3.1.1 i. Preparation phase
Table 3-2 Timeline table for Full upgrade preparation
| ELAP A | ELAP B | |||||
|---|---|---|---|---|---|---|
| Procedure | Task | A | Task Start time (min) | B | Task | Procedure |
|
Download the alter table script from OSDC, from |
||||||
|
where the TPD and ELAP ISO are downloaded. |
||||||
|
**Before Maintenance Window** |
||||||
|
Setting Up Upgrade Environment |
10 |
0 |
||||
|
10 |
10 |
Setting Up Upgrade Environment |
||||
|
Capture E5APPB Current Configuration |
20 |
20 |
||||
|
Pre-upgrade health check |
10 |
40 |
||||
|
50 |
10 |
Pre-upgrade health check |
||||