14/14
Index
A B C D E F G H I K L M N O P Q R S T U V W Y
A
- accounting and costing information
-
- entering, 5.3.1.1
- Address Book Master table (F0101), 2.3
- Advanced Cost Accounting Constants program (P1609)
-
- entering activity codes, 5.4.1
- alternate operations
-
- defining for processes, 6.2
- defining routing instructions, 5.1.1
- entering, 5.4.1
- approval routings
-
- setting up, 3.8.1.1
- setting up order-specific, 3.8.7
- Assembly Inclusions Rules table (F3293), 3.4.1
B
- batch bills of material, 4.2.2
- batch processes, 6.2
- batch processing
-
- co/by-products, 6.1
- example, 6.1.1
- batch routing instructions, 5.1.1
- Bill of Material Comparison program (P30204)
-
- processing options, 4.6.10
- usage, 4.6.11
- Bill of Material Component Substitutes program (P3002S), 4.5.1
- Bill of Material Inquiry - Multi Level Indented form, 4.6.2
- Bill of Material Inquiry - Single Level form, 4.6.2, 4.6.6
- Bill of Material Inquiry program (P30200)
-
- locating multilevel bills of material, 4.6.1
- locating single-level bills of material, 4.6.1
- processing options, 4.6.5
- Bill of Material Master File table (F3002), 2.3, 3.4.1
- Bill of Material Print program (R30460)
-
- multi-level bills of material, A.2
- processing options, A.3.4
- single level bills of material, A.2
- Bill of Material Revisions program (P3002)
-
- processing options, 4.5.3
- Bill of Material Structure Analysis program (R30601)
-
- processing options, 4.6.4
- Bill of Material Where Used program (P30201)
-
- processing options, 4.6.8
- Bill of Material Where Used Update program (R30520)
-
- processing options, 4.7.4
- Bill of Materials Change File table (F3011), 2.3, 3.4.1
- Bill Type user-defined codes (40/TB), 3.2
- bills of material
-
- batch bills, 4.2.2
- changing multiple, 4.7.1
- comparing, 4.6.1
- defining bulk items, 4.3.7
- defining component locators, 4.3.4
- defining nonstock items, 4.3.5
- defining parent and component relationships, 4.3.1
- defining part replacements, 4.3.8
- defining phantom items, 4.3.2
- defining substitute items, 4.3.3
- defining tools, 4.3.6
- entering, 4.5.1
- entering component locators, 4.5.1.2
- entering grade or potency information, 4.5.4
- entering kits, 4.5.1.1
- entering planning bills, 4.5.1.1
- entering production information, 4.5.1
- features, 2.2.1
- locating, 4.6.1
- locating components, 4.6.9
- locating graphically, 4.6.1
- locating multilevel, 4.6.1
- locating single level, 4.6.1
- locating where component is used, 4.6.1
- manufacturing bills, 4.2.4
- overview, 4.1
- percent bills, 4.2.3
- percent example, 6.1.2
- planning bills, 4.2.1
- printing multi-level bills of material, A.3.3
- reviewing, 4.6.1
- setting up for repetitive manufacturing, 3.7.1.2
- terminology, 4.3
- types, 4.2
- updating, 7.4.2
- updating multiple, 4.7.1
- usage, 4.1
- validating, 4.6.1
- verifying, 4.6.1
- bills of material entry, 4.5.1
- bulk items
-
- defining, 4.3.7
- Business Interface Integration Objects, 1.4
- Business Unit Master table (F0006), 2.3
- by-products
-
- entering, 6.4.1
- process terminology table, 6.2
C
- Co/By Product Revision form, 6.4.3, 6.4.8
- Component Locator File table (F3015), 2.3
- Component Locator program (P3015)
-
- usage, 4.5.1.2, 4.5.7
- Component Locator Revisions form, 4.5.2, 4.5.7
- Component Locator Revisions program (P3015)
-
- processing options, 4.5.6
- component locators
-
- defining, 4.3.4
- entering, 4.5.1.2
- entering on bills of material, 4.5.1.2
- component scrap
-
- example, 5.4.1.2
- updating, 5.4.1.1, 5.4.6
- components on bills of material, 4.6.9
- continuous processing
-
- co/by-products, 6.1
