What's New in This Guide
This section lists the documentation updates for Release 25.2.1xx in Oracle Communications Network Analytics Data Director Installation, Upgrade, and Fault Recovery Guide.
Release 25.2.100 - G41328-03, November 2025
- Updated the stem sentence of step 2 for Configuring ServiceMonitor in OCCNE-INFRA.
Release 25.2.100 - G41328-02, November 2025
- Updated steps for Configuring ServiceMonitor in OCCNE-INFRA.
- Updated Upgrade Tasks – Step 1 by replacing incorrect management group
references with worker group instances. For example,
occurrences of
mgmtwere replaced withwgin the commands. - Performed the following changes in the Post Upgrade Task section:
- Added a note specifying that Steps 1, 2, and 3 are required only when OCCM is used to manage certificates in both the source and target releases.
- Updated Step 1 to indicate that it is optional and required only if certificate updates are needed.
- Updated Step 2 to indicate that it is conditional and required only if Step 1 was completed.
Release 25.2.100 - G41328-01, October 2025
- General Updates:
- Updated the release number to 25.2.100 in the entire document.
- Removed all the instances of HNS and hnc-controller as it is not supported in this release.
- Updated the software details in Software Requirements section.
- Updated the Environment Setup Requirements details.
- Removed 'ocnaddadmin' service from management group and added it in the worker group in the Resource Requirements section.
- Installation Updates:
- Updated the docker images and version details in Pushing the Images to Customer and OCI Registry section.
- Update the notes and multiple commands in the Creating OCNADD Namespace section.
- Updated the steps for Configuring OCNADD Database.
- Updated the procedure for Configuring SSL or TLS Certificates.
- Added the steps for "Configuring ServiceMonitor in OCCNE-INFRA" in the OCCM Prerequisites for Installing OCNADD section.
- Updated the versions and code snippets in the procedure for Installing OCNADD Package.
- Updated the procedure for Adding a Worker Group and Deleting a Worker Group.
- Added the details for Enabling Druid as Extended Storage Feature in "PostInstallation Tasks" section.
- Updated the default parameters listed for Model 1 and Model 2 in the OCNADD Deployment Models section.
- Performed the following updates to the
parameters listed in the following sections:
- Added the details of the
following parameters in the Global Parameters section:
extendedStorage.druid.enabledextendedStorage.druid.druidTLsEnabledextendedStorage.druid.namespaceextendedStorage.druid.service_ipextendedStorage.druid.service_portString NA 8080 M The port of the Druid router service
- Added details of the following parameter in
Kafka Configuration Parameters section:
kafkaBroker.kafkaProperties.ramDriveStorage
- Added the details of the
following parameters in the Global Parameters section:
- Upgrade, Rollback, and Uninstall Updates:
- Updated the Supported Upgrade Paths.
- Updated the steps in Preupgrade Tasks.
- Updated the steps and scenarios in Upgrade Tasks.
- Added the details of "Migration of Kafka to Kraft Mode" in Post Upgrade Task.
- Updated the procedure and scenarios for Rolling Back OCNADD.
- Updated the procedure for Uninstalling OCNADD.
- Updated the fault recovery procedure for Creating OCNADD Restore Job.