Use this procedure to lower the power limit used by individual SPARC T5-1B server modules so that more server modules can be used in the chassis.
For comprehensive instructions about the Oracle ILOM commands listed in this procedure, refer to the Oracle ILOM Administrator's Guide for Configuration and Maintenance, setting power alert notifications and managing system power usage.
In a browser address field, enter the CMM's IP address, press Return, and log in.
The Power Allocation Plan is displayed.
This value is your power budget for adding additional components.
Select a power budget lower than the lowest power budget suggested by the calculator. When you apply the lower power budget to the server modules, you can install more server modules in the chassis.
Refer to the SPARC T5-1B Server Module Installation Guide for details.
In the upper left corner, in the Manage pull-down menu, select the server module.
Set the Target Limit between the minimum power drawn by the server module and the maximum power the server module is permitted to consume (peak permitted).
Return to the Summary page and power up the server module.
If you need to make additional adjustments, repeat Step 5.