- co-products
-
- entering, 6.4.1
- process terminology table, 6.2
- co-products and by-products list, 6.4.1
- costing and accounting information
-
- entering, 5.3.1.1
- Cumulative Lead Time Calculation diagram, 5.5.2.3
- cumulative lead times
-
- calculating, 5.5.1, 5.5.2.3
- manufactured product types, 5.5.1
- cumulative planned yield percents, 5.4.1.1
D
- decimals
-
- converting, 3.4.1
- discrete manufacturing
-
- overview, 2.1.3
- Display Comparisons form, 4.6.2, 4.6.11
- document type constants
-
- defining, 3.6.1
- Document Type Maintenance program (P40040)
-
- setting up constants, 3.6.1
- Document Type Master (F40039) Conversion program (R31P40039)
-
- processing options, 3.6.3
- document types
-
- setting up, 3.6.1
E
- ECO Approval program (P4818)
-
- approving engineering change orders, 7.4.12
- processing options, 7.4.11
- reviewing engineering change orders, 7.4.1
- ECO Approval Revisions form, 7.4.4, 7.4.8
- ECO Approval Routing Master program (P4808)
-
- processing options, 3.8.5
- usage, 3.8.1.1, 3.8.6
- ECO Approval Routing Revisions form, 3.8.3, 3.8.6
- ECO Approval/Audit Review program (P48185)
-
- locating approval audit information, 7.4.8
- processing options, 7.4.7
- ECO Details program (R48020P)
-
- overview, A.3.5
- processing options, A.3.6
- ECO Entry program (P48020)
-
- processing options, 7.3.6
- ECO Notification program (R48181)
-
- notifying reviewers of engineering change orders, 7.3.1.5
- processing options, 7.3.14
- ECO Open Task Review program (P30220)
-
- processing options, 7.4.9
- reviewing open tasks, 7.4.10
- ECO Order Specific Routing Approval program (P48182), 3.8.7
- ECO Parts List Detail table (F3013), 2.3, 3.4.1
- ECO Parts List Entry form
-
- defining affected items, 7.3.10
- identifying changes, 7.3.1.2
- navigation, 7.3.3
- ECO Parts List program (P3013)
-
- processing options, 7.3.9
- usage, 7.3.10, 7.3.11
- ECO Related Items form
-
- defining changes, 7.3.11
- identifying changes, 7.3.1.2
- navigation, 7.3.3
- ECO Revisions Inquiry program (P30135)
-
- locating revision information, 7.4.6
- processing options, 7.4.5
- ECO Summary Report program (R48421)
-
- overview, A.2
- printing engineering change order information, A.3.7
- ECO Work Order Entry Revisions form, 7.3.3, 7.3.7
- ECO Work Order Print program (R48020P), A.2
- ECO Workbench program (P30225)
-
- locating existing engineering change orders, 7.3.1
- processing options, 7.3.4
- usage, 7.3.5
- engineering change management
-
- approving orders, 7.4.1
- creating change requests, 7.3.2
- defining order changes, 7.3.1.2
- defining routing instructions for engineering change orders, 7.3.1.1
- entering engineering change orders, 7.3.1
- features, 2.2.4
- identifying affected items, 7.3.1.2
- locating existing orders, 7.3.1
- locating order open tasks, 7.4.10
- notifying reviewers of orders, 7.3.1.5
- overview, 7.1
- printing order information, A.3.7
- requests overview, 7.1
- reviewing orders, 7.4.1
- reviewing orders for approval, 7.4.1
- reviewing pending engineering change orders, 7.3.1.4
- setting up approval routings, 3.8.1.1
- setting up orders, 3.8.1
- setting up user-defined codes, 3.8.4
- updating bills of material, 7.4.2
- working with orders, 7.3.1
- Engineering Change Order Process diagram, 7.1
- engineering change orders
-
- approving, 7.4.1
- creating requests, 7.3.2
- defining changes, 7.3.1.2, 7.3.11
- defining routing instructions, 7.3.1.1
- definition, 7.1
- entering, 7.3.1, 7.3.7
- features, 7.1.1
- identifying affected items, 7.3.1.2
- integrating with inventory management, 7.1.1.1
