2.2 Installation Phases
The general installation strategy is to IPM the E5-APP-B server and then install the application.
The following table illustrates the progression of the installation process by procedure with estimated times. The estimated times and the phases that must be completed may vary due to differences in typing ability and system configuration. The phases outlined in Table 6are to be executed in the order they are listed.
Table 2-4 Installation Phases
| Phase | Elapsed Time (Minutes) | Activity | Procedure | |
|---|---|---|---|---|
| This Step | Cum. | |||
|
Connectivity setup |
15 |
15 |
Set up connectivity to the MPS Servers. |
|
|
Verify install |
5 |
20 |
Verify this should be an install. |
|
|
Requirements check |
15 |
35 |
Verify requirements for install are met. |
|
|
IPM both servers |
90 |
125 |
IPM both ELAP servers with TPD 8.10 |
|
|
Pre-install health check |
5 |
130 |
Run the syscheck utility to verify that all servers are operationally sound. |
|
|
Configure both servers |
10 |
140 |
Set hostname, designation, function, time zone and time on both servers |
|
|
Install Servers |
30 |
170 |
Install software on sides 1A and 1B |
|
|
Configure Switches |
30 |
200 |
Configure the Switches |
For Telco Switch-Procedure 11 For Cisco Switch- Procedure A.2 |
|
Post-install application processing |
30 |
230 |
Perform first time configuration. |
|
|
Post-incremental upgrade health check |
5 |
235 |
Run the syscheck utility to verify all servers are operationally sound. |
|
|
LSMS SSH Key Exchange |
10 |
245 |
Perform SSH key exchange with the LSMS. |
|
|
Accept the upgrade after successful installation |
10 |
255 |
Accept the upgrade on both MPS-A and MPS-B |
|
|
Post-incremental upgrade health check |
10 |
265 |
Run the syscheck utility to verify all servers are operationally sound. |
|