JavaScript is required to for searching.
Skip Navigation Links
Exit Print View
Oracle Switch ES1-24

Installation Guide

search filter icon
search icon

Document Information

Using This Documentation

Product Notes

Related Documentation

CLI Command Modes

Feedback

Support and Accessibility

Understanding the Installation

Installation Task Overview

Front Panel Components

Rear Panel Components

Confirming Specifications

Physical Specifications

Electrical Specifications

Environmental Specifications

Understanding Cabling

Understanding Management and Power Cabling

Management Connection Overview

NET MGT Port

SER MGT Port

Power Cord Specifications

Understanding Data Cabling

SFP+ Data Cable Overview

10GBASE-T Data Cable Overview

Data Cable Cautions

Data Cable Guidelines

Single-Switch Location Guidelines

Preparing for Installation

ESD Precautions

Tools Needed for Installation

Verify Switch Kit Contents

Verify Rack Rail Kit Contents

Assemble an SFP+ Data Cable

Route Cables

Installing the Switch

Assemble a Filler

Attach the Rails to the Switch

Attach Telco Adapters to the Rack Slides

Attach the Rack Slides to the Rack

Install the Switch Into the Rack

Attach Power Cords

Install the Air Duct and Front Support

Attach Data and Management Cables

Prepare the Front Support and Small Air Duct

Powering On the Switch

Power On the Switch

Oracle ILOM Overview

Verify the DHCP-Assigned IP Address and Host Name

Configure Network Management From the CLI (SER MGT)

Log Into the Oracle ILOM Web (NET MGT)

Log Into the Oracle ILOM CLI (NET MGT)

Log Into the Oracle ILOM CLI (SER MGT)

Glossary

Index

Assemble an SFP+ Data Cable

SFP+ optical data cables might need assembly before installation.


Note - The ends of the optical fiber cable and the receptacles of the transceivers must be clean and optically clear before assembly. Do not remove the protective caps from the optical fiber cable or the plugs from the transceivers until instructed to do so.


  1. Identify the prerequisite and subsequent installation tasks that you must perform in conjunction with this procedure.

    See Installation Task Overview.

  2. Remove the SFP+ optical transceivers and fiber optic cables from their packaging.
  3. Sort the components into groupings ready for assembly.

    You need two SFP+ optical transceivers and a fiber optic cable for each cable to be assembled.

  4. Remove the plug from an SFP+ optical transceiver.
  5. Remove the caps from an LC connector of the fiber optic cable.
  6. Holding the shafts of the LC connector, insert the LC connector into the receptacles of the SFP+ optical transceiver.
    image:Figure shows the LC transceiver and LC connector assembling.

    Note - The LC connector and SFP+ receptacles are keyed for proper fitting.


  7. Push the connector into the transceiver until it clicks.
  8. Repeat from Step 4 for all SFP+ optical transceivers and LC connectors.
  9. Repeat from Step 3 for all data cables to be assembled.
  10. Route the data, power, and management cables.

    See Route Cables.

Related Information