- integrating with shop floor management, 7.1.1.1
- locating existing, 7.3.1, 7.3.5
- notifying reviewers, 7.3.1.5
- overview, 7.3.1
- personnel involvement, 7.1.1.2
- printing information, A.3.7
- reviewing, 7.4.1
- reviewing for approval, 7.4.1
- reviewing pending orders, 7.3.1.4
- revision levels, 7.1.1.3
- selecting related items, 7.3.1.3
- setting up, 3.8.1
- setting up approval routings, 3.8.1.1
- setting up reviewers, 3.8.1.1
- working with, 7.3.1
- Engineering Change Population program (R30510)
-
- processing options, 7.4.14
- updating bills of material, 7.4.2
- Engineering Change Reason user-defined codes (40/CR), 3.8.4, 3.8.4
- engineering change requests
-
- creating, 7.3.2
- definition, 7.1
- Enter Bill of Material Information form, 4.5.2, 4.5.4
- Enter Change Routing program (P3003)
-
- processing options, 5.4.3
- Enter Component Substitutes form, 4.5.2, 4.5.5, 6.4.3
- Enter ECO Assignments form, 7.4.4, 7.4.10
- Enter Generic Message/Rates form, 3.3.2, 3.3.4
- Enter Ingredients form, 6.4.3, 6.4.6
- Enter Intermediate Products form, 6.4.3, 6.4.9
- Enter Process Information form, 6.4.3, 6.4.4
- Enter Routing Information form, 5.4.2, 5.4.4, 5.4.5
- Enter/Change Bill program (P3002)
-
- entering grade and potency information, 4.5.4
- entering or changing bills of material, 4.5.4
- entering planning bills and kit information, 4.5.4
- usage, 4.5.1
- Enter/Change ECO program (P48020)
-
- defining routing instructions, 7.3.1.1
- entering engineering change orders, 7.3.1
- usage, 7.3.7, 7.3.8
- Enter/Change ECR program (P48020)
-
- creating engineering change requests, 7.3.2
- Enter/Change Process program (P3003)
-
- entering co- and by-products list, 6.4.8
- entering co-products and by-products list, 6.4.1
- entering ingredients, 6.4.1
- entering intermediates, 6.4.1, 6.4.9
- entering outside operations, 6.4.5
- entering process ingredients, 6.4.6
- entering process operations, 6.4.4
- entering production information, 6.4.1
- entering substitute ingredients, 6.4.7
- usage, 6.4.4
- Enter/Change Resource Units program (P3007)
-
- setting up resource units for shifts, 3.7.1.3
- usage, 3.7.5
- Enter/Change Routing program (P3003)
-
- creating routing instructions, 5.4.1
- Enter/Change Work Center program (P3006)
-
- entering costing and accounting information, 5.3.1.1
- entering work center rates, 5.3.1.1
- entering, 6.4.1
- Existing Disposition user-defined codes (40/ED), 3.8.4
F
- F0006 table, 2.3
- F0007 table, 2.3
- F0101 table, 2.3
- F30006 table
-
- creating work centers, 5.3.1
- overview, 2.3
- F30008 table, 2.3
- F3002 table, 2.3, 3.4.1
- F30026 table
-
- entering work center efficiency, 5.3.5
- F3003 table, 2.3
- F3007 table
-
- overview, 2.3
- using available hours, 5.5.1.3
- F3009 table
-
- overview, 2.3
- retrieving work hours per day, 5.5.1.3
- F3011 table, 2.3, 3.4.1
- F3013 table, 2.3, 3.4.1
- F3015 table, 2.3
- F3016 table, 2.3
- F30161 table, 2.3
- F3105 table, 3.4.1
- F3112 table, 2.3
- F3283 table, 3.4.1
- F3293 table, 3.4.1
- F40205 table, 2.3
- F4101 table, 2.3
- F4101M table, 2.3
- F4102 table
-
- overview, 2.3
- using the time basis code, 5.5.1.2
- F41021 table, 2.3
- F4104 table, 2.3
- F4801 table, 2.3
- F4808 table, 2.3
- F48092 table, 2.3
- F4818 table, 2.3
- fixed lead times
-
- scheduling work order start dates, 5.5.1.2
- specifying, 5.5.1
- fixed or variable lead times
-
- specifying, 5.5.1
G
- General Message form, 3.3.2
- global implementation steps, 1.3.1
- grade information
-
- entering, 4.5.4
- Graphite Lubricant Batch Process diagram, 6.1.1
H
- hours
-
- using available, 5.5.1.3
I
- implementation
-
- global steps, 1.3.1
