Sequence Flow Schedules for a Production Line Using the Scheduling Strategy Defined in Production Scheduling

Lean manufacturers employing flow manufacturing require accurate sequencing on their production lines to ensure balanced workloads, efficient material and labor usage, and reduced waste. Ineffective sequencing can lead to operational challenges such as line imbalances, bottlenecks, and excess inventory.

You can now sequence flow schedules for a production line using the scheduling strategy for an attribute sequence or rule-based sequence as defined in Production Scheduling.

Sequence Flow Schedules for a Production Line

Sequence Flow Schedules for a Production Line

Specify the following sequencing parameters and submit the request to sequence flow schedules:

  • From Date: Refers to the start date of the sequencing horizon.
  • Sequencing Horizon in Days: Refers to the number of days from the start date of the sequencing horizon beyond which flow schedules will not be considered for sequencing.

Specify Sequencing Parameters

Specify Sequencing Parameters

Rules-driven sequencing of production schedules enables lean manufacturers to adjust to demand, improving operational efficiency of flow manufacturing production lines. 

Steps to Enable and Configure

No additional setups are required in Manufacturing.

Refer to the Review the 25D Production Scheduling Schedule a Flow Manufacturing Production Line feature for more details related to the setups required in Production Scheduling.

Tips And Considerations

Review the following Production Scheduling features:

  • 26A: Use Sequencing Rules to Schedule Production Lines to know more about how production lines are scheduled by applying attribute-based sequencing rules that control how flow schedules are sequenced.
  • 25D: Schedule a Flow Manufacturing Production Line to know more about how flow schedules on a production line within the schedule horizon are sequenced.

Key Resources

Access Requirements

Users who are assigned a configured job role that contains these privileges and codes can access this feature:

  • Manufacturing Privileges
    • Manage Flow Schedules by Service (WIP_MANAGE_FLOW_SCHEDULES_SERVICE)
    • Manage Flow Schedules (WIP_MANAGE_FLOW_SCHEDULES)
    • View Flow Schedules (WIP_VIEW_FLOW_SCHEDULES)
    • Get Flow Schedules by Service (WIP_GET_FLOW_SCHEDULES_SERVICE)

These privileges were available prior to this update.