Go to main content
1/22
Contents
Title and Copyright Information
Preface
Known Installation and Configuration Issues
Where to Find More Information
Documentation Accessibility
Part I Installation
1
Installing the Argus Mart Application
1.1
Before Installing the Argus Mart Application
1.2
Installing Argus Mart Components
2
Creating the Argus Mart Database Structure
2.1
Overview of the dbinstaller.properties file
2.2
Installing Argus Mart
2.2.1
Pre-requisites
2.2.2
Creating User for the Argus Safety Database
2.2.3
Creating the Install User
2.2.4
Creating Fresh Argus Mart Schema
2.2.5
Validating the Schema
2.3
Creating Database Links
2.3.1
From Argus Mart to Argus Safety (manually)
2.3.2
From Argus Mart to Argus Insight
2.4
Creating Argus Mart Read-only User
3
Creating Multiple Enterprises in Multi-tenant Environment
4
Configuring ODI Settings
4.1
Minimum Components Required
4.2
Installing and Configuring ODI
4.3
Creating and Testing Data Server Connection
4.4
Creating New Physical Schema
4.5
Setting-up the Physical Agent for Context CTX_ARGUSMART
4.6
Validating Load Plan
5
Configuring the Argus Mart Application
6
Upgrading Argus Mart
6.1
Post-upgrade Steps
7
Extracting, Transforming, and Loading Data
7.1
Managing Initial ETL Process: ODI Studio
7.1.1
Running the ETL
7.1.2
Stopping the ETL
7.1.3
Restarting the ETL
7.1.4
Processing a Failed ETL
7.1.4.1
Continuing the Failed Initial ETL
7.1.4.2
Restarting the Failed Initial ETL
7.2
Monitoring Initial ETL Process: ODI Studio
7.2.1
Viewing the Steps of Load Plan
7.2.2
Monitoring the ETL
7.2.3
Debugging the Failed ETL
7.2.4
Monitoring the Restarted ETL (Resume)
7.3
Managing Initial ETL Process: ODI Console
7.3.1
Running the Initial ETL
7.3.2
Stopping the Initial ETL
7.3.3
Restarting the Initial ETL
7.3.4
Processing a Failed ETL
7.3.4.1
Continuing the Failed Initial ETL
7.3.4.2
Restarting the Failed Initial ETL
7.4
Monitoring Initial ETL Process: ODI Console
7.4.1
Viewing the Steps of Load Plan
7.4.2
Monitoring the ETL
7.4.3
Debugging the Failed ETL
7.4.4
Monitoring the Restarted ETL (Resume)
7.5
Running the Incremental ETL
8
Uninstalling the Argus Mart Application
Part II Administration
9
Setting Context in Multi-tenant Environment
10
Secure Unblinding in Argus Mart
11
Rebuilding a Case in Argus Mart
12
Incremental ETL: ODI Studio
12.1
Scheduling Incremental ETL
12.2
Monitoring Incremental ETL Process
12.3
Managing Incremental ETL Process
12.3.1
Running the Incremental ETL
12.3.2
Stopping the Incremental ETL
12.3.3
Restarting the Incremental ETL
12.3.4
Processing a Stopped or a Failed ETL
12.3.4.1
Continuing the Failed Incremental ETL
12.3.4.2
Restarting the Failed Incremental ETL
13
Incremental ETL: ODI Console
13.1
Scheduling an ETL
13.2
Monitoring Incremental ETL Process
13.3
Managing Incremental ETL Process
13.3.1
Running the Incremental ETL
13.3.2
Stopping the Incremental ETL
13.3.3
Restarting the Incremental ETL
13.3.4
Processing a Stopped or a Failed ETL
14
Re-initializing the ETL Process
15
Troubleshooting
15.1
Dictionary Reload Error
15.2
ETL Execution Pre-Requisite Check Failed Error
15.3
FR Consistency Log Error
15.4
MedDRA Mismatch Error
15.5
Multiple Enterprise Creation Messages
15.5.1
Source Enterprise Does Not Exist In Mart
15.5.2
Enterprise Does Not Exist In Argus Safety
15.5.3
Enterprise Does Not Exist For Configuration In Mart
15.6
SMQ-CMQ Loop Error
A
Configuring Standalone Installation Topology for Standalone Agent
A.1
Pre-requisite
A.2
To configure a standalone agent:
B
Configuring Standard Installation Topology for Java EE Agent
B.1
Pre-requisite
B.2
To configure a Java EE agent:
Scripting on this page enhances content navigation, but does not change the content in any way.