Linking Assemblies to BOM Records

After you create a Bill of Materials (BOM), you can link it to one or more assemblies. All assemblies associated to the BOM appear on the Assemblies subtab.

To link an assembly to a BOM record:

  1. In the BOM record, click the Assemblies subtab.

  2. In the Assembly list, select the assembly you want to link to the BOM.

  3. Click Add.

  4. Click Save.

    From the BOM record you can assign the same default assembly record validation (master default or location-specific default) to the BOM. A BOM cannot be both master and location default. They must be assigned to separate BOMs within an assembly.

    For example, you can set one BOM as the master default for the assembly. Then, set a second BOM as the East Coast location default.