- product data management-specific, 1.3.2
- implementation steps, 1.3.2
- industry overview, 2.1
- ingredients
-
- entering, 6.4.1
- entering for processes, 6.4.6
- process terminology table, 6.2
- Ingredients Inquiry program (P30200)
-
- reviewing processes, 6.5.1
- Ingredients Where Used program (P30201)
-
- reviewing processes, 6.5.1
- Instructions Inquiry program (P3003)
-
- reviewing process instructions, 6.5.7
- reviewing processes, 6.5.1
- integration
-
- inventory management, 1.2.1
- master production schedule, 1.2.2
- procurement, 1.2.3
- product costing and manufacturing accounting, 1.2.4
- requirements planning, 1.2.2
- resource requirements planning, 1.2.7
- sales order management, 1.2.5
- shop floor management, 1.2.6
- Integration, 1.4
- Integrity Analysis program (R30601)
-
- verifying processes, 6.5.1
- intermediates
-
- entering, 6.4.1
- process terminology table, 6.2
- inventory management
-
- integrating engineering change orders, 7.1.1.1
- integration, 1.2.1
- Item Branch File table (F4102)
-
- overview, 2.3
- using the time basis code, 5.5.1.2
- Item Branch/Plant program (P41026)
-
- specifying lead times, 5.5.1
- Item Cost Component Add-Ons table (F30026)
-
- entering work center efficiency, 5.3.5
- Item Cross Reference File table (F4104), 2.3
- Item Location File table (F41021), 2.3
- Item Manufacturing Data table (F4101M), 2.3
- Item Master program (P4101)
-
- specifying lead times, 5.5.1
- Item Master table (F4101), 2.3
- item to line relationships
-
- setting up for repetitive manufacturing, 3.7.1.2
- items
-
- defining affected, 7.3.10
- defining bulk items, 4.3.7
- defining nonstock, 4.3.5
- defining phantoms, 4.3.2
- defining substitutes, 4.3.3
K
- Kanban Card Detail table (F30161), 2.3
- Kanban Master table (F3016), 2.3
- kanbans
-
- setting up for repetitive manufacturing, 3.7.1.2
- kit information
-
- entering, 4.5.1.1
- kits
-
- entering, 4.5.1.1
L
- labor hours, 5.5.1.1
- lead time concepts
-
- labor hours, 5.5.1.1
- machine hours, 5.5.1.1
- move hours, 5.5.1.1
- prime load codes, 5.5.1.1
- purchased parts, 5.5.1.1
- queue hours, 5.5.1.1
- resource units, 5.5.1.1
- setup hours, 5.5.1.1
- time basis codes, 5.5.1.1
- total queue and move hours, 5.5.1.1
- lead times
-
- calculating, 5.5.1
- calculating cumulative, 5.5.2.3
- calculating data, 5.5.1
- calculating for Demand Flow Manufacturing, 5.5.1
- calculating level, 5.5.2.1
- calculating manufacturing, 5.5.2.2
- calculating per unit, 5.5.2.4
- calculating setup hours, 5.5.2.5
- concepts, 5.5.1.1
- cumulative, 5.5.1
- determining variable, 5.5.1.3
- factors, 5.5.1
- generating, 5.5.2
- levels, 5.5.1
- manufacturing, 5.5.1
- overview, 5.5.1
- per unit, 5.5.1
- setting up overlapping and concurrent operations, 5.5.1.4
- types, 5.5.1
- using fixed, 5.5.1.2, 5.5.1.3
- using variable, 5.5.1.2
- using work order start date, 5.5.1.2
- Leadtime Rollup program (R30822A)
-
- generating lead times, 5.5.2
- processing options, 5.5.4
- leadtimes
-
- generating, 5.5.3
- level lead times
-
- calculating, 5.5.2.1
- manufactured product types, 5.5.1
- overview, 5.5.1
- Line Type Control Constants File table (F40205), 2.3
- low-level codes
-
- checking, 4.6.1
- updating, 4.6.1
M
- machine hours, 5.5.1.1
- manufacturing
-
- process, 6.1
- process terminology, 6.2
- repetitive, 3.7.1
- repetitive example, 3.7.1.1
- repetitive terminology, 3.7.1.2
- setting up information, 3.1
- types, 2.1.2
- manufacturing bills of material, 4.2.4
- manufacturing constants
-
- constants, 3.5.1
- Manufacturing Constants program (P3009)
-
- overview, 3.5.1
- setting up master routings, 5.1.1
