Facility Power Checklist
Complete the following checklist to ensure that the facility power requirements
are met for the data center where the server is installed.
|
|
|
|
|
Do you know the required operating voltage and electric
current level of the server and peripherals?
|
|
|
|
|
Are enough power outlets provided within 2 meters (6.5 feet)
for each rack?
|
|
|
|
|
Do the power outlets have appropriate socket
receptacles?
|
|
|
|
|
Will optional ground cables be attached to the rack?
|
|
|
|
|
Are the circuit breakers for the equipment suitable for
voltage and current-carrying capacities?
|
|
|
|
|
Does the power frequency meet the equipment
specifications?
|
|
|
|
|
Will system power be delivered from two separate power
grids?
|
|
|
|
|
Is there a UPS to power the equipment?
|
|
|
|
|
Do you have the minimum required power sources to support the
power load for the new hardware? Use kilowatt (kW)/kilovolt
(kVA) to express power load.
|
|
|
|
|
|