Understanding the Installation
Understanding Management and Power Cabling
Single-Switch Location Guidelines
Attach the Rails to the Switch
Attach Telco Adapters to the Rack Slides
Attach the Rack Slides to the Rack
Install the Air Duct and Front Support
Attach Data and Management Cables
Prepare the Front Support and Small Air Duct
Verify the DHCP-Assigned IP Address and Host Name
Configure Network Management From the CLI (SER MGT)
Log Into the Oracle ILOM Web (NET MGT)
Log Into the Oracle ILOM CLI (NET MGT)
Log Into the Oracle ILOM CLI (SER MGT)
Change a SEFOS User Privilege Level
Configure Network Management From the Web Interface
Configure Network Management From the CLI
Log Out of the Oracle ILOM CLI
Configuring the SEFOS Environment
Configuring the Switching Feature
Configuring the Routing Feature
Check Switch Status (Oracle ILOM)
Note - For single-switch configurations, follow these steps to install the filler as well.
The rectangular opening at the end of the center rail should be toward you.
Then go to Step 5.
If you are installing the switch with the power supplies on the cold aisle, with the power supply end of the switch facing you, lift the switch to the rack on the cold aisle.
If you are installing the switch with the data connectors on the cold aisle, with the data connector end of the switch facing you, lift the switch to the rack on the cold aisle.
See Attach Power Cords.