- setting up shifts, 3.7.1.3
- usage, 3.7.3
- Manufacturing Constants Revision form, 3.5.2, 3.5.3, 3.7.2, 3.7.3
- Manufacturing Constants table (F3009), 2.3
-
- retrieving work hours per day, 5.5.1.3
- manufacturing lead times, 5.5.1
-
- calculating, 5.5.2.2
- manufactured product types, 5.5.1
- master production schedule, 1.2.2
- master routing instructions, 5.1.1
- Material Where Used program (R30420), A.2, A.3.1
-
- processing options, A.3.2
- move hours, 5.5.1.1
- Multi Level Ingredient program (R30460), A.2
-
- printing, A.3.3
- multiple bills of material
-
- changing, 4.7.1
N
- nonstock items
-
- defining, 4.3.5
O
- operation scrap percents, 5.4.1.1
- operation start and due dates
-
- determining variable lead times, 5.5.1.3
- using fixed lead time, 5.5.1.3
- operation start dates, 5.5.1.3
- Operation Type field
-
- setting up alternate routing steps, 5.4.1
- operational planned yield percents, 5.4.1.1
- operations
-
- defining routing instructions, 5.1.1
- entering, 6.4.4
- entering processes, 6.4.1
- setting up overlapping and concurrent, 5.5.1.4
- Order Approval Audit table (F4818), 2.3
- Order Processing program (R31410)
-
- creating routings, 5.4.1
- Order Routing Approval Master table (F4808), 2.3
- Order Specific Routing Approval Revisions form, 3.8.3
- Order Type Conversion program (R31P802)
-
- processing options, 3.6.5
- Order Type user-defined codes (48/OT), 3.8.4
- outside operations
-
- entering, 5.4.1, 5.4.1, 5.4.5, 6.4.5
- overview
-
- product, 2.1
P
- P0004A program, 3.2
- P0006 program
-
- setting up work centers, 5.3.2
- P00191 program
-
- overview, 3.3.1
- processing options, 3.3.3
- P1609 program
-
- entering activity codes, 5.4.1
- P3002 program
-
- entering grade and potency information, 4.5.4
- entering or changing bills of material, 4.5.4
- entering planning bills and kit information, 4.5.4
- processing options, 4.5.3
- usage, 4.5.1
- P3002S program, 4.5.1
- P3003 program
-
- creating routing instructions, 5.4.1
- entering co- and by-products list, 6.4.8
- entering co-products and by-products list, 6.4.1
- entering ingredients, 6.4.1
- entering intermediates, 6.4.1, 6.4.9
- entering outside operations, 6.4.5
- entering process ingredients, 6.4.6
- entering process operations, 6.4.4
- entering production information, 6.4.1
- entering substitute ingredients, 6.4.7
- processing options, 5.4.3
- reviewing process instructions, 6.5.7
- usage, 6.4.4
- P3006 program
-
- entering costing and accounting information, 5.3.1.1
- entering work center rates, 5.3.1.1
- processing options, 5.3.4
- P3007 program
-
- processing options, 3.7.4
- setting up resource units for shifts, 3.7.1.3
- usage, 3.7.5
- P3009 program
-
- overview, 3.5.1
- setting up master routings, 5.1.1
- usage, 3.7.3
- P3013 program
-
- processing options, 7.3.9
- usage, 7.3.10, 7.3.11
- P30135 program
-
- locating revision information, 7.4.6
- processing options, 7.4.5
- P3015 program
-
- processing options, 4.5.6
- usage, 4.5.1.2, 4.5.7
- P30200 program
-
- locating multilevel bills of material, 4.6.1
- locating single-level bills of material, 4.6.1
- processing options, 4.6.5
- P30201 program
-
- processing options, 4.6.8
- P30204 program
-
- processing options, 4.6.10
- usage, 4.6.11
- P30210 program
-
- processing options, 6.5.4
- P30220 program
-
- processing options, 7.4.9
- reviewing open tasks, 7.4.10
- P30225
-
- usage, 7.3.5
- P30225 program
-
- locating existing engineering change orders, 7.3.1
- processing options, 7.3.4
- P3093 program
-
- updating materials and labor hours, 5.4.1.1
- P31410 program
-
- creating purchase orders for subcontracted operations, 5.4.5
