Go to main content
2/30
List of Figures
1-1 The ERPx system Includes These JD Edwards World Systems
1-2 Processes Affected by the PDM System
2-1 Pieces of Item Information
2-2 Item Master
2-3 Item Master Includes Item Branch Master and Item Location Information Tables
3-1 Item Master Information screen
3-2 Item Alternative Description window
3-3 Text Messages screen
3-4 Classification Codes screen
3-5 Classification Codes screen
3-6 Specifying Item Unit Measurements
3-7 Default Units of Measure screen
3-8 Item Units of Measure screen
3-9 Manufacturing Values Entry screen
4-1 Assigning Master Item Information to a Branch
4-2 Copying Item Information to Different Branches
4-3 Item Branch/Plant Information screen
4-4 Primary Location window
4-5 Item/Location Information screen
4-6 Item/Location Information screen
4-7 Item Branch/Plant Information screen
5-1 Work Center System Integration
5-2 Example: Work Center Layout for Sample Process 777
5-3 Example: Process 777
6-1 Manufacturing Constants screen
6-2 Bill of Material Type screen
6-3 Time Basis Code screen
6-4 Standard Procedure Descriptions screen
6-5 General Message screen
6-6 Shop Floor Calendar screen
6-7 Calendar Generation screen
6-8 Make/Buy Table screen
6-9 Routing Types screen
6-10 Kanban Master Revisions screen
6-11 Kanban Master Revisions screen (Detail area)
7-1 Enter/Change Work Center screen
7-2 Work Center Rate Revisions screen
7-3 Operations by Work Center screen
8-1 Enter/Change Process screen
8-2 Enter/Change Process screen (Details area)
8-3 Process Resource Revisions screen
8-4 Ingredient Substitutes window
8-5 Process Resource Revisions screen
8-6 Process Resource Revisions screen
8-7 Intermediate Product Revisions screen
8-8 Routing Operation Master Text window
8-9 Text Model Selection window
8-10 User Information screen
8-11 Where Used Update report
8-12 Bill of Material Analysis report
8-13 Bill of Material Analysis report
9-1 Ingredients Inquiry screen
9-2 Ingredients Where Used screen
9-3 Co-/By-Products Inquiry screen
9-4 Where Produced Inquiry screen
9-5 Resources Inquiry screen
9-6 Instructions Inquiry screen
9-7 Ingredient Comparison screen
9-8 Single Level Ingredient Report
9-9 Multi-Level Ingredient Report
9-10 Ingredient Where Used Report
9-11 Ingredient Comparison Report
9-12 Standard Routing Information Report
9-13 Process Report
10-1 Leadtime Inquiry screen
11-1 ECO Process
12-1 General User Defined Codes screen, Next Revision Levels field
12-2 General User Defined Codes screen, Work Order/ECO Type field
12-3 Priority Code screen
12-4 Status Code screen
12-5 Phase In Code screen
12-6 Existing Disposition Code screen
12-7 Reason Code screen
12-8 Next Numbers screen
12-9 Approval Routing Master screen
12-10 Order Specific Routing screen
13-1 ECO Workbench screen
13-2 ECO Workbench screen (More Details area)
13-3 Enter/Change ECO screen
13-4 Routing Revisions screen
13-5 Routing Revisions screen (More Details area)
13-6 ECO Parts List screen
13-7 ECO Parts List screen (Detail area)
13-8 ECO Parts List screen (Related Items area)
13-9 ECO Pending Orders screen
13-10 ECO Detail Types screen
14-1 ECO Revision Inquiry screen
14-2 ECO Approval/Audit Review screen
14-3 ECO Open Task Review screen
14-4 Future Bill Inquiry screen
14-5 Batch Quantity/Type Selection screen
14-6 ECO Work Order report
14-7 ECO Summary by Branch/Plant report
15-1 ECO Approval screen
15-2 Bill of Material Population report
B-1 Total queue/move hours calculation
B-2 Standard setup hours calculation
B-3 Level Lead Time calculation
B-4 Per Unit Lead Time calculation
B-5 Cumulative Lead Time calculation
B-6 Manufacturing Lead Time calculation
Scripting on this page enhances content navigation, but does not change the content in any way.