BEA Logo BEA BEA eLink Business Process Option (BPO) Release 1.2

  Corporate Info  |  News  |  Solutions  |  Products  |  Partners  |  Services  |  Events  |  Download  |  How To Buy

 

   BEA eLink Business Process Option (BPO) Doc Home   |   Server Installation Guide   |   Previous Topic   |   Next Topic   |   Contents   |   Index

Installation Overview

 

The following sections provide an overview of the various procedures involved in installing, deploying, and testing the BEA eLink Business Process Option (BPO) Servers.

Stage 1: Installing the Business Process Engine

Stage 1 consists of two main procedures:

Stage 1 Business Process Engine Installation

Stage 1 installation entails the following procedures:

For a detailed description of these procedures, see Stage 1: Installing the eLink Business Process Engine.

Stage 1 Business Process Engine Startup, Test and Verification

Stage 1 test and verification entails the following procedures:

For a detailed description of these procedures, see Verifying the Stage 1 Installation.

Stage 2: Installing the Business Process Option Server

Stage 2 installation consists of two main procedures:

Stage 2 BPO Server Installation

Stage 2 installation entails the following procedures:

For a detailed description of these procedures, see Stage 2: Completing the Installation.

Stage 2 BPO Server Post-installation

Stage 2 post-installation entails the following procedures:

For a detailed description of these procedures, see the "Post-Installation Procedures" section in Stage 2: Completing the Installation.