Go to main content
Oracle® F2 Long Range InfiniBand Module User's Guide

Exit Print View

Updated: December 2016
 
 

Install the Module

  1. Identify the prerequisite and subsequent installation tasks that you must perform in conjunction with this task.

    See Installation Task Overview.

  2. If the rack rear door is installed, open it.
  3. Remove the module from its antistatic packaging.
  4. Remove the port plug from the MBOM connector at the rear of the module.

    Caution

    Caution  -  Ensure that the port plug is removed from the module prior to inserting the module in the I/O slot.



    image:Figure showing the removal of the port plug.
  5. Squeeze the top and bottom of the release lever, and move the release lever to the fully open position.
    image:Illustration shows opening the release lever.
  6. Align the module to the slot where you are installing it.

    The LEDs and data cable receptacles face you, and the release lever is to the upper right.

  7. Slide the module into the chassis.
    image:Illustration shows installing and securing the module into the                             slot.
  8. When the module is almost completely seated in the slot and the release lever begins to rise, press down slightly on the top of the module to ensure that the notch at the end of the release lever catches on to the groove in the slot in order to secure the module.

    Note -  Ensure the handle appears in the fully locked position, as in the illustration, when fully engaged.

    image:Illustration showing final position of the release lever after the                             module is properly installed.
  9. Wait approximately 30 seconds to verify that the green OK LED lights.
  10. Connect the data cables to the module.

    See Connect Cables.

Related Information