- P40040 program
-
- setting up constants, 3.6.1
- P4101 program
-
- specifying lead times, 5.5.1
- P41026 program
-
- specifying lead times, 5.5.1
- P48020 program
-
- creating engineering change requests, 7.3.2
- defining routing instructions, 7.3.1.1
- entering engineering change orders, 7.3.1
- processing options, 7.3.6
- usage, 7.3.7, 7.3.8
- P4808 program
-
- processing options, 3.8.5
- usage, 3.8.1.1, 3.8.6
- P4818 program
-
- approving engineering change orders, 7.4.12
- processing options, 7.4.11
- reviewing engineering change orders for approval, 7.4.1
- P48182 Program
-
- usage, 3.8.7
- P48185 program
-
- locating approval audit information, 7.4.8
- processing options, 7.4.7
- Parent and Component Relationship diagram, 4.3.1
- parent and component relationships
-
- defining, 4.3.1
- part replacement
-
- defining, 4.3.8
- parts
-
- replacing, 4.3.8
- pending engineering change orders
-
- reviewing, 7.3.1.4
- per unit lead times
-
- calculating, 5.5.2.4
- manufactured product types, 5.5.1
- overview, 5.5.1
- percent bills of material
-
- example, 6.1.2
- overview, 4.2.3
- process terminology table, 6.2
- phantom items
-
- defining, 4.3.2
- Phase In user-defined codes (40/PH), 3.8.4
- Planned Yield Update program (R3093)
-
- processing options, 5.4.7
- updating materials and labor hours, 5.4.1.1
- planning bills and kit information
-
- entering, 4.5.1.1
- planning bills of material
-
- entering, 4.5.1.1
- overview, 4.2.1
- potency information
-
- entering, 4.5.4
- prime load codes, 5.5.1.1
- process ingredients
-
- entering, 6.4.1, 6.4.6
- Process Inquiry form, 6.5.2, 6.5.7
- process manufacturing
-
- changing multiple processes, 6.4.1
- entering co-products and by-products list, 6.4.1
- entering ingredients, 6.4.1
- entering intermediates, 6.4.1
- entering process operations, 6.4.1
- entering processes, 6.4.1
- entering production information, 6.4.1
- example, 6.1.1
- overview, 2.1.4, 6.1
- terminology, 6.2
- verifying processes, 6.5.1
- process operations
-
- entering, 6.4.1
- Process Report program (R30435), A.2
- process routing instructions
-
- process terminology table, 6.2
- process terminology
-
- alternate operations, 6.2
- batch processes, 6.2
- by-products, 6.2
- co-products, 6.2
- ingredients, 6.2
- intermediates, 6.2
- percent bills of material, 6.2
- process routing instructions, 6.2
- substitutes, 6.2
- processes
-
- changing multiple, 6.4.1
- entering, 6.4.1
- verifying, 6.5.1
- procurement
-
- integration, 1.2.3
- product costing and manufacturing accounting
-
- integration, 1.2.4
- product data management
-
- bills of material, 4.1
- bills of material terminology, 4.3
- discrete manufacturing, 2.1.3
- features, 2.2
- implementation steps, 1.3.2
- implementing, 1.3
- overview, 1.1, 2.1
- process manufacturing, 2.1.4
- repetitive manufacturing, 2.1.5, 3.7.1
- reports table, A.2
- setting up, 3.1
- setting up manufacturing information, 3.1
- system integration, 1.2
- types of bills of material, 4.2
- usage, 2.1.2
- product data management setup
-
- overview, 3.1
- product lead times
-
- cumulative types, 5.5.1
- level types, 5.5.1
- manufacturing types, 5.5.1
- per unit types, 5.5.1
- production information
-
- entering, 6.4.1
- entering bills of material, 4.5.1, 4.5.1
- production lines
-
- setting up for repetitive manufacturing, 3.7.1.2
- purchased parts, 5.5.1.1
Q
- quantity data items
-
- Assembly Inclusions Rules table (F3293), 3.4.1
- Bill of Material Master File table (F3002), 3.4.1
- Bill of Materials Change File table (F3011), 3.4.1
- ECO Parts List Detail table (F3013), 3.4.1
