Documentation, Support, and Training
Understanding Service Procedures
Inspect the Power Supply Hardware
Inspect the Power Supply Connectors
Servicing the InfiniBand Cables
Inspecting an InfiniBand Cable
Inspect the InfiniBand Cable Hardware
Identify the prerequisite and subsequent service tasks you must perform in conjunction with this procedure.
Note - You must remove all InfiniBand cables from the switch and power down both power supplies by removing both power cords. See Remove an InfiniBand Cable and Power Off a Power Supply.
Disconnect the management cables.
Use a No. 2 Phillips screwdriver to remove the four screws that secure the front of the switch into the rack.
Slide the switch out of the front of the rack.
Set the switch chassis onto a stable work surface.