JavaScript is required to for searching.
Skip Navigation Links
Exit Print View
Oracle Switch ES1-24 Documentation
search filter icon
search icon

Document Information

Using This Documention

Product Notes

Related Documentation

CLI Command Modes

Feedback

Support and Accessibility

Installation

Understanding the Installation

Installation Task Overview

Front Panel Components

Rear Panel Components

Confirming Specifications

Physical Specifications

Electrical Specifications

Environmental Specifications

Understanding Cabling

Understanding Management and Power Cabling

Understanding Data Cabling

Single-Switch Location Guidelines

Preparing for Installation

ESD Precautions

Tools Needed for Installation

Verify Switch Kit Contents

Verify Rack Rail Kit Contents

Assemble an SFP+ Data Cable

Route Cables

Installing the Switch

Assemble a Filler

Attach the Rails to the Switch

Attach Telco Adapters to the Rack Slides

Attach the Rack Slides to the Rack

Install the Switch Into the Rack

Attach Power Cords

Install the Air Duct and Front Support

Attach Data and Management Cables

Prepare the Front Support and Small Air Duct

Powering On the Switch

Power On the Switch

Oracle ILOM Overview

Verify the DHCP-Assigned IP Address and Host Name

Configure Network Management From the CLI (SER MGT)

Log Into the Oracle ILOM Web (NET MGT)

Log Into the Oracle ILOM CLI (NET MGT)

Log Into the Oracle ILOM CLI (SER MGT)

Configuration

Administering the Switch

Log In to the Oracle ILOM CLI

Create a SEFOS User

Change a SEFOS User Privilege Level

Configure Network Management From the Web Interface

Configure Network Management From the CLI

Log Out of the Oracle ILOM CLI

Update the Firmware

Administering SEFOS

SEFOS Setup Tasks

Understanding SEFOS Basics

Configuring the SEFOS Environment

Managing Configuration Files

Managing Log Files

Configuring the Switching Feature

Switching Feature Topology

Configure Initial Settings

Verify the Configuration

Configure VLAN Forwarding

Verify VLAN Membership

Configure RSTP

Configure LA

Save a Configuration

Configuring the Routing Feature

Routing Feature Topology

Configuring Static Routing

Configuring Dynamic Routing

Disabling Routing

Service

Detecting and Managing Faults

Front Panel LEDs

Rear Panel LEDs

Check Switch Status (LEDs)

Sensors Overview

Check Switch Status (Oracle ILOM)

Component Sensor Targets

Motherboard Sensor Targets

Preparing for Service

ESD Precautions

Tools Needed for Service

Replaceable Components

Remove the Front Support and Air Duct

Remove the CMA

Install the CMA

Servicing Power Supplies

Power Off a Power Supply

Remove a Power Supply

Install a Power Supply

Power On a Power Supply

Servicing the Fan Module

Remove the Fan Module

Install the Fan Module

Glossary

Index

Route Cables

  1. Identify the prerequisite and subsequent installation tasks that you must perform in conjunction with this procedure.

    See Installation Task Overview.

  2. At the remote hosts, begin attaching the data cables to the appropriate connectors.
  3. Route and bundle the data cables to and through the rack, following the appropriate cautions and guidelines.

    See Data Cable Cautions and Data Cable Guidelines.

  4. Bring the data cables to the location in the rack where the switch will install.
  5. Connect the management cables to the appropriate ports of the patch panel or serial device.
  6. Route the management cables to and through the rack, bundling them with the data cables, if convenient to do so.
  7. Bring the management cables to the location in the rack where the switch will install.
  8. Ensure that line power is off at the rack.

    Note - If this is not possible, go to Step 10.


  9. Insert the switch power cord plugs into the line power receptacles.
  10. Route the power cords through the rack, bundling them if necessary.
  11. Bring the power cords to the location in the rack where the switch will install.
  12. Consider your next step.
Related Information