- Rules Table Detail table (F3283), 3.4.1
- Work Order LSN table (F3105), 3.4.1
- quantity decimal conversion
-
- overview, 3.4.1
- running, 3.4.2
- Quantity Decimal Conversion program (R30QNTY)
-
- overview, 3.4.1
- processing options, 3.4.3
- queue hours, 5.5.1.1
R
- R30420 program
-
- overview, A.2, A.3.1
- processing options, A.3.2
- R30430 program
-
- overview, A.2
- printing routing instructions, 5.4.1
- R30435 program, A.2
- R30460 program
-
- multi-level ingredients, A.2
- printing, A.3.3
- processing options, A.3.4
- single level ingredients, A.2
- R30510 program
-
- processing options, 7.4.14
- updating bills of material, 7.4.2
- R30520 program
-
- changing multiple bills of material, 4.7.1
- changing multiple processes, 6.4.1
- processing options, 4.7.4
- R30601 program
-
- processing options, 4.6.4
- verifying processes, 6.5.1
- R30822A program
-
- generating lead times, 5.5.2
- processing options, 5.5.4
- R3093 program
-
- processing options, 5.4.7
- R30QNTY program
-
- overview, 3.4.1
- processing options, 3.4.3
- R31410 program
-
- creating routings, 5.4.1
- R31P40039 program
-
- processing options, 3.6.3
- R31P802 program
-
- processing options, 3.6.5
- R48020P program, A.2
-
- overview, A.3.5
- processing options, A.3.6
- R48181 program
-
- notifying reviewers of engineering change orders, 7.3.1.5
- processing options, 7.3.14
- R48421 program
-
- overview, A.2
- printing engineering change order information, A.3.7
- related items, 7.3.1.3
- repetitive manufacturing
-
- example, 3.7.1.1
- overview, 2.1.5, 3.7.1
- setting up, 3.7.1
- setting up bills of material, 3.7.1.2
- setting up item to line relationships, 3.7.1.2
- setting up kanbans, 3.7.1.2
- setting up manufacturing constants, 3.7.1.3
- setting up production lines, 3.7.1.2
- setting up resource units for shifts, 3.7.1.3
- setting up routing instructions, 3.7.1.2
- setting up shift calendars, 3.7.1.3
- setting up shift information, 3.7.1.3
- terminology, 3.7.1.2
- reports table, A.2
- requirements planning
-
- integration, 1.2.2
- resource requirements planning
-
- integration, 1.2.7
- resource units
-
- lead time concepts, 5.5.1.1
- setting up shifts, 3.7.1.3
- Revise Single Business Unit program (P0006)
-
- setting up work centers, 5.3.2
- revision levels, 7.1.1.3
- routing instruction creation
-
- overview, 5.4.1
- routing instructions
-
- creating, 5.4
- defining, 7.3.8
- defining alternate operations, 5.1.1
- defining for engineering change orders, 7.3.1.1
- defining operations, 5.1.1
- entering, 5.4.1, 5.4.4
- features, 2.2.3
- overview, 5.1
- printing, 5.4.1
- setting up batch, 5.1.1
- setting up for repetitive manufacturing, 3.7.1.2
- setting up master routings, 5.1.1
- setting up order-specific approval routing, 3.8.7
- Routing Master File table (F3003), 2.3
- Routing Type user-defined codes (40/TR), 3.2
- Rules Table Detail table (F3283), 3.4.1
S
- sales order management
-
- integration, 1.2.5
- scrap, 5.4.1.1
- setup hours
-
- calculating, 5.5.2.5
- definition, 5.5.1.1
- Setup Hours Calculation diagram, 5.5.2.5
- shift calendars
-
- setting up, 3.7.1.3
- shifts
-
- setting up, 3.7.1.3
- setting up manufacturing constants, 3.7.1.3
- setting up resource units, 3.7.1.3
- shop floor management
-
- integrating engineering change orders, 7.1.1.1
- integration, 1.2.6
- Single Level Ingredient program (R30460), A.2
- standard procedures
-
- assigning messages, 3.3.1
- assigning to work orders, 3.3.1
- setting up, 3.3.1
- Standard Procedures program (P00191)
-
- overview, 3.3.1
- processing options, 3.3.3
- Standard Routing Information program (R30430), A.2
