Skip Navigation Links | |
Exit Print View | |
Oracle Directory Server Enterprise Edition Upgrade and Migration Guide 11 g Release 1 (11.1.1.5.0) |
Part I Patching Directory Server Enterprise Edition 7 to 11g Release 1 (11.1.1.5.0)
2. Patching Directory Server Enterprise Edition 7 to Version 11g Release 1 (11.1.1.5.0)
Part II Upgrading Directory Server Enterprise Edition 6 to 11g Release 1 (11.1.1.5.0)
3. Upgrading Directory Server Enterprise Edition 6 to Version 11g Release 1 (11.1.1.5.0)
Part III Migrating Directory Server Enterprise Edition 5.2 to Version 11g Release 1 (11.1.1.5.0)
4. Overview of the Migration Process for Directory Server
5. Automated Migration Using the dsmig Command
6. Migrating Directory Server Manually
Before You Start a Manual Migration
Migrating Configuration Data Manually
Migration of Specific Configuration Attributes
Global Configuration Attributes
Security Configuration Attributes
Feature Configuration Attributes
Mapping Tree Configuration Attributes
Replication Configuration Attributes
Password Policy Configuration Attributes
UniqueID Generator Configuration Attributes
Database Configuration Attributes
Plug-In Configuration Attributes
Migrating Security Settings Manually
Migrating User Plug-Ins Manually
7. Migrating a Replicated Topology
8. Architectural Changes in Directory Server Since Version 5.2
9. Migrating Directory Proxy Server
If you have migrated your server manually, the following post-migration tasks are required before you can run the new server.
If you have customized user plug-ins, these need to be recompiled and added to the new server manually.
If the migrated server was part of a replicated topology, see Chapter 7, Migrating a Replicated Topology.
If you have customized backup, recovery, and installation scripts, you need to rewrite these scripts to comply with the new version.