Costed Bill of Materials Inquiry

The Costed BOM Inquiry report details individual and aggregated assembly costs. It shows how cost components are rolled up to an assembly item based on the BOM. This report includes material and conversion costs (labor and machine costs and their overhead).

Note:

Standard costing and assemblies must be enabled to use the Costed BOM Inquiry. You can run this inquiry for a standard cost assembly item only.

To run a Costed Bill of Materials Inquiry

  1. Go to Transactions > Manufacturing > Costed Bill of Materials Inquiry.

  2. If you use NetSuite OneWorld, select a Subsidiary from the list.

  3. Optionally, select an Assembly to filter the available Bills of Materials.

  4. Select a Location to display data for that location.

  5. To limit the details to the top level of member items, check the Top Level Only box.

    Sub-assembly information does not appear.

    To show details about all levels of member items, clear the Top Level Only box.

  6. Select a BOM Display Control option:

    • By Date – the Bill of Materials Revision field is disabled.

      If the date changes, the Bill of Materials Revision field displays a new BOM.

    • By Revision – enables the bill of materials revision field.

  7. Select the Bill of Materials you want to run the from the list.

    This selection can automatically populate the Bill of Materials Revision and Effective Date fields.

  8. To change the default revision, select a Bill of Materials Revision.

  9. To change the default date, click the Effective Date calendar icon and then select a date from the calendar.

Related Topics

Running a BOM Inquiry

General Notices