, are not defined in the manufacturing cost template.

Unit and Currency Conversion Example

A component has a vendor price of EUR 120 per Pack. Each pack contains 12 Each, and the BOM-line unit is Each. Using an exchange rate of $1.10 per EUR:

EUR 120 per Pack ÷ 12 Each per Pack × $1.10 per EUR = $11 per Each.

The displayed component unit cost is $11 per Each. A requirement of 3 Each has a material cost of $33.

Watch the following help video for cost calculation methods:

Related Topics

General Notices