Pipeline in Planning and Budgeting Sync
If you want to use NetSuite to schedule and run a pipeline job configured in Data Exchange, you need to add the job in NetSuite. Then, you can set up the job as needed.
To add and set up a pipeline job:
-
In NetSuite, go to NetSuite EPM > Planning and Budgeting > Manage Jobs.
-
On the Manage Jobs page, do one of the following:
-
In the list of jobs, click Edit next to a pipeline job of your choice.
-
If you don't see the pipeline job in the list, click the Add Job button, and follow steps 3 through 6 in Adding a Job in Planning and Budgeting Sync.
-
-
If you want to specify the accounting period during which the pipeline job should be executed, click the Job Parameters subtab, and do the following:
-
From the Period Type list, select one of the following:
-
Relative to specify an accounting period that is relative to the current date.
Important:Ensure that the periods configured in Data Exchange match those defined in NetSuite at Setup > Accounting > Manage Accounting Periods.
-
Absolute to set up a specific accounting period name.
-
-
From the Start Period and End Period lists, select the accounting periods as follows:
-
If you've selected Absolute as the Period Type, select from the list of available accounting periods. For more information about managing accounting periods, see Manage Accounting Periods Page.
-
If you've selected Relative as the Period Type, select one of the following accounting periods:
-
This Fiscal Year
-
This Fiscal Quarter
-
This Month
-
Last Fiscal Year
-
Last Fiscal Quarter
-
Last Month
Note:When a fiscal year or quarter is selected for Start Period, the first month of the selected period is used. When a fiscal year or quarter is selected for End Period, the last month of the selected period is used.
-
-
-
From the Import Mode list, select one of the following:
-
Replace
-
Append
-
No Import
-
Map and Validate
-
-
From the Export Mode list, select one of the following:
-
Merge
-
Accumulate
-
Replace
-
No Export
-
-
In the Attach Logs field, select Yes if you want the execution logs to be zipped and included as an attachment in an email notification. The default value is No.
-
In the Send Mail field, specify when an email notification with job execution details should be sent to the email recipient. The available options are:
-
No
-
Always
-
On Failure
-
On Success
-
-
In the Send To field, enter the recipient's email address.
Important:Make sure that all fields required by Data Exchange are filled out in NetSuite. Leaving any required field blank may result in job failure.
-
-
To schedule the pipeline job, click the Schedule subtab, and follow step 3 in Scheduling a Job in Planning and Budgeting Sync.
-
For optional setup of the pipeline job, click the Options subtab. Then, from the Post–Processing Plug-ins list, select a plug-in of your choice. The field is set to None by default.
For information about how you can use post-processing plug-ins for the integration purposes, see Post-Processing Plug-ins in Planning and Budgeting Sync.
-
Click Save.
For general information about using pipeline jobs in Data Exchange, see the Oracle Help Center topics Using the Pipeline and Running the Pipeline.
Related Topics
- Job Types in Planning and Budgeting Sync
- Batch Job in Planning and Budgeting Sync
- Business Rule in Planning and Budgeting Sync
- Data Load Rule in Planning and Budgeting Sync
- Data Map in Planning and Budgeting Sync
- Group in Planning and Budgeting Sync
- Import Data/Metadata in Planning and Budgeting Sync
- Rule Set in Planning and Budgeting Sync