Installation Overview
The following sections provide an overview of the various procedures involved in installing, deploying, and testing the BEA eLink Business Process Option (BPO) Servers.
Stage 1: Installing the Business Process Engine
Stage 1 consists of two main procedures:
Stage 1 Business Process Engine Installation
Stage 1 installation entails the following procedures:
For a detailed description of these procedures, see Stage 1: Installing the eLink Business Process Engine.
Stage 1 Business Process Engine Startup, Test and Verification
Stage 1 test and verification entails the following procedures:
For a detailed description of these procedures, see Verifying the Stage 1 Installation.
Stage 2: Installing the Business Process Option Server
Stage 2 installation consists of two main procedures:
Stage 2 BPO Server Installation
Stage 2 installation entails the following procedures:
For a detailed description of these procedures, see Stage 2: Completing the Installation.
Stage 2 BPO Server Post-installation
Stage 2 post-installation entails the following procedures:
For a detailed description of these procedures, see the "Post-Installation Procedures" section in Stage 2: Completing the Installation.
|
|
|