3.1.2 ii. Maintenance Window Tasks

Table 3-3 Timeline table for Full upgrade of ELAP

  LSMS    
Procedure Task Time Task Start time (min)

3.7, Appendix D

Disconnect NPAC fromLSMS

5

0

Procedure 4

*LSMS Servdi Backup

170

175

*LSMS Servdi backup time will vary according to the data on LSMS. This has to be done simultaneously while IPMing the ELAP servers.

Table 3-4 Maintenance Window Tasks

ELAP A       ELAP B  
Procedure Task A Task Start time (min) B Task Procedure

Procedure 5

Backup EuiDB with

MyISAM engine and InnoDB engine

15

15

     

Procedure 6

Disconnect ELAP from

LSMS

5

20

     
     

50

30

E5APPB to APPD card Replacement

Procedure A.3

     

95

45

IPM MPS server with TPD 8.10.x

Procedure 7

     

105

10

Pre-install configuration

Procedure 8

     

135

30

ELAP installation steps

Procedure 9

     

145

10

Configure Network for Backup transfer

Procedure 10

Procedure 15

Transfer backup to local B

5

150

     

Procedure A.3

E5APPB to APPD card Replacement

30

180

     

Procedure 7

IPM MPS server with TPD

8..x

45

225

     

Procedure 8

Pre-install configuration

10

235

     

Procedure 9

ELAP installation steps

30

265

     

For Telco Switches:Procedure 11

For Cisco Switches-

Procedure A.1

Procedure A.2

Switch Configuration

30

295

     

Procedure 12

Configure NTP server

5

300

     

Procedure 13

Initial Network Configuration

10

310

     

Procedure 14

Verify Configurations

5

315

     
     

320

5

Transfer backup to local

A

Procedure 15

Procedure 16

Restore EuiDB

5

325

     

Procedure 17

SSH key exchange between ELAP and LSMS

5

330

     

Procedure 18

Repoint LSMS to ELAP VIP

15

345

     

Procedure 19

Transfer Servdi Image To

ELAP

5

350

     

Procedure 20

Restore Servdi

15

365

     

3.7, Appendix E

Connect NPAC to LSMS

5

370

     

Procedure 21

Post Upgrade Syscheck

5

375

5

Post Upgrade Syscheck

Procedure 21

Procedure 22

Accept The Upgrade

5

380

5

Accept The Upgrade

Procedure 22

* After ELAP installation, switch configuration is done before configuring NTP server and initial configuration, it will take an extra 30 minutes to configure the switches. Follow Procedure A.1 and A.2 for Cisco switch configuration steps and Procedure 11 for Telco switch configuration.

Note:

After accepting upgrade on ELAP, the SCCP cards at EAGLE should be initialized to load the

For ELAP DB, follow Procedure 25