|
Figures |
FIGURE 1-1
Sun StorEdge 6920 System Environment
FIGURE 1-2
Sun StorEdge 6920 System Base Cabinet - Front and Back Views
FIGURE 1-3
Storage Array Configuration Options
FIGURE 2-1
Contents of the Base Cabinet Ship Kit
FIGURE 2-2
Leveling Pads
FIGURE 2-3
Stabilizer Legs
FIGURE 2-4
Installing the Right Stabilizer Leg
FIGURE 2-5
Adjusting the Leveling Pads on the Stabilizer Leg
FIGURE 2-6
Removing the Mounting Screws
FIGURE 2-7
Attaching the Floor-Mounting Brackets
FIGURE 2-8
Expansion Cabinet Service Panel
FIGURE 2-9
FC Cabling Between the Base Cabinet and Expansion Cabinet 1 Service Panels
FIGURE 2-10
FC Cabling Between the Base Cabinet Service Panel, Expansion Cabinet 1, and Expansion Cabinet 2
FIGURE 2-11
Ethernet and Power Sequencer Cabling Between the Base Cabinet and Expansion Cabinet 1 Service Panels
FIGURE 2-12
Ethernet and Power Sequencer Cabling Between the Base Cabinet Service Panel, Expansion Cabinet 1, and Expansion Cabinet 2
FIGURE 2-13
Location of the Key Switch on the Bottom Front Panel of the Base Cabinet
FIGURE 2-14
Attaching the Grounding Cable to the Front AC Power Sequencer
FIGURE 2-15
Rear Power Sequencer Control Panel
FIGURE 2-16
Connecting the Power Cables
FIGURE 2-17
Front Sequencer Status Lights
FIGURE 2-18
USB SANDisk Flash Disk Write Protection Switch
FIGURE 2-19
Storage Service Processor: USB Port 0
FIGURE 2-20
Serial Console Connection
FIGURE 2-21
Local Area Network Connection
FIGURE 2-22
Remote Response Service Connection
FIGURE 4-1
Two SIO-8 Cards
FIGURE 4-2
Two SIO COMBO Cards
FIGURE 4-3
Four SIO COMBO Cards
FIGURE 4-4
Connecting Hosts to a SAN With Failover
FIGURE 4-5
Connecting Hosts Directly
FIGURE 5-1
Physical Storage Components
FIGURE 5-2
Relationships of Logical Storage Components
FIGURE 6-1
External Storage Device Connected Directly to the Service Panel
FIGURE 6-2
External Storage Devices Connected to Dual FC Switches
FIGURE B-1
Location of Key Switch on Bottom Front Panel (Standby Position)
FIGURE B-2
Connections for the Front and Rear Power Sequencers on the Inside of the Base Cabinet Service Panel
FIGURE B-3
Storage Service Processor: USB Relay Cable Connection
FIGURE B-4
Ethernet and Power Sequencer Cabling Between the Base Cabinet and Expansion Cabinet 1
FIGURE B-5
Ethernet and Power Sequencer Cabling Between the Base Cabinet, Expansion Cabinet 1, and Expansion Cabinet 2
FIGURE B-6
Attaching the Grounding Cable to the Front Power Sequencer
FIGURE B-7
Rear Power Sequencer Control Panel
FIGURE B-8
Connecting the Power Cables
FIGURE B-9
Location of the Key Switch on the Bottom Front Panel
FIGURE B-10
AC Power Sequencer Control Panel: Power Off
FIGURE B-11
AC Power Sequencer Control Panel: Power On
FIGURE B-12
AC Power Sequencer Control Panel: Power Off
Copyright © 2005, Sun Microsystems, Inc. All Rights Reserved.