Go to main content

Oracle® Solaris Cluster Hardware Administration Manual

Exit Print View

Updated: February 2017
 
 

Powering Oracle Solaris Cluster Hardware On and Off

    Consider the following when powering on and powering off cluster hardware.

  • Use shut down and boot procedures in the Oracle Solaris Cluster 4.3 System Administration Guide for nodes in a running cluster.

  • Use the power-on and power-off procedures in the manuals that shipped with the hardware only for systems that are newly installed or are in the process of being installed.


Caution

Caution  -  After the cluster is online and a user application is accessing data on the cluster, do not use the power-on and power-off procedures listed in the manuals that came with the hardware.