Exit Print View

Sun Datacenter InfiniBand Switch 72 Topic Set

Get PDF Book Print View
 

Document Information

Using This Documentation

Related Documentation

Documentation, Support, and Training

Documentation Feedback

User Guide

Installing the Switch

Administering the Switch

Servicing the Switch

Understanding Service Procedures

Replaceable Components

Servicing the Power Supplies

Inspecting a Power Supply

Identify the Power Supply

Inspect the Power Supply Hardware

Inspect the Power Supply Connectors

Power Off a Power Supply

Remove a Power Supply

Install a Power Supply

Power On a Power Supply

Servicing the Fans

Inspecting a Fan

Identify the Fan

Inspect the Fan Hardware

Inspect the Fan Connector

Remove a Fan

Install a Fan

Servicing the InfiniBand Cables

Inspecting an InfiniBand Cable

Identify the InfiniBand Cable

Inspect the InfiniBand Cable Hardware

Inspect the InfiniBand Cable Connectors

Remove an InfiniBand Cable

Install an InfiniBand Cable

Servicing the Battery

Remove the Switch From the Rack

Replace the Battery

Upgrading the Firmware

Reference

Understanding the Commands

Index

Power Off a Power Supply


Note - Powering off both power supplies consequently powers off the switch.


  1. Identify the prerequisite and subsequent service tasks you must perform in conjunction with this procedure.

    See Servicing the Power Supplies.

  2. Determine which power supply is to be removed.

  3. At the front of the switch chassis, remove the power cord from the respective power supply.


    Illustration shows the power cord being removed.

    The power supply is completely powered off.

  4. Remove the power supply.

    See Remove a Power Supply.

Related Information