|
Figures |
FIGURE 2-2
Example of a Server Room Layout
FIGURE 2-3
Example Configuration 1--Three Chassis, No External SCSI Devices
FIGURE 2-4
Example Configuration 2--Three Chassis, Two External SCSI Devices
FIGURE 2-5
Physical Specifications for the Netra CT Chassis, DC model
FIGURE 2-6
Physical Specifications for the Netra CT Chassis, AC model
FIGURE 2-7
Netra CT 810 Server Physical Specifications
FIGURE 2-8
Netra CT 410 Server Physical Specifications
FIGURE 2-10
Installing a Grounding Plate
FIGURE 3-1
Center-Mounting the Chassis
FIGURE 3-2
Installing the Mounting Bracket Adapters
FIGURE 3-3
Loosening the Screws at the Top of a Netra CT 810 Server
FIGURE 3-4
Loosening the Screws at the Top of a Netra CT 410 Server
FIGURE 3-5
Loosening the Screws at the Bottom of a Netra CT 810 Server
FIGURE 3-6
Loosening the Screws at the Bottom of a Netra CT 410 Server
FIGURE 3-7
Removing a Netra CT 810 Server From the Chassis
FIGURE 3-8
Removing a Netra CT 410 Server From the Chassis
FIGURE 3-9
Mounting the Netra CT Chassis in a Rack
FIGURE 3-10
Connecting the DC Grounding Cable to the DC Grounding Studs
FIGURE 4-1
Unpacking a Netra CT Server
FIGURE 4-2
Installing a Netra CT 810 Server in the Chassis
FIGURE 4-3
Installing a Netra CT 410 Server in the Chassis
FIGURE 4-4
Tightening the Screws at the Top of a Netra CT 810 Server
FIGURE 4-5
Tightening the Screws at the Top of a Netra CT 410 Server
FIGURE 4-6
Tightening the Screws at the Bottom of a Netra CT 810 Server
FIGURE 4-7
Tightening the Screws at the Bottom of a Netra CT 410 Server
FIGURE 5-1
Attaching the Antistatic Wrist Strap
FIGURE 5-2
Supported Locations for Satellite CPU or I/O Cards in a Netra CT 810 Server
FIGURE 5-3
Supported Locations for Satellite CPU or I/O Cards in a Netra CT 410 Server
FIGURE 5-4
Buses for the Netra CT 810 Server (Front View)
FIGURE 5-5
Buses for the Netra CT 410 Server (Front View)
FIGURE 5-6
Aligning the Card with the Card Cage Cutouts
FIGURE 5-7
Tightening the Ejection Lever Captive Screws
FIGURE 5-8
Supported Locations for Rear Transition Card Sets in a Netra CT 810 Server (Top View)
FIGURE 5-9
Supported Locations for Rear Transition Card Sets in a Netra CT 410 Server (Top View)
FIGURE 5-10
Supported and Unsupported Host CPU Rear Transition Card for a Netra CT Server
FIGURE 5-11
Aligning the Card With the Rear Card Cage Cutouts
FIGURE 6-2
Installing the Cable Management Brackets
FIGURE 6-3
Host CPU Card Locations
FIGURE 6-4
Connectors on the Host CPU Card
FIGURE 6-5
RJ-45 Ethernet Connector Diagram
FIGURE 6-6
CPU Card Front Panel TTY A Diagram
FIGURE 6-7
Host CPU Front Transition Card Location in a Netra CT 410 Server
FIGURE 6-8
Connectors on the Host CPU Front Transition Card (Netra CT 410 Server)
FIGURE 6-9
Parallel Connector
FIGURE 6-10
RJ-45 Ethernet B Connector Diagram
FIGURE 6-11
TTY B Connector
FIGURE 6-12
Supported Locations for a Single-Wide 6U Alarm Card
FIGURE 6-13
Location of Double-Wide 3U Alarm Card
FIGURE 6-14
Plugging in Cables in Alarm Card in Netra CT 810 Server
FIGURE 6-15
Plugging in Cables in Alarm Card in Diskless Netra CT 410 Server
FIGURE 6-16
Connectors on the Alarm Card in Diskfull Netra CT 410 Server
FIGURE 6-17
Alarm Port
FIGURE 6-18
RJ-45 Ethernet Connector Diagram
FIGURE 6-19
RJ-45 Ethernet Connector Diagram
FIGURE 6-20
CPU Rear Transition Card (CPU RTC) in a Netra CT 810 Server (Top View)
FIGURE 6-21
CPU Rear Transition Card (CPU RTC) in a Netra CT 410 Server (Top View)
FIGURE 6-22
Connectors on the CPU Rear Transition Card
FIGURE 6-23
RJ-45 Ethernet Connector Diagram
FIGURE 6-24
Supported Location for the Alarm Rear Transition Card in a Netra CT 810 Server (Top View)
FIGURE 6-25
Supported Location for the Alarm Rear Transition Card in a Netra CT 410 Server (Top View)
FIGURE 6-26
Connectors on the Alarm Rear Transition Card
FIGURE 6-27
RJ-45 Ethernet Connector Diagram
FIGURE 6-28
COM Ports 1 and 2
FIGURE 6-29
Alarm Port
FIGURE 6-31
Stripping the Insulation From the Wire
FIGURE 6-32
Opening the DC Input Plug Cage Clamp Using the Cage Clamp Operating Lever
FIGURE 6-33
Opening the Cage Clamp Using a Screwdriver
FIGURE 6-36
Routing the Wires Out of the Bottom Portion of the Strain Relief Housing
FIGURE 6-39
DC Connector Locations, Front-Access Model
FIGURE 6-41
Disconnecting the DC Input Power Cable From the DC Connector
FIGURE 6-42
Locating the DC Connectors
FIGURE 6-43
AC Connectors on a Netra CT Chassis
FIGURE 7-1
Locating the Power Supply Locking Mechanism on the Netra CT 810 Server
FIGURE 7-2
System Status Panel Locations
FIGURE 7-3
System Power Button and System Power LED Locations (Netra CT 810 Server)
FIGURE 7-4
System Power Button and System Power LED Locations (Netra CT 410 Server)
FIGURE A-1
Locating the SCSI Port on the Host CPU Front Transition Card (Netra CT 410 Server)
FIGURE A-2
SCSI Connector on the CPU Rear Transition Card
Copyright © 2004, Sun Microsystems, Inc. All rights reserved.