- Standard Routing Information report (R30430)
-
- printing routing instructions, 5.4.1
- start dates
-
- scheduling work orders, 5.5.1.2
- using work order fixed lead time, 5.5.1.2
- using work order variable lead time, 5.5.1.2
- Stocking Type Code user-defined codes (41/I), 3.2
- substitute items
-
- defining, 4.3.3
- substitutes, 6.2
- system integration
-
- engineering change orders, 7.1.1.1
- system setup
-
- setting up manufacturing constants, 3.5.1
- setting up shift calendars, 3.7.1.3
T
- Time Basis Code user-defined codes (30/TB), 3.2
- time basis codes, 5.5.1.1
- tools
-
- defining, 4.3.6
- total queue and move hours, 5.5.1.1
- Type of Day user-defined codes (00/TD), 3.2
- types of manufacturing, 2.1.2
U
- units of measure, 2.1.2
- User Defined Codes program (P0004A), 3.2
- user-defined codes
-
- setting up, 3.2
- setting up for engineering change management, 3.8.4
V
- variable lead times
-
- specifying, 5.5.1
W
- Where Produced Inquiry program (P30210)
-
- processing options, 6.5.4
- reviewing processes, 6.5.1, 6.5.1
- Where Used Update program (R30520)
-
- changing multiple bills of material, 4.7.1
- changing multiple processes, 6.4.1
- WO Supplemental DB User Defined table (F48092), 2.3
- Work Center Arrangement by Operation diagram, 5.1.1
- work center creation
-
- overview, 5.3.1
- Work Center Master (F30006) Conversion program (R8930006C)
-
- setting processing option, 5.3.9
- Work Center Master File table (F30006)
-
- overview, 2.3
- Work Center Master Revisions form, 5.3.3, 5.3.5
- Work Center Master table (F30006)
-
- creating work centers, 5.3.1
- work center operations
-
- reviewing, 5.3.7
- Work Center Rate Revisions form, 5.3.3, 5.3.6
- work center rates, 5.3.1.1
- Work Center Rates File table (F30008), 2.3
- Work Center Resource Unit Revision form, 3.7.2, 3.7.5
- Work Center Resource Units program (P3007)
-
- processing options, 3.7.4
- Work Center Resource Units table (F3007)
-
- overview, 2.3
- using available hours, 5.5.1.3
- Work Center Revision program (P3006)
-
- processing options, 5.3.4
- work centers
-
- creating, 5.3
- defining, 5.1.1
- entering, 5.3.5
- entering accounting information, 5.3.6
- entering costing and accounting information, 5.3.1.1, 5.3.6
- entering costing information, 5.3.6
- entering hours, 5.3.1
- features, 2.2.2, 5.1.1
- overview, 5.1
- work hours per day, 5.5.1.3
- Work Order Generation program (P31410)
-
- creating purchase orders for subcontracted operations, 5.4.5
- Work Order LSN table (F3105), 3.4.1
- Work Order Master File table (F4801), 2.3
- Work Order Priority user-defined codes (00/PR), 3.8.4
- Work Order Routing form, 7.3.3, 7.3.8
- Work Order Routing table (F3112), 2.3
- Work Order Status user-defined codes (00/SS), 3.8.4
- Work Order/ECO Type user-defined codes (00/TY), 3.8.4
- work orders
-
- scheduling start dates, 5.5.1.2
- setting up document type constants, 3.6.1
- using start date fixed lead time, 5.5.1.2
- using start date variable lead time, 5.5.1.2
- Work With Bill of Material - Tree View form, 4.6.2, 4.6.7
- Work With Bill of Material Where Used form, 4.6.2
- Work with Co-/By-Products Where Produced form, 6.5.2
- Work With ECO Approval/Audit Review form, 7.4.4, 7.4.6
- Work With ECO Revisions Inquiry form, 7.4.4
- Work With ECO Workbench by Item form, 7.3.3, 7.3.5
- Work With Operations Sequence form, 6.5.2
- Work With Work Center Where Used form, 5.3.3, 5.3.7
- Workday Calendar table (F0007), 2.3
Y
- yields
-
- entering cumulative planned yield percents, 5.4.1.1
- entering operation scrap percents, 5.4.1.1
- entering operational planned yield percents, 5.4.1.1