JavaScript is required to for searching.
Skip Navigation Links
Exit Print View
Oracle Switch ES1-24

Installation Guide

search filter icon
search icon

Document Information

Using This Documentation

Product Notes

Related Documentation

CLI Command Modes

Feedback

Support and Accessibility

Understanding the Installation

Installation Task Overview

Front Panel Components

Rear Panel Components

Confirming Specifications

Physical Specifications

Electrical Specifications

Environmental Specifications

Understanding Cabling

Understanding Management and Power Cabling

Management Connection Overview

NET MGT Port

SER MGT Port

Power Cord Specifications

Understanding Data Cabling

SFP+ Data Cable Overview

10GBASE-T Data Cable Overview

Data Cable Cautions

Data Cable Guidelines

Single-Switch Location Guidelines

Preparing for Installation

ESD Precautions

Tools Needed for Installation

Verify Switch Kit Contents

Verify Rack Rail Kit Contents

Assemble an SFP+ Data Cable

Route Cables

Installing the Switch

Assemble a Filler

Attach the Rails to the Switch

Attach Telco Adapters to the Rack Slides

Attach the Rack Slides to the Rack

Install the Switch Into the Rack

Attach Power Cords

Install the Air Duct and Front Support

Attach Data and Management Cables

Prepare the Front Support and Small Air Duct

Powering On the Switch

Power On the Switch

Oracle ILOM Overview

Verify the DHCP-Assigned IP Address and Host Name

Configure Network Management From the CLI (SER MGT)

Log Into the Oracle ILOM Web (NET MGT)

Log Into the Oracle ILOM CLI (NET MGT)

Log Into the Oracle ILOM CLI (SER MGT)

Glossary

Index

Power On the Switch

  1. Identify the prerequisite and subsequent installation tasks that you must perform in conjunction with this procedure.

    See Installation Task Overview.

  2. Perform one or both of the following to energize the power supplies.
    • Plug the power cords into the line power receptacles.

    • Energize the circuit breakers so that the line power receptacles are live.

  3. Verify that the status LEDs for each power supply indicate normal operation.

    The AC LED lights and in a moment, the OK LED should light. The Attention LED should be unlit.


    Note - At this time, power is being supplied to the SP. The SP is effectively on and booting up. You might see the boot sequence on the management console.


  4. Verify that the fans are spinning.

    You should feel air at the fan module, and the fan Attention LEDs should be unlit.

  5. Verify that the switch System OK LED lights.
  6. Access the SP.

    See Powering On the Switch.

Related Information