Scenario | When to Use It | Result |
|---|---|---|
Immediate Automatic EVR | Voltage reduction must begin as soon as the reviewed request is created. | Creates the EVR event and switching sheet and submits eligible reduction steps for immediate execution. |
Scheduled Automatic EVR | Reduction is required during a defined future operating window. | Creates a scheduled sheet. Reduction steps are scheduled for the Start Date; restore steps are scheduled for the End Date when configured. |
Manual EVR Review | The request must be recorded and reviewed before any control work is prepared. | Creates the EVR event and report but does not create or submit a sheet from the main tool. |
Manual Sheet Generation | A manual EVR event has been reviewed, and the operator is ready to prepare control steps. | Generates a switching sheet for review from the EVR Report without submitting it for execution. |
Pre-EVR Restoration | Devices must return to the settings in effect before the EVR operation. | Generates restore steps from captured pre-EVR setpoint, bandwidth, and low-limit values. |
Nominal Restoration | Devices must return to configured nominal settings rather than the preceding operating settings. | Generates nominal restore steps when Power Flow data and licensing are available. |
Record | Purpose | Executes Controls |
|---|---|---|
EVR Request | Defines the scope, reduction percentage, execution mode, restore mode, device category, overrides, and schedule. | No |
Working Solution | Contains the fetched devices and their calculated or edited values for the current request. | No |
Saved EVR Case | Stores a reusable snapshot of a request and its device solution. Opening it creates a working copy. | No |
EVR Event | Provides the Work Agenda record used to track the EVR life cycle and access the EVR Report. | No, by itself |
EVR Report | Provides request, calculation, sheet-generation, execution, and restore messages plus the device solution summary. | No |
EVR Switching Sheet | Contains the reduction or restore operations that can be reviewed, scheduled, locked, and executed. | Yes, when submitted or executed |
Request Choice | System Result | Operator Next Step |
|---|---|---|
Automatic - Immediate | Creates or reuses the EVR event and sheet and submits the sheet for immediate execution. | Monitor the event, sheet, and actual SCADA values. |
Automatic - Scheduled | Creates or reuses the event and scheduled sheet. The sheet remains queued until the first scheduled block is due. | Verify Start Date, End Date, device blocks, and Scheduled Time values. |
Manual | Creates or reuses the EVR event and report. No sheet is created from the main tool. | Review the EVR Report and generate a review sheet when ready. |
Restore Mode | Value Source | Operational Use |
|---|---|---|
Pre-EVR | Setpoint, bandwidth, and low-limit values captured for the EVR operation. | Return devices to the settings that were active before EVR. |
Nominal | Nominal values provided through Power Flow. | Return devices to the configured nominal baseline, which can differ from pre-EVR settings. |
Value | Source or Precedence |
|---|---|
Current Setpoint | Usable current SCADA value refreshed for Analysis. |
Calculated Target Setpoint | Current setpoint reduced by the requested percentage. |
Edited Target Setpoint | Operator-entered target for an active phase. Review it after any subsequent Analysis. |
Target Bandwidth | Device-specific edit; otherwise, the global bandwidth override; otherwise, the current SCADA bandwidth, when available. |
Target Low Limit | Device-specific edit; otherwise, the global low-limit override; otherwise, the current SCADA low limit, when available. |
Pre-EVR Restore Value | Value associated with the device before EVR execution. |
Nominal Restore Value | Nominal value supplied through Power Flow. |
Calc Status | Meaning and Step Eligibility | Operator Action |
|---|---|---|
Ready | EVR calculated a valid target. The row is eligible for generated steps when Use is set to Enable. | Verify the target, bandwidth, low limit, and intended phases. |
Review | An operator-edited value is present. The row can be eligible for execution after review. | Confirm the edited values before job creation, especially after rerunning Analysis. |
Disabled | The row is excluded by the Use setting and is not used for generated steps. | Re-enable only when the device should participate. |
Blocked | The requested target conflicts with the applicable low limit and is not executable. | Decrease the reduction percentage, apply an approved override, or leave the device excluded. |
No SCADA Setpoint | EVR has no usable current setpoint for the row. No reduction step can be generated. | Verify SCADA availability and quality, or exclude the device. |
Error | EVR could not produce a valid row result. The row is not executable. | Review Message / Reason, correct the condition, and rerun Analysis. |
Action | Use |
|---|---|
Fetch Devices | Discover eligible devices for the selected request scope and category. |
Analysis | Refresh calculation inputs and calculate target values and row statuses. |
Create Job | Create the EVR operational record and, in Automatic mode, create and submit the EVR switching sheet. |
Save Case | Store the current request and device solution as a reusable saved case. |
EVR Saved Solutions | Open the list of saved EVR cases from the File menu. |
Field | Operator Guidance |
|---|---|
Zone / Region | Select the operating scope for device discovery. One or more zones can be shown, depending on configuration. |
Voltage Reduction % | Enter a value greater than 0 and less than 100. EVR applies this percentage reduction to each eligible current setpoint. |
Execution Mode | Select Automatic for sheet creation and submission, or Manual to create the event and report only. |
Restore Mode | Select Pre-EVR or Nominal. Nominal requires Power Flow. |
Device Category | Select All, LTC, or REG to specify which supported device types to find. |
Bandwidth Override | Enable a global target bandwidth. Device-specific edits take precedence. |
Limit Override | Enable a global target low limit. Device-specific edits take precedence. |
Schedule Window | Enable scheduled execution. Confirm that the End Date is later than the Start Date. |
Start Date | Time assigned to scheduled reduction blocks. |
End Date | Time assigned to scheduled restore blocks when restore generation is configured. |