This chapter contains the topic:
From Material Planning Operations (G34), choose Single Site Planning
From Single Site Periodic Planning Operations (G3422), choose MRP Regeneration
Use MRP Regeneration to produce a single facility MRP planning schedule for the items that you select. Alternatively, you can use MRP Net Change to produce a single facility MRP planning schedule. You can generate a material requirements plan for:
A single item
All items
Only items that are affected by transactions since the last generation
When you generate a material requirements plan, the system evaluates selected information, performs calculations, and recommends a time-phased replenishment plan for all selected items.
MRP regeneration uses the same programs as DRP/MPS regeneration. The following summarizes these programs:
Verify that MRP/CRP has been set up.
Understand the concepts and terms described in Single Level Master Scheduling. See Section 15, "Overview to Single Level Master Scheduling."
See Also:
|