Go to main content
Oracle® F2 Long Range InfiniBand Module User's Guide

Exit Print View

Updated: December 2016
 
 

Installation Task Overview

Step
Description
Links
1.
Verify shipped components and accessories.
2.
Familiarize yourself with the module, and the receptacles and LEDs on the front panel of the module.
3.
Gather necessary cables.
4.
Confirm power consumption allowances, and hardware and software requirements.
5.
Review handling and ESD precautions.
6.
Remove any filler panel, if installed.
7.
Install the module.
8.
Connect the cables.
9.
Verify the module installation.
10.
Configure the module features.

Related Information