Cost Types for Material Cost Calculation
You can select the cost type from the Material Cost field in the Costed Bill of Materials page.
Following are the cost types.
Following information is applicable to all cost types:
-
Item location average cost, item location last purchase price, and item location default cost are sourced from the Costed Bill of Materials report's selected Location.
-
Preferred-vendor purchase prices are sourced from the item's preferred vendor for the selected subsidiary. Nonpreferred vendors are ignored. If the preferred-vendor price is unavailable or zero, the SuiteApp checks the next cost source.
-
Item purchase prices, including preferred-vendor purchase prices, are converted to the selected subsidiary's currency when the source currency differs.
-
Service, noninventory, and charge items do not have an associated costing method. Their costs are sourced from the item purchase price.
-
Quantities and costs must use compatible units of measure. The displayed component unit cost corresponds to the unit specified on the BOM line. A cost source is not necessarily expressed in purchase units.
-
The Costed Bill of Materials report's Date/Effective Date determines which BOM revision is selected. Item costs are sourced from available values according to the applicable cost-source sequence.
-
If an assembly component has no available BOM or BOM revision, its material cost is sourced using the applicable inventory-item cost-source sequence. This fallback does not bypass the restrictions on a selected standard-cost end assembly.
-
An available BOM revision with no components is different from a missing BOM or revision. When the applicable costing rule requires the subassembly's BOM to be exploded, an empty BOM revision produces a material cost of zero. This rule does not apply when the calculation uses the subassembly's own purchase price. If a default routing is associated with the component, eligible conversion costs can still be calculated.
-
Conversion cost values are blank when the corresponding costs, such as labor setup or machine run, are not defined in the manufacturing cost template.
Unit and Currency Conversion Example
A component has a vendor price of EUR 120 per Pack. Each pack contains 12 Each, and the BOM-line unit is Each. Using an exchange rate of $1.10 per EUR:
EUR 120 per Pack ÷ 12 Each per Pack × $1.10 per EUR = $11 per Each.
The displayed component unit cost is $11 per Each. A requirement of 3 Each has a material cost of $33.
Watch the following help video for cost calculation methods: