Go to main content
2/32
List of Figures
1-1 Enterprise Requirements Planning and Execution (ERPxE)
1-2 Product Data Management System
2-1 Item Entry Tracking
2-2 Item Master Customization
2-3 Records for Item Branch Information
3-1 Item Master Information screen
3-2 Item Alternative Description screen
3-3 Text Messages screen
3-4 Classification Code screen
3-5 Classification Code (Enter Information) screen
3-6 Item Unit of Measure Example
3-7 Default Units of Measure screen
3-8 Item Units of Measure screen
3-9 Manufacturing Values Entry screen
4-1 item A Master Information
4-2 Item A Information
4-3 Item Branch/Plant Information screen
4-4 Primary Location screen
4-5 Item/Location Information screen
4-6 Item Location/Information (Primary Location) screen
4-7 Item Branch/Plant Information (Manufacturing) screen
5-1 Super Bill of Material
5-2 Modular Bill of Material
5-3 Bill of Material Configurations
5-4 Parent/Child Relationship in a Single-Level Bill of Material
5-5 Parent/Child Relationship in an Indented Bill of Material
5-6 Work Center
5-7 Work Center Integration
5-8 Inefficient Work Flow
5-9 Efficient Work Flow
5-10 Work Center Routings
6-1 Commitment Flowchart
6-2 Manufacturing Constants screen
6-3 Bill of Material Types screen
6-4 Time Basis Code screen
6-5 Standard Procedure Descriptions screen
6-6 General Message screen
6-7 Shop Floor Calendar screen
6-8 Calendar Generation screen
6-9 Make/Buy Table screen
6-10 Routing Types screen
6-11 Kanban Master Revisions screen
6-12 Kanban Master Revisions (Details) screen
7-1 Enter/Change Bill screen
7-2 Enter/Change Bill (Details) screen
7-3 Component Substitutes screen
7-4 Component Locator Revisions screen
7-5 BOM Component Master Text screen
7-6 Text Model Selection screen
7-7 User Information screen
7-8 Where Used BOM Update Report
7-9 Bill of Material Analysis Report with Errors
7-10 Bill of Material Analysis Report without Errors
8-1 Revision Level screen
8-2 Single Level Bill Inquiry screen
8-3 Multi-Level Bill Inquiry screen
8-4 Single Level Item Where Used screen
8-5 Multi Level Item Where Used screen
8-6 Bill Comparison screen
8-7 BOM Change File Inquiry screen
8-8 Single Bill of Material Report
8-9 Bill of Material Multi Level Report
8-10 Material Where Used Report
8-11 Bill Comparison Report
9-1 Enter/Change Work Center screen
9-2 Work Center Rate Revisions screen
9-3 Operations by Work Center screen
10-1 Enter/Change Routing screen
10-2 Enter/Change Routing (Engineering) screen
10-3 Manufacturing Constants screen
10-4 Stem Branch/Plant Information screen
10-5 Enter/Change Routing (Master Routing) screen
10-6 Item Cross-Reference History screen
10-7 Item X-Reference Revision screen
10-8 Routing Operation Master Text screen
10-9 Text Model Selection screen
10-10 User Information screen
10-11 Routing Inquiry screen
10-12 Standard Routing Information Report
11-1 Leadtime Inquiry screen
12-1 ECO Process
13-1 Next Revision Levels screen
13-2 Next Revision Levels (Type Code) screen
13-3 Priority Code screen
13-4 Status Code screen
13-5 Phase Code screen
13-6 Existing Disposition Code screen
13-7 Reason Code screen
13-8 Next Numbers screen
13-9 Approval Routing Master screen
13-10 Order Specific Routing screen
14-1 ECO Workbench screen
14-2 ECO Workbench (Details) screen
14-3 Enter/Change ECO screen
14-4 Routing Revisions screen
14-5 Routing Revisions (Details) screen
14-6 ECO Parts List screen
14-7 ECO Parts List (More Details) screen
14-8 ECO Parts List (Engineering) screen
14-9 ECO Pending Orders screen
14-10 ECO Detail Types screen
15-1 ECO Revision Inquiry screen
15-2 ECO Approval/Audit Review screen
15-3 ECO Open Task Review screen
15-4 Future Bill Inquiry screen
15-5 Branch Quantity/Type Selection screen
15-6 ECO Work Order Print
15-7 ECO Summary by Branch/Plant
16-1 ECO Approval screen
A-1 Total Queue/Move Hours
A-2 Sum of Setup Hours
A-3 Level Lead Time Formula
A-4 Per Unit Lead Time Formula
A-5 Cumulative Lead Time Formula
A-6 Manufacturing Lead Time Formula
Scripting on this page enhances content navigation, but does not change the content in any way.