Figures |
FIGURE 1-1 Sun StorEdge 6920 System Environment
FIGURE 1-2 Sun StorEdge 6920 System Base Cabinet - Front and Back Views
FIGURE 1-3 Storage Array Configuration Options
FIGURE 2-1 Contents of the Base Cabinet Ship Kit
FIGURE 2-2 Leveling Pads
FIGURE 2-3 Stabilizer Legs
FIGURE 2-4 Installing the Right Stabilizer Leg
FIGURE 2-5 Adjusting the Leveling Pads on the Stabilizer Leg
FIGURE 2-6 Removing the Mounting Screws
FIGURE 2-7 Attaching the Floor-Mounting Brackets
FIGURE 2-8 Expansion Cabinet Service Panel
FIGURE 2-9 FC Cabling Between the Base Cabinet and Expansion Cabinet 1 Service Panels
FIGURE 2-10 FC Cabling Between the Base Cabinet Service Panel, Expansion Cabinet 1, and Expansion Cabinet 2
FIGURE 2-11 Ethernet and Power Sequencer Cabling Between the Base Cabinet and Expansion Cabinet 1 Service Panels
FIGURE 2-12 Ethernet and Power Sequencer Cabling Between the Base Cabinet Service Panel, Expansion Cabinet 1, and Expansion Cabinet 2
FIGURE 2-13 Location of the Key Switch on the Bottom Front Panel of the Base Cabinet
FIGURE 2-14 Attaching the Grounding Cable to the Front AC Power Sequencer
FIGURE 2-15 Rear Power Sequencer Control Panel
FIGURE 2-16 Connecting the Power Cables
FIGURE 2-17 Front Sequencer Status Lights
FIGURE 2-18 USB SANDisk Flash Disk Write Protection Switch
FIGURE 2-19 Storage Service Processor: USB Port 0
FIGURE 2-20 Serial Console Connection
FIGURE 2-21 Local Area Network Connection
FIGURE 2-22 Remote Response Service Connection
FIGURE 4-1 Two SIO-8 Cards
FIGURE 4-2 Two SIO COMBO Cards
FIGURE 4-3 Four SIO COMBO Cards
FIGURE 4-4 Connecting Hosts to a SAN With Failover
FIGURE 4-5 Connecting Hosts Directly
FIGURE 5-1 Physical Storage Components
FIGURE 5-2 Relationships of Logical Storage Components
FIGURE 6-1 External Storage Device Connected Directly to the Service Panel
FIGURE 6-2 External Storage Devices Connected to Dual FC Switches
FIGURE B-1 Location of Key Switch on Bottom Front Panel (Standby Position)
FIGURE B-2 Connections for the Front and Rear Power Sequencers on the Inside of the Base Cabinet Service Panel
FIGURE B-3 Storage Service Processor: USB Relay Cable Connection
FIGURE B-4 Ethernet and Power Sequencer Cabling Between the Base Cabinet and Expansion Cabinet 1
FIGURE B-5 Ethernet and Power Sequencer Cabling Between the Base Cabinet, Expansion Cabinet 1, and Expansion Cabinet 2
FIGURE B-6 Attaching the Grounding Cable to the Front Power Sequencer
FIGURE B-7 Rear Power Sequencer Control Panel
FIGURE B-8 Connecting the Power Cables
FIGURE B-9 Location of the Key Switch on the Bottom Front Panel
FIGURE B-10 AC Power Sequencer Control Panel: Power Off
FIGURE B-11 AC Power Sequencer Control Panel: Power On
FIGURE B-12 AC Power Sequencer Control Panel: Power Off
Copyright © 2005, Sun Microsystems, Inc. All Rights Reserved.