Backflush Logic

Backflush enables you to issue components to work orders and complete the assembly at one time.

Backflush is compatible with or without real time build and WIP work orders.

To automatically consume work order components at the standard BOM quantities, when you create a manufacturing work order, check the Backflush box. If you check this box, reporting consumption is unavailable in the mobile scanner, but reporting production is still available. For more information, see Creating a Manufacturing Mobile Work Order.

Automated backflush in Manufacturing Mobile also supports lot controlled items. Lot controlled components are backflushed on a FEFO (First Expiry First Out) basis. If you are an Administrator or a production manager who wants to disable backflush for lot controlled items at an account level, see Configuring Manufacturing Mobile Preferences.

If you do not use bins, the system completes checks at a location level. All stock and logic apply at a location level.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           

The Build Even If Components are Insufficient During Backflush preference determines the behavior for issuing components:

Refer to the following examples of scenarios for WIP and non-WIP work orders with backflush when this preference is set.

WIP Work Orders with Backflush

Component Name

Operation Step

Staging Bin

Work Order BOM Quantity

Staging Bin Available Quantity

COMP1

 

STGBIN1

1

10

COMP2

1

STGBIN1

1

0

COMP3

2

STGBIN1

1

0

COMP4

3

STGBIN1

0.5

10

Operation Step 1 Reported for Quantity of 10

  • Completion Transaction for Qty 10

  • COMP1 Issue Transaction for Qty 10

  • COMP2 Issue Transaction for Qty 0

  • COMP3 Issue Transaction for Qty 0

  • COMP4 will not be processed

  • Warning message in the work messages record for COMP2, COMP3

Non-WIP Orders with Backflush

Component Name

Staging Bin

Work Order BOM Quantity

Staging Bin Available Quantity

COMP1

STGBIN1

1

10

COMP2

STGBIN1

1

0

COMP3

STGBIN1

1

0

COMP4

STGBIN1

0.5

10

Production Quantity for Quantity of 10

  • Build Transaction for Qty 10

  • COMP1 Processed for Qty 10

  • COMP2 Processed for Qty 0

  • COMP3 Processed for Qty 0

  • COMP4 Processed for Qty 5

  • Warning message in the work messages record for COMP2, COMP3

Related Topics

Trigger Builds
WIP Work Orders with Routing
Resolving a Build Failure
Updating Actual Production Dates in Work Orders
Backend Processing Logic

General Notices