Sun StorEdge 3000 Family FRU Installation Guide
816-7326-16
Contents |
1. Sun StorEdge 3000 Family FRUs
1.2 Static Electricity Precautions
2. Disk Drive, Air Management Sled, and Tabletop Cover FRUs
2.1.1 Identifying the Defective Disk Drive
2.1.2 Removing a Defective Disk Drive
2.1.3 Installing a New Disk Drive
2.1.4 Scanning the New Drive and Related Procedures
2.2 Installing an Air Management Sled
2.3 Adding or Removing the Tabletop Cover
2.3.1 Converting a Rack-Ready Array to a Tabletop Array
2.3.2 Converting a Tabletop Array to a Rack-Ready Array
3.1 Replacing Power Supply/Fan Modules for 2U Arrays
3.1.1 Removing an AC Power Supply/Fan Module
3.1.2 Installing an AC Power Supply/Fan Module
3.1.3 Replacing a DC Power Supply/Fan Module
3.2 Replacing Power Supply and Fan Modules for 1U Arrays
3.2.1 Replacing an AC Power Supply/Fan Module
3.2.2 Replacing a DC Power Supply/Fan Module
4.2 Battery Status on the Initial Firmware Screen
4.3 Battery Dating on the Battery Labels
4.4.1 Replacing a SCSI Battery
4.5 FC Battery Status and In-Service Date Procedures
4.5.1 Viewing Status and Setting the In-Service Date with the CLI
4.5.2 Viewing Status and Setting the In-Service Date with SSCS
4.5.3 Verifying the In-Service Date When Replacing a Battery in SSCS
5.1 Replacing an I/O Controller Module
5.1.1 Saving the Configuration Settings to NVRAM
5.1.2 Removing an I/O Controller Module
5.1.3 Installing an I/O Controller Module
5.1.4 Monitoring the Automatic Firmware Update with a Recently Installed Controller FRU
5.1.5 SES Firmware Update Sometimes Required with I/O Controller Module Replacements
5.1.6 Converting a Dual-Controller Array to a Single Controller Array
5.1.7 I/O Controller Replacement for a Single-Controller or Powered-Off Array
5.2 Replacing I/O Expansion Modules
5.2.1 Removing the I/O Expansion Module
5.2.2 Installing the I/O Expansion Module
5.3 Installing Small Form-Factor Pluggable Transceivers
5.4 Installing a RAID/Expansion Chassis FRU
5.5 Converting an FC JBOD to an FC RAID Array
6.1 Replacing a SCSI Controller Module
6.1.1 Saving the Configuration Settings to NVRAM
6.1.2 Removing a SCSI Controller Module
6.1.3 Installing a SCSI Controller Module
6.1.4 Monitoring the Automatic Firmware Update with a Recently Installed Controller FRU
6.1.5 Replacing a Single-Controller Array or Powered Off Array
6.2 Replacing SCSI I/O Modules
6.2.1 Installing Gaskets If Needed
6.2.2 Removing the SCSI I/O Module
6.2.3 Installing a SCSI I/O Module
6.3 Replacing the SCSI Terminator Module
6.3.1 Removing the SCSI Terminator Module
6.3.2 Installing a Terminator Module
6.4.2 Installing an EMU Module
6.5 Installing a RAID/Expansion Chassis FRU
6.6 Special JBOD Usage With External Terminators
6.6.1 External Terminators for Special Dual-Bus JBOD Maintenance
6.6.2 Older JBOD Dual-Bus Configurations
6.7 Installing a Filler Panel on a SCSI Array
7.1 Installing an Expansion Chassis FRU
Copyright © 2004, Sun Microsystems, Inc. All rights reserved.